You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Trying to specify EQUIL keywords for a 3-phase run OPM given free-water level (FWL), oil-water level (OWL), and PC in the imbibition and drainage curves. Also the reference depth and reference pressure are provided. There is no initial gas cap and all gas are dissolved (initially). A table of Psat vs depth is available via PBVD keyword.
The manual says EQUIL keywords accepts OWC depth and PC @ OWC as part of the input.
Trying to specify
EQUIL
keywords for a 3-phase run OPM given free-water level (FWL), oil-water level (OWL), and PC in the imbibition and drainage curves. Also the reference depth and reference pressure are provided. There is no initial gas cap and all gas are dissolved (initially). A table of Psat vs depth is available viaPBVD
keyword.The manual says
EQUIL
keywords accepts OWC depth and PC @ OWC as part of the input.In the EQUIL data above, the reference depth and reference pressure are provided at the FWL.
Questions:
Since there is no initial GOC, Is it okay to specify initial GOC as zero in the table
How to set the ? values in the
EQUIL
tableAlso, does OPM allow initialization with drainage Pc (drainage relperms) and use imbibition relperms in production and waterflood.
The text was updated successfully, but these errors were encountered: