Hybrid Plutonium Fallback #565
Labels
coordinator
Coordinating computer related.
enhancement
New feature or improvement.
feature request
New feature or request from users.
process control
Automatic process control.
supervisor
Supervisory computer related.
Milestone
Is your feature request related to a problem? Please describe.
When Plutonium fallback gets triggered, it appears that it stays locked as-is, completely stopping Polonium production until the reactor is brought to a lower production level.
Describe the solution you'd like
The possibility of a setup where with PU Fallback enabled, Polonium production is either turned on simultaneously, or only while the input/output buffer of the SNAs is overfull, allowing for production of both products on a high-throughput reactor that can produce enough waste to fill both systems.
Additional context
I am admittedly a slight edge case, in that my reactor and SNA are located in a void dimension with permanent day time, which means scaling up Polonium production would completely stop Fallback from occurring.
If this feature is not desired, a similar effect could probably be achieved by way of an "artificial day/night cycle" using pistons disabling SNAs when specific thresholds are met, separate from the SCADA system.