From 82d6d536f1e17c9e534309e53fa0de77c1ea5079 Mon Sep 17 00:00:00 2001 From: jh Date: Tue, 5 Sep 2023 16:34:45 -0400 Subject: [PATCH 01/10] added readme v:a.a for slates --- january-slates/readme.md | 107 ++++++++++++++++++++++++++++++++++++++- 1 file changed, 106 insertions(+), 1 deletion(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index b48b7197..5a4e1c3e 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -1 +1,106 @@ -***Needs to be updated*** +[CLAMS.ai](https://clams.ai/) team +Author: Jeremy Huey, Data Annotation Manager @jarumihooi +Annotators: Unknown (GBH), Samantha Driscoll (GBH) +Slates readme.md: version a.a - this version still requires gold generation information. +09/02/2023 +# Slates + +## Goal of the Project +What is a film slate? - "The term film slate is still used to reference the clapper board that appears on the screen when filming. Just like early clappers. +The slate is shown at the beginning of a take immediately prior to the commencement of action." - [Beverly Boy Productions](https://beverlyboy.com/filmmaking/what-does-slate-mean-in-film/#:~:text=The%20term%20film%20slate%20is,the%20term%20slate%20in%20film.). +[More information about slates](https://www.youtube.com/watch?v=Heg6kDxXZ8k&t=13). +[What goes on a slate](theblackandblue.com/2012/11/05/deciphering-film-slate-1/). +This project creates a dataset that annotates where informational frames about the video are located timewise from many videos/GUIDs. +This dataset is needed to power automatic detection of slate information in the video collection at the AAPB. +Many of the collection pieces have incomplete or unverified information about what the video is. +This detected information could be used to verify and update metadata about that collection piece. + +### Project Information +``` +Annotation project name - January Slates +Annotator Demographics (2) - +Unknown (Unknown age, (other demographic information), Lang: Unknown, Organization: GBH) +Samantha Driscoll (Working Professional age, (other demographic information), Lang: Eng US native speaker, Organization: GBH) +Annotation Environment information - + Name: TODO - Unknown + Version: Unknown + Link/Tool Used/User Manual: (See below Tool Installation) +Project changes - + Project Version: Unknown/1.0 + Number of Batches: 1 + Other Version Control Information: None +``` + +### Data Overview +INPUT - a set of video files to be annotated. _TODO: Which tool?_ +INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. +``` +FORMAT: +GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?, +Note the extra commas added in and extra blank columns and extra space within the column names. +``` +``` +EXAMPLE: +cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, +cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, +``` +FINAL PREPARED GOLD OUTPUT - `.tsv` file that seems to be actually comma-separated anyway. The gold files conform to the repository readme guideline that each +gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. Note: the column headers are added to each file. +``` +FORMAT & EXAMPLE: +GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? +cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital,key-value pairs,no +``` + +## Tool Installation: Unknown +_TODO: Tool used is unknown. Follow up questions with Sammy should illuminate this._ + +## Annotation Guidelines: Transcribing/Closed Captioning +_What guidelines were used for this?_ +### Preparation +Multiple videos must be prepared for annotation. +### Process of Annotating + +Per column: +* GUID - the AAPB id for that video e.g. "cpb-aacip-81-881jx33t". +CPB is the [Corporation for Public Broadcasting](https://cpb.org/faq#1-1:~:text=Public%20Broadcasting%20(CPB)%3F-,CPB,-is%20a%20private). +"aacip" is likely a collection name (unverified). +The first number seems to be series number. Eg. 81 is "Woman", and "29" is both Prime Time Wisconsin" and "Wisconsin Week". +The final number which includes letters is the unique guid number. +* (comma) - column of commas: "," +* Series/Group ,- what tv series or group this video belongs to. +* Slate Start ,- When the slate starts appearing. (See Decisions). Format likely "hr:mn:se:fr" out of 30 fps. +* Slate End ,- When the slate stops being shown on screen. (See Decisions) +* Writing Types,- Slates contain written information. Much of this material is from the early days of tv. eg. "handwritten", "typed" or "other" +* Recorded/Digital - _unknown what this column pertains to_ +* (empty) +* (empty) +* (comma) +* format of most of the information - visually how is the textual information presented in the slate? e.g. "boxes to fill in", "key-value pairs", "free text" +* (comma) +* Anything moving on screen during slate? - are there things like animations and other things that are moving during the slate information + +_Note: in some columns there is a comma within the raw value of the column._ + +### Decisions and Differentiations during Annotation +**What denotes start and end** - Decisions as to what exactly constitutes the start and end of the slate times is unknown. Is it when it first starts fading in, or when its fully done fading? + +**Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` line 203 "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". +Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. + +**Time format check** - It is not fully verified what the time format is, however the assumption is as above since the highest last number goes up to 29. +Yet another typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", +`CLAMS_slate_annotation_metadata.csv` line 97 Slate Start "00:00:05;119,", + +**Time format change** - At around line203 or 202 is a note that "sammy started annotating here.". +Shift of time format to only 3 numbers: "xx:xx:xx" assumptively "mn:sc:fr"(?). + +**No slate** - there are valid instances where a video does not have slate information shown within the actual video. Annotate as "no slate" in both Slate Start and Slate End. + +**Skip to new material in raw** - The raw `.csv` file also has an area that is skipped and annotation moved onto new/different videos. +It starts at line 624 and it resumes at line 1409. This might be because all of those GUIDs are the same and more variety in the dataset was needed for better results. +Annotation by Sammy paused/ended with line 1672 being the last annotated row. + +## Gold Generation and Dependencies - Codebase +`requirements.txt` for running the codebase is stored here. +_TODO: to be added_ \ No newline at end of file From 547c4614e826825bd96ceca8ca3433a18667cd8c Mon Sep 17 00:00:00 2001 From: jh Date: Mon, 11 Sep 2023 23:39:29 -0400 Subject: [PATCH 02/10] updated with review requests --- january-slates/readme.md | 21 ++++++++++----------- 1 file changed, 10 insertions(+), 11 deletions(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index 5a4e1c3e..601ba0de 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -1,8 +1,3 @@ -[CLAMS.ai](https://clams.ai/) team -Author: Jeremy Huey, Data Annotation Manager @jarumihooi -Annotators: Unknown (GBH), Samantha Driscoll (GBH) -Slates readme.md: version a.a - this version still requires gold generation information. -09/02/2023 # Slates ## Goal of the Project @@ -17,7 +12,7 @@ This detected information could be used to verify and update metadata about that ### Project Information ``` -Annotation project name - January Slates +Annotation project name - january-slates Annotator Demographics (2) - Unknown (Unknown age, (other demographic information), Lang: Unknown, Organization: GBH) Samantha Driscoll (Working Professional age, (other demographic information), Lang: Eng US native speaker, Organization: GBH) @@ -33,9 +28,9 @@ Project changes - ### Data Overview INPUT - a set of video files to be annotated. _TODO: Which tool?_ -INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. +INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. ``` -FORMAT: +FORMAT: GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?, Note the extra commas added in and extra blank columns and extra space within the column names. ``` @@ -53,10 +48,10 @@ cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital ``` ## Tool Installation: Unknown -_TODO: Tool used is unknown. Follow up questions with Sammy should illuminate this._ +_TODO: Tool used is unknown. Follow-up questions with Sammy should illuminate this._ ## Annotation Guidelines: Transcribing/Closed Captioning -_What guidelines were used for this?_ +_TODO: What guidelines were used for this?_ ### Preparation Multiple videos must be prepared for annotation. ### Process of Annotating @@ -82,12 +77,14 @@ The final number which includes letters is the unique guid number. _Note: in some columns there is a comma within the raw value of the column._ -### Decisions and Differentiations during Annotation +### Decisions, Differentiations, and Precision during Annotation **What denotes start and end** - Decisions as to what exactly constitutes the start and end of the slate times is unknown. Is it when it first starts fading in, or when its fully done fading? **Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` line 203 "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. +**Time format non-conformant** - This is an older project. The time format does not conform to ISO 8601 `hr:mn:sc.msc` yet. + **Time format check** - It is not fully verified what the time format is, however the assumption is as above since the highest last number goes up to 29. Yet another typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", `CLAMS_slate_annotation_metadata.csv` line 97 Slate Start "00:00:05;119,", @@ -101,6 +98,8 @@ Shift of time format to only 3 numbers: "xx:xx:xx" assumptively "mn:sc:fr"(?). It starts at line 624 and it resumes at line 1409. This might be because all of those GUIDs are the same and more variety in the dataset was needed for better results. Annotation by Sammy paused/ended with line 1672 being the last annotated row. +**Time Accuracy** - Recollection and discussion from the annotators (in-progress) is required to note precision levels. + ## Gold Generation and Dependencies - Codebase `requirements.txt` for running the codebase is stored here. _TODO: to be added_ \ No newline at end of file From 88c1cf0d06acf1ee2dce03bfff66ff0683c85c41 Mon Sep 17 00:00:00 2001 From: jarumihooi Date: Tue, 12 Sep 2023 23:21:48 -0400 Subject: [PATCH 03/10] updated with round2 pr reviews --- january-slates/readme.md | 42 ++++++++++++++++++++++------------------ 1 file changed, 23 insertions(+), 19 deletions(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index 601ba0de..b6b0e875 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -27,31 +27,33 @@ Project changes - ``` ### Data Overview -INPUT - a set of video files to be annotated. _TODO: Which tool?_ -INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. -``` -FORMAT: -GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?, -Note the extra commas added in and extra blank columns and extra space within the column names. -``` -``` -EXAMPLE: -cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, -cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, -``` -FINAL PREPARED GOLD OUTPUT - `.tsv` file that seems to be actually comma-separated anyway. The gold files conform to the repository readme guideline that each +* INPUT - a set of video files to be annotated. _TODO: Which tool?_ +* INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. + * Format + * Fields: ```GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?,``` +[!Note] there are extra commas added in and extra blank columns and extra space within the column names. + * Example: + ``` + cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, + cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, + ``` +* FINAL PREPARED GOLD OUTPUT - `.tsv` file that seems to be actually comma-separated anyway. The gold files conform to the repository readme guideline that each gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. Note: the column headers are added to each file. -``` -FORMAT & EXAMPLE: -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital,key-value pairs,no -``` + * Format + * Fields: `GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate?` + * Example: + ``` + GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? + cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital,key-value pairs,no + ``` + [!Note] Each file has the column header in it. ## Tool Installation: Unknown _TODO: Tool used is unknown. Follow-up questions with Sammy should illuminate this._ ## Annotation Guidelines: Transcribing/Closed Captioning _TODO: What guidelines were used for this?_ +This documented [slate types](https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit) but is not a complete guideline. ### Preparation Multiple videos must be prepared for annotation. ### Process of Annotating @@ -80,7 +82,7 @@ _Note: in some columns there is a comma within the raw value of the column._ ### Decisions, Differentiations, and Precision during Annotation **What denotes start and end** - Decisions as to what exactly constitutes the start and end of the slate times is unknown. Is it when it first starts fading in, or when its fully done fading? -**Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` line 203 "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". +**Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. **Time format non-conformant** - This is an older project. The time format does not conform to ISO 8601 `hr:mn:sc.msc` yet. @@ -100,6 +102,8 @@ Annotation by Sammy paused/ended with line 1672 being the last annotated row. **Time Accuracy** - Recollection and discussion from the annotators (in-progress) is required to note precision levels. +> [Validation dataset](https://docs.google.com/spreadsheets/d/1VHEpYmAtBHkIHTzbYtUexRNqALEHLi-3rwzIXtfQG-E/edit#gid=0) was used. More info is to come. + ## Gold Generation and Dependencies - Codebase `requirements.txt` for running the codebase is stored here. _TODO: to be added_ \ No newline at end of file From aef493dfb363ee517b6664dd613dbfdef83d2281 Mon Sep 17 00:00:00 2001 From: jarumihooi Date: Thu, 14 Sep 2023 22:10:46 -0400 Subject: [PATCH 04/10] more progress on slates, still in progress --- january-slates/readme.md | 22 ++++++++++------------ 1 file changed, 10 insertions(+), 12 deletions(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index b6b0e875..e2d71956 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -13,12 +13,10 @@ This detected information could be used to verify and update metadata about that ### Project Information ``` Annotation project name - january-slates -Annotator Demographics (2) - -Unknown (Unknown age, (other demographic information), Lang: Unknown, Organization: GBH) -Samantha Driscoll (Working Professional age, (other demographic information), Lang: Eng US native speaker, Organization: GBH) +Annotator Demographics (2) - Public Broadcasting Organization Media Librarians and Volunteers, age range 20-30, college or masters education Annotation Environment information - - Name: TODO - Unknown - Version: Unknown + Name: Manual google sheets entry + AAPB video viewer + unknown video viewer with frame time + Version: n/a Link/Tool Used/User Manual: (See below Tool Installation) Project changes - Project Version: Unknown/1.0 @@ -27,18 +25,18 @@ Project changes - ``` ### Data Overview -* INPUT - a set of video files to be annotated. _TODO: Which tool?_ +* INPUT - a set of video files to be annotated, preferably openable in mass in a video viewer/tool that has some fraction of a second denomination. * INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. * Format - * Fields: ```GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?,``` -[!Note] there are extra commas added in and extra blank columns and extra space within the column names. + * Fields: ```GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?,``` + [!Note] there are extra commas added in and extra blank columns and extra space within the column names. * Example: ``` cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, ``` * FINAL PREPARED GOLD OUTPUT - `.tsv` file that seems to be actually comma-separated anyway. The gold files conform to the repository readme guideline that each -gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. Note: the column headers are added to each file. +gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. * Format * Fields: `GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate?` * Example: @@ -52,10 +50,10 @@ gold must relate to only one GUID. Therefore, each of these gold files is only 1 _TODO: Tool used is unknown. Follow-up questions with Sammy should illuminate this._ ## Annotation Guidelines: Transcribing/Closed Captioning -_TODO: What guidelines were used for this?_ -This documented [slate types](https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit) but is not a complete guideline. +For a quick overview of [slate types](https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit) please see this. +The verbal guidelines for this project were to annotate as a superinterval/superset times the slate appeared, and details about its appearance. ### Preparation -Multiple videos must be prepared for annotation. +Multiple videos must be prepared to be opened for annotation. ### Process of Annotating Per column: From 98dc0ca86808e1d7dbd16ef5b49000ffd390b4ea Mon Sep 17 00:00:00 2001 From: jarumihooi Date: Mon, 18 Sep 2023 21:49:50 -0400 Subject: [PATCH 05/10] updated slates readme with information from Sammy --- january-slates/readme.md | 37 ++++++++++++++++++++++++++----------- 1 file changed, 26 insertions(+), 11 deletions(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index e2d71956..95261173 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -46,13 +46,16 @@ gold must relate to only one GUID. Therefore, each of these gold files is only 1 ``` [!Note] Each file has the column header in it. -## Tool Installation: Unknown -_TODO: Tool used is unknown. Follow-up questions with Sammy should illuminate this._ +## Tool Installation: None +This annotation was done manually by entering information into a Google Sheet. +Multiple videos were prepared or downloaded or were accessed from an AAPB terminal. +Videos were opened in the AAPB viewer or in some unknown tool that had time information up to division by 30 frames per second. ## Annotation Guidelines: Transcribing/Closed Captioning For a quick overview of [slate types](https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit) please see this. The verbal guidelines for this project were to annotate as a superinterval/superset times the slate appeared, and details about its appearance. ### Preparation +A google sheet must be prepared to annotate the below columns. Multiple videos must be prepared to be opened for annotation. ### Process of Annotating @@ -67,7 +70,7 @@ The final number which includes letters is the unique guid number. * Slate Start ,- When the slate starts appearing. (See Decisions). Format likely "hr:mn:se:fr" out of 30 fps. * Slate End ,- When the slate stops being shown on screen. (See Decisions) * Writing Types,- Slates contain written information. Much of this material is from the early days of tv. eg. "handwritten", "typed" or "other" -* Recorded/Digital - _unknown what this column pertains to_ +* Recorded/Digital - _TODO:unknown what this column pertains to_ * (empty) * (empty) * (comma) @@ -78,19 +81,24 @@ The final number which includes letters is the unique guid number. _Note: in some columns there is a comma within the raw value of the column._ ### Decisions, Differentiations, and Precision during Annotation -**What denotes start and end** - Decisions as to what exactly constitutes the start and end of the slate times is unknown. Is it when it first starts fading in, or when its fully done fading? +**What denotes start and end** - This project was done with the annotation time as a superinterval. +This means the annotation will begin on a time/frame without the slate where possible (or 00:00:00.000) +and is annotated as ending after the slate has disappeared. +(This is currently unvalidated.) +> [!Note] +> This is opposite to the decision made in the January Chyrons project. **Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. **Time format non-conformant** - This is an older project. The time format does not conform to ISO 8601 `hr:mn:sc.msc` yet. -**Time format check** - It is not fully verified what the time format is, however the assumption is as above since the highest last number goes up to 29. -Yet another typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", +**Time format typos** - A typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", `CLAMS_slate_annotation_metadata.csv` line 97 Slate Start "00:00:05;119,", -**Time format change** - At around line203 or 202 is a note that "sammy started annotating here.". -Shift of time format to only 3 numbers: "xx:xx:xx" assumptively "mn:sc:fr"(?). +**Time format change** - At around line203 is a note that "sammy started annotating here.". +Shift of time format to only 3 numbers: "xx:xx:xx". This is confirmed as hh:mm:ss (no frames!) since the AAPB viewer used did not +offer frame precision. **No slate** - there are valid instances where a video does not have slate information shown within the actual video. Annotate as "no slate" in both Slate Start and Slate End. @@ -98,10 +106,17 @@ Shift of time format to only 3 numbers: "xx:xx:xx" assumptively "mn:sc:fr"(?). It starts at line 624 and it resumes at line 1409. This might be because all of those GUIDs are the same and more variety in the dataset was needed for better results. Annotation by Sammy paused/ended with line 1672 being the last annotated row. -**Time Accuracy** - Recollection and discussion from the annotators (in-progress) is required to note precision levels. +**Time Precision** - Because of the time format change, it should be assumed that the numbers without frames is only precise down to the second. +The precision of the other annotations with frame precision is unverified. + -> [Validation dataset](https://docs.google.com/spreadsheets/d/1VHEpYmAtBHkIHTzbYtUexRNqALEHLi-3rwzIXtfQG-E/edit#gid=0) was used. More info is to come. ## Gold Generation and Dependencies - Codebase `requirements.txt` for running the codebase is stored here. -_TODO: to be added_ \ No newline at end of file +_TODO: to be added_ + +## Evaluation Dataset +> [Evaluation dataset](https://docs.google.com/spreadsheets/d/1VHEpYmAtBHkIHTzbYtUexRNqALEHLi-3rwzIXtfQG-E/edit#gid=0) + +In 2020, an evaluation of the performance of the slates app tool was done by GBH. This is the result of it, comparing the output +prediction of the app to the judgment of a human annotator. \ No newline at end of file From c9475b7596bf8d8877dffdee1698143f8006b793 Mon Sep 17 00:00:00 2001 From: jarumihooi Date: Mon, 18 Sep 2023 21:52:16 -0400 Subject: [PATCH 06/10] updated slates readme with information from Sammy, corrected typo --- january-slates/readme.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index 95261173..f907f25f 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -86,7 +86,7 @@ This means the annotation will begin on a time/frame without the slate where pos and is annotated as ending after the slate has disappeared. (This is currently unvalidated.) > [!Note] -> This is opposite to the decision made in the January Chyrons project. +> This is opposite to the decision made in the Chyrons project. **Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. From 6144f9e0900569b2af570744a02689e08365eb62 Mon Sep 17 00:00:00 2001 From: Keigh Rim Date: Fri, 22 Sep 2023 20:09:12 -0400 Subject: [PATCH 07/10] took out data section of `january-slates` readme, bulletized other sec --- batches/aapb-collaboration-7.txt | 1 + january-slates/readme.md | 125 ++++++++++++------------------- 2 files changed, 49 insertions(+), 77 deletions(-) diff --git a/batches/aapb-collaboration-7.txt b/batches/aapb-collaboration-7.txt index a360fe28..4f891ccf 100644 --- a/batches/aapb-collaboration-7.txt +++ b/batches/aapb-collaboration-7.txt @@ -1,3 +1,4 @@ +# see https://github.com/clamsproject/aapb-collaboration/issues/7 for more info cpb-aacip-81-881jx33t cpb-aacip-41-34fn32g7 cpb-aacip-29-01pg4g2x diff --git a/january-slates/readme.md b/january-slates/readme.md index f907f25f..c452c4c7 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -1,50 +1,32 @@ # Slates ## Goal of the Project -What is a film slate? - "The term film slate is still used to reference the clapper board that appears on the screen when filming. Just like early clappers. -The slate is shown at the beginning of a take immediately prior to the commencement of action." - [Beverly Boy Productions](https://beverlyboy.com/filmmaking/what-does-slate-mean-in-film/#:~:text=The%20term%20film%20slate%20is,the%20term%20slate%20in%20film.). -[More information about slates](https://www.youtube.com/watch?v=Heg6kDxXZ8k&t=13). -[What goes on a slate](theblackandblue.com/2012/11/05/deciphering-film-slate-1/). + +### What is a film slate? +> "The term film slate is still used to reference the clapper board that appears on the screen when filming. Just like early clappers. The slate is shown at the beginning of a take immediately prior to the commencement of action." - [Beverly Boy Productions](https://beverlyboy.com/filmmaking/what-does-slate-mean-in-film/#:~:text=The%20term%20film%20slate%20is,the%20term%20slate%20in%20film.). + +* [More information about slates](https://www.youtube.com/watch?v=Heg6kDxXZ8k&t=13). +* [What goes on a slate](theblackandblue.com/2012/11/05/deciphering-film-slate-1/). + This project creates a dataset that annotates where informational frames about the video are located timewise from many videos/GUIDs. This dataset is needed to power automatic detection of slate information in the video collection at the AAPB. Many of the collection pieces have incomplete or unverified information about what the video is. This detected information could be used to verify and update metadata about that collection piece. ### Project Information -``` -Annotation project name - january-slates -Annotator Demographics (2) - Public Broadcasting Organization Media Librarians and Volunteers, age range 20-30, college or masters education -Annotation Environment information - - Name: Manual google sheets entry + AAPB video viewer + unknown video viewer with frame time - Version: n/a - Link/Tool Used/User Manual: (See below Tool Installation) -Project changes - - Project Version: Unknown/1.0 - Number of Batches: 1 - Other Version Control Information: None -``` - -### Data Overview -* INPUT - a set of video files to be annotated, preferably openable in mass in a video viewer/tool that has some fraction of a second denomination. -* INTERMEDIATE RAW OUTPUT - `.csv` file where each line is the time of when the slate frames appear in that video. - * Format - * Fields: ```GUID,",","Series/Group ,","Slate Start ,","Slate End ,","Writing Types,",Recorded/Digital,,,",",format of most of the information,",",Anything moving on screen during slate?,``` - [!Note] there are extra commas added in and extra blank columns and extra space within the column names. - * Example: - ``` - cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, - cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, - ``` -* FINAL PREPARED GOLD OUTPUT - `.tsv` file that seems to be actually comma-separated anyway. The gold files conform to the repository readme guideline that each -gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. - * Format - * Fields: `GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate?` - * Example: - ``` - GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? - cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital,key-value pairs,no - ``` - [!Note] Each file has the column header in it. +* Annotation project name - `january-slates` +* Annotator Demographics + * Number of annotators - Two + * Occupational description - Two Public Broadcasting Organization Media Librarians and Volunteers + * Age range - 20s + * Education - college or masters education +* Annotation Environment information + * Name - Manual google sheets entry + AAPB video viewer + unknown video viewer with frame time + * Version - n/a + * Link/Tool Used/User Manual - (See below Tool Installation) +* Project changes + * Number of Batches - 1 + * Other Version Control Information - None ## Tool Installation: None This annotation was done manually by entering information into a Google Sheet. @@ -60,63 +42,52 @@ Multiple videos must be prepared to be opened for annotation. ### Process of Annotating Per column: -* GUID - the AAPB id for that video e.g. "cpb-aacip-81-881jx33t". -CPB is the [Corporation for Public Broadcasting](https://cpb.org/faq#1-1:~:text=Public%20Broadcasting%20(CPB)%3F-,CPB,-is%20a%20private). -"aacip" is likely a collection name (unverified). -The first number seems to be series number. Eg. 81 is "Woman", and "29" is both Prime Time Wisconsin" and "Wisconsin Week". -The final number which includes letters is the unique guid number. -* (comma) - column of commas: "," -* Series/Group ,- what tv series or group this video belongs to. -* Slate Start ,- When the slate starts appearing. (See Decisions). Format likely "hr:mn:se:fr" out of 30 fps. -* Slate End ,- When the slate stops being shown on screen. (See Decisions) -* Writing Types,- Slates contain written information. Much of this material is from the early days of tv. eg. "handwritten", "typed" or "other" -* Recorded/Digital - _TODO:unknown what this column pertains to_ -* (empty) -* (empty) -* (comma) -* format of most of the information - visually how is the textual information presented in the slate? e.g. "boxes to fill in", "key-value pairs", "free text" -* (comma) -* Anything moving on screen during slate? - are there things like animations and other things that are moving during the slate information - -_Note: in some columns there is a comma within the raw value of the column._ +* `GUID` - the AAPB id for that video e.g. "cpb-aacip-81-881jx33t". +> [!note] +> CPB is the [Corporation for Public Broadcasting](https://cpb.org/faq#1-1:~:text=Public%20Broadcasting%20(CPB)%3F-,CPB,-is%20a%20private). +> "aacip" is likely a collection name (unverified). +> The first number seems to be series number. Eg. 81 is "Woman", and "29" is both Prime Time Wisconsin" and "Wisconsin Week". +> The final number which includes letters is the unique guid number. +* `Series/Group` - what tv series or group this video belongs to. +* `Slate Start` - When the slate starts appearing. (See Decisions). Format likely "hr:mn:se:fr" out of 30 fps. +* `Slate End` - When the slate stops being shown on screen. (See Decisions) +* `Writing Types` - Slates contain written information. Much of this material is from the early days of tv. eg. "handwritten", "typed" or "other" +* `Recorded/Digital` - Whether the video is recorded by camera or digitally encoded. +* `format of most of the information` - visually how is the textual information presented in the slate? e.g. "boxes to fill in", "key-value pairs", "free text" +* `Anything moving on screen during slate?` - are there things like animations and other things that are moving during the slate information ### Decisions, Differentiations, and Precision during Annotation -**What denotes start and end** - This project was done with the annotation time as a superinterval. +* **What denotes start and end** - This project was done with the annotation time as a superinterval. This means the annotation will begin on a time/frame without the slate where possible (or 00:00:00.000) and is annotated as ending after the slate has disappeared. (This is currently unvalidated.) > [!Note] -> This is opposite to the decision made in the Chyrons project. +> This is opposite to the decision made in the Chyrons project. -**Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". -Further work should be done to check for other errors of this type. A bash script search would likely need to be run to find out if that error made it into the gold format `.tsv` files also. +* **Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". +Further work should be done to check for other errors of this type. The `process.py` script should also be aware of these obvious errors, and fix and/or clean them up in the gold files. -**Time format non-conformant** - This is an older project. The time format does not conform to ISO 8601 `hr:mn:sc.msc` yet. +* **Time format non-conformant** - This is an older project. The time format does not conform to ISO 8601 `hr:mn:sc.msc` yet. -**Time format typos** - A typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", +* **Time format typos** - A typo seems to appear however in two cases of numbers like this: `CLAMS_slate_annotation_metadata.csv` line 77 Slate End "00:00:27;110,", `CLAMS_slate_annotation_metadata.csv` line 97 Slate Start "00:00:05;119,", -**Time format change** - At around line203 is a note that "sammy started annotating here.". -Shift of time format to only 3 numbers: "xx:xx:xx". This is confirmed as hh:mm:ss (no frames!) since the AAPB viewer used did not -offer frame precision. +* **Time format change** - At around line203 is a note that `sammy started annotating here.`. +Shift of time format to only 3 numbers: "xx:xx:xx". This is confirmed as hh:mm:ss (no milliseconds!) since the AAPB viewer used did not offer sub-seconds precision. -**No slate** - there are valid instances where a video does not have slate information shown within the actual video. Annotate as "no slate" in both Slate Start and Slate End. +* **No slate** - there are valid instances where a video does not have slate information shown within the actual video. Annotate as "no slate" in both Slate Start and Slate End. -**Skip to new material in raw** - The raw `.csv` file also has an area that is skipped and annotation moved onto new/different videos. +* **Skip to new material in raw** - The raw `.csv` file also has an area that is skipped and annotation moved onto new/different videos. It starts at line 624 and it resumes at line 1409. This might be because all of those GUIDs are the same and more variety in the dataset was needed for better results. -Annotation by Sammy paused/ended with line 1672 being the last annotated row. +Annotation by the 2nd annotator paused/ended with line 1672 being the last annotated row. -**Time Precision** - Because of the time format change, it should be assumed that the numbers without frames is only precise down to the second. +* **Time Precision** - Because of the time format change, it should be assumed that the numbers without frames is only precise down to the second. The precision of the other annotations with frame precision is unverified. +## See also - -## Gold Generation and Dependencies - Codebase -`requirements.txt` for running the codebase is stored here. -_TODO: to be added_ - -## Evaluation Dataset +### 2020 Evaluation Dataset > [Evaluation dataset](https://docs.google.com/spreadsheets/d/1VHEpYmAtBHkIHTzbYtUexRNqALEHLi-3rwzIXtfQG-E/edit#gid=0) In 2020, an evaluation of the performance of the slates app tool was done by GBH. This is the result of it, comparing the output -prediction of the app to the judgment of a human annotator. \ No newline at end of file +prediction of the app to the judgment of a human annotator. The annotation generated for the evaluation process weren't used in this `january-slates` project. From dc1372634a545d65c1144c336f1e5d454de49280 Mon Sep 17 00:00:00 2001 From: Keigh Rim Date: Fri, 22 Sep 2023 20:41:01 -0400 Subject: [PATCH 08/10] added data section back, updated process.py and gold data files --- README.md | 13 +++- .../cpb-aacip-129-000003cx.tsv | 2 - .../cpb-aacip-129-000003dn.tsv | 2 - .../cpb-aacip-129-009w0zrj.tsv | 2 - .../cpb-aacip-129-009w108r.tsv | 2 - .../cpb-aacip-129-009w109g.tsv | 2 - .../cpb-aacip-129-00ns1w7z.tsv | 2 - .../cpb-aacip-129-00ns1w8p.tsv | 2 - .../cpb-aacip-129-00ns1w9d.tsv | 2 - .../cpb-aacip-129-010p2rqj.tsv | 2 - .../cpb-aacip-129-010p2s01.tsv | 2 - .../cpb-aacip-129-010p2s1r.tsv | 2 - .../cpb-aacip-129-01bk3p94.tsv | 2 - .../cpb-aacip-129-01bk3pbv.tsv | 2 - .../cpb-aacip-129-01bk3pck.tsv | 2 - .../cpb-aacip-129-01bk3pd9.tsv | 2 - .../cpb-aacip-129-01bk3pf1.tsv | 2 - .../cpb-aacip-129-01pg4jn8.tsv | 2 - .../cpb-aacip-129-01pg4jp0.tsv | 2 - .../cpb-aacip-129-021c5drw.tsv | 2 - .../cpb-aacip-129-02c86b5v.tsv | 2 - .../cpb-aacip-129-02c86b6k.tsv | 2 - .../cpb-aacip-129-02c86b79.tsv | 2 - .../cpb-aacip-129-02c86bpq.tsv | 2 - .../cpb-aacip-129-02c86bqf.tsv | 2 - .../cpb-aacip-129-02c86br5.tsv | 2 - .../cpb-aacip-129-02c86bsw.tsv | 2 - .../cpb-aacip-129-02q57728.tsv | 2 - .../cpb-aacip-129-02q577f7.tsv | 2 - .../cpb-aacip-129-02q577gz.tsv | 2 - .../cpb-aacip-129-0322848r.tsv | 2 - .../cpb-aacip-129-0322849g.tsv | 2 - .../cpb-aacip-129-032284b6.tsv | 2 - .../cpb-aacip-129-032284cx.tsv | 2 - .../cpb-aacip-129-032284dn.tsv | 2 - .../cpb-aacip-129-032284fc.tsv | 2 - .../cpb-aacip-129-03cz91m0.tsv | 2 - .../cpb-aacip-129-03cz91nq.tsv | 2 - .../cpb-aacip-129-03cz91pf.tsv | 2 - .../cpb-aacip-129-03qv9w9q.tsv | 2 - .../cpb-aacip-129-03qv9wbf.tsv | 2 - .../cpb-aacip-129-03qv9wc5.tsv | 2 - .../cpb-aacip-129-042rbs7d.tsv | 2 - .../cpb-aacip-129-042rbs84.tsv | 2 - .../cpb-aacip-129-042rbsvf.tsv | 2 - .../cpb-aacip-129-042rbsw5.tsv | 2 - .../cpb-aacip-129-042rbsxw.tsv | 2 - .../cpb-aacip-129-04dncnzh.tsv | 2 - .../cpb-aacip-129-04dncpfb.tsv | 2 - .../cpb-aacip-129-04rjdk17.tsv | 2 - .../cpb-aacip-129-04rjdk2z.tsv | 2 - .../cpb-aacip-129-04rjdk3p.tsv | 2 - .../cpb-aacip-129-04rjdk4d.tsv | 2 - .../cpb-aacip-129-04rjdk54.tsv | 2 - .../cpb-aacip-129-04rjdk6v.tsv | 2 - .../cpb-aacip-129-053ffgdb.tsv | 2 - .../cpb-aacip-129-053ffgrk.tsv | 2 - .../cpb-aacip-129-053ffgs9.tsv | 2 - .../cpb-aacip-129-053ffgt1.tsv | 2 - .../cpb-aacip-129-05fbgbzt.tsv | 2 - .../cpb-aacip-129-05fbgcbg.tsv | 2 - .../cpb-aacip-129-05fbgcc6.tsv | 2 - .../cpb-aacip-129-05fbgcdx.tsv | 2 - .../cpb-aacip-129-05s7h80t.tsv | 2 - .../cpb-aacip-129-05s7h81j.tsv | 2 - .../cpb-aacip-129-05s7h828.tsv | 2 - .../cpb-aacip-129-0644j42q.tsv | 2 - .../cpb-aacip-129-0644j4kk.tsv | 2 - .../cpb-aacip-129-06g1k1vz.tsv | 2 - .../cpb-aacip-129-06g1k28b.tsv | 2 - .../cpb-aacip-129-06g1k292.tsv | 2 - .../cpb-aacip-129-06g1k2bs.tsv | 2 - .../cpb-aacip-129-06g1k2ch.tsv | 2 - .../cpb-aacip-129-06sxkwx2.tsv | 2 - .../cpb-aacip-129-06sxkwzs.tsv | 2 - .../cpb-aacip-129-06sxkxdw.tsv | 2 - .../cpb-aacip-129-06sxkxfm.tsv | 2 - .../cpb-aacip-129-06sxkxgb.tsv | 2 - .../cpb-aacip-129-06sxkxh2.tsv | 2 - .../cpb-aacip-129-06sxkxjs.tsv | 2 - .../cpb-aacip-129-074tmv5n.tsv | 2 - .../cpb-aacip-129-074tmv6c.tsv | 2 - .../cpb-aacip-129-074tmv73.tsv | 2 - .../cpb-aacip-129-074tmv8t.tsv | 2 - .../cpb-aacip-129-074tmv9j.tsv | 2 - .../cpb-aacip-129-074tmvb8.tsv | 2 - .../cpb-aacip-129-074tmvc0.tsv | 2 - .../cpb-aacip-129-07gqnr7p.tsv | 2 - .../cpb-aacip-129-07gqnr8d.tsv | 2 - .../cpb-aacip-129-07tmpmmj.tsv | 2 - .../cpb-aacip-129-07tmpmn8.tsv | 2 - .../cpb-aacip-129-07tmpmp0.tsv | 2 - .../cpb-aacip-129-07tmpmqq.tsv | 2 - .../cpb-aacip-129-085hqhbw.tsv | 2 - .../cpb-aacip-129-085hqhcm.tsv | 2 - .../cpb-aacip-129-085hqhdb.tsv | 2 - .../cpb-aacip-129-085hqhf2.tsv | 2 - .../cpb-aacip-129-08hdrc8b.tsv | 2 - .../cpb-aacip-129-08hdrcn9.tsv | 2 - .../cpb-aacip-129-08hdrcp1.tsv | 2 - .../cpb-aacip-129-08hdrcqr.tsv | 2 - .../cpb-aacip-129-08hdrcrg.tsv | 2 - .../cpb-aacip-129-08hdrctx.tsv | 2 - .../cpb-aacip-129-08hdrcvn.tsv | 2 - .../cpb-aacip-129-08v9s8dt.tsv | 2 - .../cpb-aacip-129-08v9s91j.tsv | 2 - .../cpb-aacip-129-08v9s928.tsv | 2 - .../cpb-aacip-129-08v9s930.tsv | 2 - .../cpb-aacip-129-08v9s94q.tsv | 2 - .../cpb-aacip-129-08v9s95f.tsv | 2 - .../cpb-aacip-129-0966t5qg.tsv | 2 - .../cpb-aacip-129-0966t634.tsv | 2 - .../cpb-aacip-129-0966t64v.tsv | 2 - .../cpb-aacip-129-0966t65k.tsv | 2 - .../cpb-aacip-129-0966t669.tsv | 2 - .../cpb-aacip-129-0966t671.tsv | 2 - .../cpb-aacip-129-0966t68r.tsv | 2 - .../cpb-aacip-129-09j3v318.tsv | 2 - .../cpb-aacip-129-09j3v320.tsv | 2 - .../cpb-aacip-129-09j3v33q.tsv | 2 - .../cpb-aacip-129-09j3v34f.tsv | 2 - .../cpb-aacip-129-09w0vzcr.tsv | 2 - .../cpb-aacip-129-09w0vzdg.tsv | 2 - .../cpb-aacip-129-106wwvmc.tsv | 2 - .../cpb-aacip-129-106wwvn3.tsv | 2 - .../cpb-aacip-129-106wwvpt.tsv | 2 - .../cpb-aacip-129-10jsxqr5.tsv | 2 - .../cpb-aacip-129-10wpzmxc.tsv | 2 - .../cpb-aacip-129-10wpzmz3.tsv | 2 - .../cpb-aacip-129-10wpznbr.tsv | 2 - .../cpb-aacip-129-10wpzncg.tsv | 2 - .../cpb-aacip-129-10wpznd6.tsv | 2 - .../cpb-aacip-129-117m0hmm.tsv | 2 - .../cpb-aacip-129-117m0hnb.tsv | 2 - .../cpb-aacip-129-117m0hp2.tsv | 2 - .../cpb-aacip-129-11kh1dst.tsv | 2 - .../cpb-aacip-129-11kh1dtj.tsv | 2 - .../cpb-aacip-129-11xd29f5.tsv | 2 - .../cpb-aacip-129-11xd29x9.tsv | 2 - .../cpb-aacip-129-11xd29z1.tsv | 2 - .../cpb-aacip-129-11xd2b0f.tsv | 2 - .../cpb-aacip-129-11xd2b15.tsv | 2 - .../cpb-aacip-129-11xd2b2w.tsv | 2 - .../cpb-aacip-129-11xd2b3m.tsv | 2 - .../cpb-aacip-129-128936f9.tsv | 2 - .../cpb-aacip-129-128936g1.tsv | 2 - .../cpb-aacip-129-128936hr.tsv | 2 - .../cpb-aacip-129-128936jg.tsv | 2 - .../cpb-aacip-129-128936k6.tsv | 2 - .../cpb-aacip-129-128936mx.tsv | 2 - .../cpb-aacip-129-128936nn.tsv | 2 - .../cpb-aacip-129-12m6433n.tsv | 2 - .../cpb-aacip-129-12m6434c.tsv | 2 - .../cpb-aacip-129-12m64353.tsv | 2 - .../cpb-aacip-129-12z35074.tsv | 2 - .../cpb-aacip-129-12z3508v.tsv | 2 - .../cpb-aacip-129-12z3509k.tsv | 2 - .../cpb-aacip-129-12z350b9.tsv | 2 - .../cpb-aacip-129-13905vnm.tsv | 2 - .../cpb-aacip-129-13905vpb.tsv | 2 - .../cpb-aacip-129-13905w20.tsv | 2 - .../cpb-aacip-129-13905w3q.tsv | 2 - .../cpb-aacip-129-13905w4f.tsv | 2 - .../cpb-aacip-129-13905w55.tsv | 2 - .../cpb-aacip-129-13mw6rz4.tsv | 2 - .../cpb-aacip-129-13mw6s0j.tsv | 2 - .../cpb-aacip-129-13mw6s18.tsv | 2 - .../cpb-aacip-129-13mw6s20.tsv | 2 - .../cpb-aacip-129-13mw6s3q.tsv | 2 - .../cpb-aacip-129-13zs7nrc.tsv | 2 - .../cpb-aacip-129-149p8j6x.tsv | 2 - .../cpb-aacip-129-149p8jp2.tsv | 2 - .../cpb-aacip-129-149p8jqs.tsv | 2 - .../cpb-aacip-129-149p8jrh.tsv | 2 - .../cpb-aacip-129-149p8js7.tsv | 2 - .../cpb-aacip-129-149p8jtz.tsv | 2 - .../cpb-aacip-129-149p8jvp.tsv | 2 - .../cpb-aacip-129-14nk9fh1.tsv | 2 - .../cpb-aacip-129-150gbb9t.tsv | 2 - .../cpb-aacip-129-15bcc6xr.tsv | 2 - .../cpb-aacip-129-15p8d3jc.tsv | 2 - .../cpb-aacip-129-15p8d3vw.tsv | 2 - .../cpb-aacip-129-1615f209.tsv | 2 - .../cpb-aacip-129-1615f211.tsv | 2 - .../cpb-aacip-129-1615f22r.tsv | 2 - .../cpb-aacip-129-16pzgsmw.tsv | 2 - .../cpb-aacip-129-171vhpcz.tsv | 2 - .../cpb-aacip-129-171vhpz8.tsv | 2 - .../cpb-aacip-129-171vhq0p.tsv | 2 - .../cpb-aacip-129-171vhq1d.tsv | 2 - .../cpb-aacip-129-171vhq24.tsv | 2 - .../cpb-aacip-129-171vhq3v.tsv | 2 - .../cpb-aacip-129-17crjk7n.tsv | 2 - .../cpb-aacip-129-17crjk8c.tsv | 2 - .../cpb-aacip-129-17crjk93.tsv | 2 - .../cpb-aacip-129-17crjkbt.tsv | 2 - .../cpb-aacip-129-17qnkgg9.tsv | 2 - .../cpb-aacip-129-17qnkgh1.tsv | 2 - .../cpb-aacip-129-17qnkgjr.tsv | 2 - .../cpb-aacip-129-182jmc2r.tsv | 2 - .../cpb-aacip-129-182jmc3g.tsv | 2 - .../cpb-aacip-129-182jmc46.tsv | 2 - .../cpb-aacip-129-182jmc5x.tsv | 2 - .../cpb-aacip-129-18dfn8g1.tsv | 2 - .../cpb-aacip-129-18rbp4wm.tsv | 2 - .../cpb-aacip-129-18rbp4xb.tsv | 2 - .../cpb-aacip-129-18rbp4z2.tsv | 2 - .../cpb-aacip-129-18rbp50g.tsv | 2 - .../cpb-aacip-129-1937q1sk.tsv | 2 - .../cpb-aacip-129-1937q1t9.tsv | 2 - .../cpb-aacip-129-1937q1v1.tsv | 2 - .../cpb-aacip-129-1937q1wr.tsv | 2 - .../cpb-aacip-129-1937q1xg.tsv | 2 - .../cpb-aacip-129-19f4qxsh.tsv | 2 - .../cpb-aacip-129-19f4qz20.tsv | 2 - .../cpb-aacip-129-19f4qz3q.tsv | 2 - .../cpb-aacip-129-19f4qz4f.tsv | 2 - .../cpb-aacip-129-19f4qz55.tsv | 2 - .../cpb-aacip-129-19f4qz6w.tsv | 2 - .../cpb-aacip-129-19f4qz7m.tsv | 2 - .../cpb-aacip-129-19s1rtd4.tsv | 2 - .../cpb-aacip-129-19s1rtfv.tsv | 2 - .../cpb-aacip-129-203xsqcz.tsv | 2 - .../cpb-aacip-129-203xsqdp.tsv | 2 - .../cpb-aacip-129-203xsqfd.tsv | 2 - .../cpb-aacip-129-203xsqg4.tsv | 2 - .../cpb-aacip-129-203xsqhv.tsv | 2 - .../cpb-aacip-129-203xsqjk.tsv | 2 - .../cpb-aacip-129-203xsqk9.tsv | 2 - .../cpb-aacip-129-20fttm6x.tsv | 2 - .../cpb-aacip-129-20fttm7n.tsv | 2 - .../cpb-aacip-129-20fttm8c.tsv | 2 - .../cpb-aacip-129-20fttm93.tsv | 2 - .../cpb-aacip-129-20fttmbt.tsv | 2 - .../cpb-aacip-129-214mwcnc.tsv | 2 - .../cpb-aacip-129-214mwcp3.tsv | 2 - .../cpb-aacip-129-214mwcqt.tsv | 2 - .../cpb-aacip-129-214mwd7c.tsv | 2 - .../cpb-aacip-129-214mwd83.tsv | 2 - .../cpb-aacip-129-21ghx8qd.tsv | 2 - .../cpb-aacip-129-21ghx967.tsv | 2 - .../cpb-aacip-129-21ghx97z.tsv | 2 - .../cpb-aacip-129-21ghx98p.tsv | 2 - .../cpb-aacip-129-21tdz599.tsv | 2 - .../cpb-aacip-129-225b02ch.tsv | 2 - .../cpb-aacip-129-225b02vn.tsv | 2 - .../cpb-aacip-129-22h70x8k.tsv | 2 - .../cpb-aacip-129-22h70xwm.tsv | 2 - .../cpb-aacip-129-22h70xxb.tsv | 2 - .../cpb-aacip-129-22h70xz2.tsv | 2 - .../cpb-aacip-129-22h70z0g.tsv | 2 - .../cpb-aacip-129-22v41v37.tsv | 2 - .../cpb-aacip-129-22v41vkc.tsv | 2 - .../cpb-aacip-129-22v41vm3.tsv | 2 - .../cpb-aacip-129-23612r2n.tsv | 2 - .../cpb-aacip-129-23612r3c.tsv | 2 - .../cpb-aacip-129-23612r43.tsv | 2 - .../cpb-aacip-129-23612r5t.tsv | 2 - .../cpb-aacip-129-23612r6j.tsv | 2 - .../cpb-aacip-129-23hx3ngb.tsv | 2 - .../cpb-aacip-129-23vt4j3z.tsv | 2 - .../cpb-aacip-129-23vt4j4p.tsv | 2 - .../cpb-aacip-129-24jm6b6v.tsv | 2 - .../cpb-aacip-129-24jm6b7k.tsv | 2 - .../cpb-aacip-129-24jm6b89.tsv | 2 - .../cpb-aacip-129-24wh75mr.tsv | 2 - .../cpb-aacip-129-24wh75z0.tsv | 2 - .../cpb-aacip-129-24wh760d.tsv | 2 - .../cpb-aacip-129-257d82mw.tsv | 2 - .../cpb-aacip-129-257d830j.tsv | 2 - .../cpb-aacip-129-257d8318.tsv | 2 - .../cpb-aacip-129-25k9905r.tsv | 2 - .../cpb-aacip-129-25k990kf.tsv | 2 - .../cpb-aacip-129-25k990m5.tsv | 2 - .../cpb-aacip-129-25x69w02.tsv | 2 - .../cpb-aacip-129-25x69w1s.tsv | 2 - .../cpb-aacip-129-25x69w2h.tsv | 2 - .../cpb-aacip-129-25x69w37.tsv | 2 - .../cpb-aacip-129-25x69w4z.tsv | 2 - .../cpb-aacip-129-2683brfx.tsv | 2 - .../cpb-aacip-129-2683brgn.tsv | 2 - .../cpb-aacip-129-2683brhc.tsv | 2 - .../cpb-aacip-129-26m0cnq9.tsv | 2 - .../cpb-aacip-129-26m0cnr1.tsv | 2 - .../cpb-aacip-129-26m0cnsr.tsv | 2 - .../cpb-aacip-129-26m0cntg.tsv | 2 - .../cpb-aacip-129-26m0cnv6.tsv | 2 - .../cpb-aacip-129-26m0cnwx.tsv | 2 - .../cpb-aacip-129-26m0cnxn.tsv | 2 - .../cpb-aacip-129-26m0cnzc.tsv | 2 - .../cpb-aacip-129-26xwdj6f.tsv | 2 - .../cpb-aacip-129-26xwdj75.tsv | 2 - .../cpb-aacip-129-26xwdj8w.tsv | 2 - .../cpb-aacip-129-278sfd92.tsv | 2 - .../cpb-aacip-129-278sfdn9.tsv | 2 - .../cpb-aacip-129-278sfdp1.tsv | 2 - .../cpb-aacip-129-278sfdqr.tsv | 2 - .../cpb-aacip-129-27mpgb30.tsv | 2 - .../cpb-aacip-129-27mpgb4q.tsv | 2 - .../cpb-aacip-129-27mpgb5f.tsv | 2 - .../cpb-aacip-129-27mpgb65.tsv | 2 - .../cpb-aacip-129-27mpgbmv.tsv | 2 - .../cpb-aacip-129-27mpgbnk.tsv | 2 - .../cpb-aacip-129-27zkh64m.tsv | 2 - .../cpb-aacip-129-27zkh6k1.tsv | 2 - .../cpb-aacip-129-27zkh6mr.tsv | 2 - .../cpb-aacip-129-289gj39c.tsv | 2 - .../cpb-aacip-129-289gj3pb.tsv | 2 - .../cpb-aacip-129-289gj3q2.tsv | 2 - .../cpb-aacip-129-28nck0px.tsv | 2 - .../cpb-aacip-129-28nck0qn.tsv | 2 - .../cpb-aacip-129-28nck11v.tsv | 2 - .../cpb-aacip-129-28nck12k.tsv | 2 - .../cpb-aacip-129-28nck139.tsv | 2 - .../cpb-aacip-129-2908kwcw.tsv | 2 - .../cpb-aacip-129-2908kwdm.tsv | 2 - .../cpb-aacip-129-2908kwfb.tsv | 2 - .../cpb-aacip-129-2908kwg2.tsv | 2 - .../cpb-aacip-129-2908kwhs.tsv | 2 - .../cpb-aacip-129-2908kwjh.tsv | 2 - .../cpb-aacip-129-2908kwk7.tsv | 2 - .../cpb-aacip-129-29b5mscg.tsv | 2 - .../cpb-aacip-129-29b5msd6.tsv | 2 - .../cpb-aacip-129-29b5msfx.tsv | 2 - .../cpb-aacip-129-29b5mswb.tsv | 2 - .../cpb-aacip-129-29b5msx2.tsv | 2 - .../cpb-aacip-129-29b5mszs.tsv | 2 - .../cpb-aacip-129-29p2nnzp.tsv | 2 - .../cpb-aacip-129-29p2npc2.tsv | 2 - .../cpb-aacip-129-29p2npds.tsv | 2 - .../cpb-aacip-129-34sj422h.tsv | 2 - .../cpb-aacip-129-4947dhdh.tsv | 2 - .../cpb-aacip-129-60qrfv0q.tsv | 2 - .../cpb-aacip-129-66j1009t.tsv | 2 - .../cpb-aacip-129-69z08wkv.tsv | 2 - .../cpb-aacip-129-76f1vvrm.tsv | 2 - .../cpb-aacip-129-76rxwqnr.tsv | 2 - .../cpb-aacip-129-78gf26qv.tsv | 2 - .../cpb-aacip-129-83xsjgjh.tsv | 2 - .../cpb-aacip-129-8605qtdf.tsv | 2 - .../cpb-aacip-129-87pnw91c.tsv | 2 - .../cpb-aacip-129-89280vgh.tsv | 2 - .../cpb-aacip-129-91fj72nc.tsv | 2 - .../cpb-aacip-131-0000003w.tsv | 2 - .../cpb-aacip-131-00ns1s0n.tsv | 2 - .../cpb-aacip-131-00ns1s1c.tsv | 2 - .../cpb-aacip-131-010p2ntg.tsv | 2 - .../cpb-aacip-131-01bk3jj8.tsv | 2 - .../cpb-aacip-131-01bk3jk0.tsv | 2 - .../cpb-aacip-131-021c5bgj.tsv | 2 - .../cpb-aacip-131-02c8676b.tsv | 2 - .../cpb-aacip-131-02c86772.tsv | 2 - .../cpb-aacip-131-032280xk.tsv | 2 - .../cpb-aacip-131-032280z9.tsv | 2 - .../cpb-aacip-131-03cz8wvg.tsv | 2 - .../cpb-aacip-131-03cz8ww6.tsv | 2 - .../cpb-aacip-131-03cz8wxx.tsv | 2 - .../cpb-aacip-131-06sxktcx.tsv | 2 - .../cpb-aacip-131-06sxktdn.tsv | 2 - .../cpb-aacip-131-06sxktfc.tsv | 2 - .../cpb-aacip-131-08v9s5g1.tsv | 2 - .../cpb-aacip-131-0966t2hw.tsv | 2 - .../cpb-aacip-131-11kh19k7.tsv | 2 - .../cpb-aacip-131-11kh19mz.tsv | 2 - .../cpb-aacip-131-11xd2691.tsv | 2 - .../cpb-aacip-131-12893358.tsv | 2 - .../cpb-aacip-131-12m6403d.tsv | 2 - .../cpb-aacip-131-12m64044.tsv | 2 - .../cpb-aacip-131-12z34w2m.tsv | 2 - .../cpb-aacip-131-12z34w3b.tsv | 2 - .../cpb-aacip-131-12z34w42.tsv | 2 - .../cpb-aacip-131-13mw6nqt.tsv | 2 - .../cpb-aacip-131-14nk9b68.tsv | 2 - .../cpb-aacip-131-150gb6zn.tsv | 2 - .../cpb-aacip-131-1615dwph.tsv | 2 - .../cpb-aacip-131-16pzgphg.tsv | 2 - .../cpb-aacip-131-16pzgpj6.tsv | 2 - .../cpb-aacip-131-16pzgpkx.tsv | 2 - .../cpb-aacip-131-16pzgpmn.tsv | 2 - .../cpb-aacip-131-18rbp1gp.tsv | 2 - .../cpb-aacip-131-18rbp1hd.tsv | 2 - .../cpb-aacip-131-19f4qtck.tsv | 2 - .../cpb-aacip-131-19f4qtd9.tsv | 2 - .../cpb-aacip-131-19s1rq6j.tsv | 2 - .../cpb-aacip-131-203xsm4n.tsv | 2 - .../cpb-aacip-131-20fttgwg.tsv | 2 - .../cpb-aacip-131-20fttgx6.tsv | 2 - .../cpb-aacip-131-20sqvcqf.tsv | 2 - .../cpb-aacip-131-214mw8h7.tsv | 2 - .../cpb-aacip-131-22h70v81.tsv | 2 - .../cpb-aacip-131-22v41qzd.tsv | 2 - .../cpb-aacip-131-24wh7377.tsv | 2 - .../cpb-aacip-131-25x69rnw.tsv | 2 - .../cpb-aacip-131-2683bnjv.tsv | 2 - .../cpb-aacip-131-2683bnkk.tsv | 2 - .../cpb-aacip-131-26m0cjnm.tsv | 2 - .../cpb-aacip-131-278sfb1q.tsv | 2 - .../cpb-aacip-131-27mpg719.tsv | 2 - .../cpb-aacip-131-28ncjwhd.tsv | 2 - .../cpb-aacip-131-29b5mpdz.tsv | 2 - .../cpb-aacip-131-29b5mpfp.tsv | 2 - .../cpb-aacip-131-30bvqbxv.tsv | 2 - .../cpb-aacip-131-30prr7rt.tsv | 2 - .../cpb-aacip-131-311ns4m2.tsv | 2 - .../cpb-aacip-131-311ns4ns.tsv | 2 - .../cpb-aacip-131-31cjt1mn.tsv | 2 - .../cpb-aacip-131-32d7wq3f.tsv | 2 - .../cpb-aacip-131-32d7wq45.tsv | 2 - .../cpb-aacip-131-33dz0cpd.tsv | 2 - .../cpb-aacip-131-33dz0cq4.tsv | 2 - .../cpb-aacip-131-33dz0crv.tsv | 2 - .../cpb-aacip-131-343r25bw.tsv | 2 - .../cpb-aacip-131-34sj3z42.tsv | 2 - .../cpb-aacip-131-34sj3z5s.tsv | 2 - .../cpb-aacip-131-35t76mk3.tsv | 2 - .../cpb-aacip-131-375tb64j.tsv | 2 - .../cpb-aacip-131-38w9gndg.tsv | 2 - .../cpb-aacip-131-3976hj9f.tsv | 2 - .../cpb-aacip-131-40xpp0pm.tsv | 2 - .../cpb-aacip-131-40xpp0qb.tsv | 2 - .../cpb-aacip-131-41mgqsfm.tsv | 2 - .../cpb-aacip-131-4298sk0x.tsv | 2 - .../cpb-aacip-131-439zw7nq.tsv | 2 - .../cpb-aacip-131-44bnzx7p.tsv | 2 - .../cpb-aacip-131-44pk0t0t.tsv | 2 - .../cpb-aacip-131-45q83gmg.tsv | 2 - .../cpb-aacip-131-45q83gn6.tsv | 2 - .../cpb-aacip-131-46254cmm.tsv | 2 - .../cpb-aacip-131-46d258bd.tsv | 2 - .../cpb-aacip-131-46qz653b.tsv | 2 - .../cpb-aacip-131-472v7246.tsv | 2 - .../cpb-aacip-131-47dr7xzt.tsv | 2 - .../cpb-aacip-131-48ffbmhq.tsv | 2 - .../cpb-aacip-131-48sbchfv.tsv | 2 - .../cpb-aacip-131-48sbchgk.tsv | 2 - .../cpb-aacip-131-48sbchh9.tsv | 2 - .../cpb-aacip-131-48sbchj1.tsv | 2 - .../cpb-aacip-131-4947ddbt.tsv | 2 - .../cpb-aacip-131-4947ddcj.tsv | 2 - .../cpb-aacip-131-4947ddd8.tsv | 2 - .../cpb-aacip-131-4947ddf0.tsv | 2 - .../cpb-aacip-131-49g4f942.tsv | 2 - .../cpb-aacip-131-49g4f95s.tsv | 2 - .../cpb-aacip-131-504xh2wf.tsv | 2 - .../cpb-aacip-131-50gthzrg.tsv | 2 - .../cpb-aacip-131-50tqjvkf.tsv | 2 - .../cpb-aacip-131-51hhmnct.tsv | 2 - .../cpb-aacip-131-5269pf21.tsv | 2 - .../cpb-aacip-131-5370s3kh.tsv | 2 - .../cpb-aacip-131-53jwt0gb.tsv | 2 - .../cpb-aacip-131-53jwt0h2.tsv | 2 - .../cpb-aacip-131-53jwt0js.tsv | 2 - .../cpb-aacip-131-54kkwp29.tsv | 2 - .../cpb-aacip-131-54xgxk15.tsv | 2 - .../cpb-aacip-131-55m90bv6.tsv | 2 - .../cpb-aacip-131-569324f7.tsv | 2 - .../cpb-aacip-131-569324gz.tsv | 2 - .../cpb-aacip-131-56n031d3.tsv | 2 - .../cpb-aacip-131-56n031ft.tsv | 2 - .../cpb-aacip-131-58bg7grf.tsv | 2 - .../cpb-aacip-131-58pc8cg7.tsv | 2 - .../cpb-aacip-131-59q2c22v.tsv | 2 - .../cpb-aacip-131-59q2c23k.tsv | 2 - .../cpb-aacip-131-612ngmjh.tsv | 2 - .../cpb-aacip-131-612ngmk7.tsv | 2 - .../cpb-aacip-131-61djhh89.tsv | 2 - .../cpb-aacip-131-61rfjd9m.tsv | 2 - .../cpb-aacip-131-623bk95v.tsv | 2 - .../cpb-aacip-131-623bk96k.tsv | 2 - .../cpb-aacip-131-6341nzr4.tsv | 2 - .../cpb-aacip-131-6341nzsv.tsv | 2 - .../cpb-aacip-131-64thtf1t.tsv | 2 - .../cpb-aacip-131-65h9w6jq.tsv | 2 - .../cpb-aacip-131-68kd57gw.tsv | 2 - .../cpb-aacip-131-68kd57hm.tsv | 2 - .../cpb-aacip-131-6986713n.tsv | 2 - .../cpb-aacip-131-69z08svd.tsv | 2 - .../cpb-aacip-131-69z08sw4.tsv | 2 - .../cpb-aacip-131-69z08sxv.tsv | 2 - .../cpb-aacip-131-719kdcc4.tsv | 2 - .../cpb-aacip-131-71ngf85c.tsv | 2 - .../cpb-aacip-131-720cg52b.tsv | 2 - .../cpb-aacip-131-720cg532.tsv | 2 - .../cpb-aacip-131-720cg54s.tsv | 2 - .../cpb-aacip-131-72b8h1wm.tsv | 2 - .../cpb-aacip-131-72b8h1xb.tsv | 2 - .../cpb-aacip-131-72b8h1z2.tsv | 2 - .../cpb-aacip-131-7312jthq.tsv | 2 - .../cpb-aacip-131-7312jtjf.tsv | 2 - .../cpb-aacip-131-7312jtk5.tsv | 2 - .../cpb-aacip-131-7312jtmw.tsv | 2 - .../cpb-aacip-131-73bzkqhq.tsv | 2 - .../cpb-aacip-131-75r7szf4.tsv | 2 - .../cpb-aacip-131-75r7szgv.tsv | 2 - .../cpb-aacip-131-773txj7n.tsv | 2 - .../cpb-aacip-131-805x6js5.tsv | 2 - .../cpb-aacip-131-80vq8bgt.tsv | 2 - .../cpb-aacip-131-81jhb4bn.tsv | 2 - .../cpb-aacip-131-82k6dstr.tsv | 2 - .../cpb-aacip-131-82k6dsvg.tsv | 2 - .../cpb-aacip-131-82k6dsw6.tsv | 2 - .../cpb-aacip-131-82x3fpnq.tsv | 2 - .../cpb-aacip-131-82x3fppf.tsv | 2 - .../cpb-aacip-131-8380gkm4.tsv | 2 - .../cpb-aacip-131-83kwhgbb.tsv | 2 - .../cpb-aacip-131-848pk81j.tsv | 2 - .../cpb-aacip-131-848pk828.tsv | 2 - .../cpb-aacip-131-85n8ptfs.tsv | 2 - .../cpb-aacip-131-85n8ptgh.tsv | 2 - .../cpb-aacip-131-8605qqd6.tsv | 2 - .../cpb-aacip-131-86b2rm75.tsv | 2 - .../cpb-aacip-131-86b2rm8w.tsv | 2 - .../cpb-aacip-131-86nzsh6f.tsv | 2 - .../cpb-aacip-131-86nzsh75.tsv | 2 - .../cpb-aacip-131-87brv8th.tsv | 2 - .../cpb-aacip-131-87brv8v7.tsv | 2 - .../cpb-aacip-131-87brv8wz.tsv | 2 - .../cpb-aacip-131-87pnw5p6.tsv | 2 - .../cpb-aacip-131-88qbzv7f.tsv | 2 - .../cpb-aacip-131-89280r2k.tsv | 2 - .../cpb-aacip-131-89280r39.tsv | 2 - .../cpb-aacip-131-89r22hvq.tsv | 2 - .../cpb-aacip-131-902z3dtj.tsv | 2 - .../cpb-aacip-131-91fj709k.tsv | 2 - .../cpb-aacip-131-91fj70b9.tsv | 2 - .../cpb-aacip-131-91fj70c1.tsv | 2 - .../cpb-aacip-131-91sf7w4w.tsv | 2 - .../cpb-aacip-131-924b8rtt.tsv | 2 - .../cpb-aacip-131-92g79nwv.tsv | 2 - .../cpb-aacip-131-9351cfms.tsv | 2 - .../cpb-aacip-131-9351cfnh.tsv | 2 - .../cpb-aacip-131-945qg46t.tsv | 2 - .../cpb-aacip-131-95j9kpkb.tsv | 2 - .../cpb-aacip-131-9673ng7t.tsv | 2 - .../cpb-aacip-131-988gttbp.tsv | 2 - .../cpb-aacip-131-988gttcd.tsv | 2 - .../cpb-aacip-131-988gttd4.tsv | 2 - .../cpb-aacip-131-98z8wm7p.tsv | 2 - .../cpb-aacip-131-9995xh0r.tsv | 2 - .../cpb-aacip-131-9995xh1g.tsv | 2 - .../cpb-aacip-153-000000vj.tsv | 2 - .../cpb-aacip-153-000002z3.tsv | 2 - .../cpb-aacip-153-009w0wcr.tsv | 2 - .../cpb-aacip-153-032281kr.tsv | 2 - .../cpb-aacip-153-03cz8xgx.tsv | 2 - .../cpb-aacip-153-042rbpt6.tsv | 2 - .../cpb-aacip-153-04dnckw7.tsv | 2 - .../cpb-aacip-153-05s7h55x.tsv | 2 - .../cpb-aacip-153-07gqnmcc.tsv | 2 - .../cpb-aacip-153-07gqnmd3.tsv | 2 - .../cpb-aacip-153-085hqddt.tsv | 2 - .../cpb-aacip-153-09j3tzvs.tsv | 2 - .../cpb-aacip-153-106wwrgz.tsv | 2 - .../cpb-aacip-153-117m0f63.tsv | 2 - .../cpb-aacip-153-128933r9.tsv | 2 - .../cpb-aacip-153-128933s1.tsv | 2 - .../cpb-aacip-153-12z34wf9.tsv | 2 - .../cpb-aacip-153-13zs7k0m.tsv | 2 - .../cpb-aacip-153-14nk9bs9.tsv | 2 - .../cpb-aacip-153-1615f088.tsv | 2 - .../cpb-aacip-153-16c2fszm.tsv | 2 - .../cpb-aacip-153-16c2ft2g.tsv | 2 - .../cpb-aacip-153-16pzgptq.tsv | 2 - .../cpb-aacip-153-17qnkc3t.tsv | 2 - .../cpb-aacip-153-19f4qtn3.tsv | 2 - .../cpb-aacip-153-19f4qtr8.tsv | 2 - .../cpb-aacip-153-20fttk52.tsv | 2 - .../cpb-aacip-153-20sqvf3h.tsv | 2 - .../cpb-aacip-153-21ghx5sb.tsv | 2 - .../cpb-aacip-153-21ghx5wh.tsv | 2 - .../cpb-aacip-153-21ghx898.tsv | 2 - .../cpb-aacip-153-22h70vg3.tsv | 2 - .../cpb-aacip-153-22h70vht.tsv | 2 - .../cpb-aacip-153-23612n24.tsv | 2 - .../cpb-aacip-153-23612q02.tsv | 2 - .../cpb-aacip-153-23hx3hwt.tsv | 2 - .../cpb-aacip-153-246q59t3.tsv | 2 - .../cpb-aacip-153-257d80kb.tsv | 2 - .../cpb-aacip-153-257d80ph.tsv | 2 - .../cpb-aacip-153-25x69s18.tsv | 2 - .../cpb-aacip-153-26m0cjqs.tsv | 2 - .../cpb-aacip-153-26xwdfzv.tsv | 2 - .../cpb-aacip-153-278sfbrn.tsv | 2 - .../cpb-aacip-153-28ncjx34.tsv | 2 - .../cpb-aacip-153-28ncjx8r.tsv | 2 - .../cpb-aacip-153-29b5mpnr.tsv | 2 - .../cpb-aacip-153-300zpjd6.tsv | 2 - .../cpb-aacip-153-30prr83g.tsv | 2 - .../cpb-aacip-153-311ns4vv.tsv | 2 - .../cpb-aacip-153-311ns4wk.tsv | 2 - .../cpb-aacip-153-311ns5s3.tsv | 2 - .../cpb-aacip-153-31cjt1tq.tsv | 2 - .../cpb-aacip-153-31cjt1zm.tsv | 2 - .../cpb-aacip-153-31qftxvc.tsv | 2 - .../cpb-aacip-153-322bvtrb.tsv | 2 - .../cpb-aacip-153-322bvvg7.tsv | 2 - .../cpb-aacip-153-32d7wqdp.tsv | 2 - .../cpb-aacip-153-33dz0d3h.tsv | 2 - .../cpb-aacip-153-33dz0d5z.tsv | 2 - .../cpb-aacip-153-33dz0d6p.tsv | 2 - .../cpb-aacip-153-33rv190x.tsv | 2 - .../cpb-aacip-153-34fn32g3.tsv | 2 - .../cpb-aacip-153-35gb5rhg.tsv | 2 - .../cpb-aacip-153-36547j3h.tsv | 2 - .../cpb-aacip-153-36547j47.tsv | 2 - .../cpb-aacip-153-375tb6kp.tsv | 2 - .../cpb-aacip-153-386hdw5n.tsv | 2 - .../cpb-aacip-153-386hdw6c.tsv | 2 - .../cpb-aacip-153-386hdz86.tsv | 2 - .../cpb-aacip-153-38jdfrt9.tsv | 2 - .../cpb-aacip-153-38w9gntw.tsv | 2 - .../cpb-aacip-153-38w9gnx2.tsv | 2 - .../cpb-aacip-153-40ksn45k.tsv | 2 - .../cpb-aacip-153-40ksn6d1.tsv | 2 - .../cpb-aacip-153-40xpp120.tsv | 2 - .../cpb-aacip-153-40xpp17m.tsv | 2 - .../cpb-aacip-153-4298skkz.tsv | 2 - .../cpb-aacip-153-42n5tg79.tsv | 2 - .../cpb-aacip-153-42n5tg81.tsv | 2 - .../cpb-aacip-153-42n5tg9r.tsv | 2 - .../cpb-aacip-153-42n5tgbg.tsv | 2 - .../cpb-aacip-153-440rz203.tsv | 2 - .../cpb-aacip-153-44bnzxr8.tsv | 2 - .../cpb-aacip-153-44bnzxs0.tsv | 2 - .../cpb-aacip-153-46254cw4.tsv | 2 - .../cpb-aacip-153-472v72b8.tsv | 2 - .../cpb-aacip-153-48ffbpfc.tsv | 2 - .../cpb-aacip-153-48sbchpn.tsv | 2 - .../cpb-aacip-189-01pg4fmz.tsv | 2 - .../cpb-aacip-189-042rbpjb.tsv | 2 - .../cpb-aacip-189-07tmph2c.tsv | 2 - .../cpb-aacip-189-08v9s5rg.tsv | 2 - .../cpb-aacip-189-09w0vv3c.tsv | 2 - .../cpb-aacip-189-12m64032.tsv | 2 - .../cpb-aacip-189-13zs7jf8.tsv | 2 - .../cpb-aacip-189-20sqvcwq.tsv | 2 - .../cpb-aacip-189-27zkh41j.tsv | 2 - .../cpb-aacip-189-2908kskn.tsv | 2 - .../cpb-aacip-189-29b5mpdm.tsv | 2 - .../cpb-aacip-189-31qftxfm.tsv | 2 - .../cpb-aacip-189-36tx995s.tsv | 2 - .../cpb-aacip-189-38jdfrnm.tsv | 2 - .../cpb-aacip-189-38jdfrpb.tsv | 2 - .../cpb-aacip-189-39x0kb26.tsv | 2 - .../cpb-aacip-189-4298sk0k.tsv | 2 - .../cpb-aacip-189-4298sk19.tsv | 2 - .../cpb-aacip-189-53jwt0jf.tsv | 2 - .../cpb-aacip-189-55z617r8.tsv | 2 - .../cpb-aacip-189-580k6krh.tsv | 2 - .../cpb-aacip-189-59c5b54c.tsv | 2 - .../cpb-aacip-189-60qrfqqn.tsv | 2 - .../cpb-aacip-189-63fxpvk5.tsv | 2 - .../cpb-aacip-189-63fxpvmw.tsv | 2 - .../cpb-aacip-189-65h9w6k3.tsv | 2 - .../cpb-aacip-189-67jq2jzc.tsv | 2 - .../cpb-aacip-189-68kd57j0.tsv | 2 - .../cpb-aacip-189-72p5hxzn.tsv | 2 - .../cpb-aacip-189-741rnh6k.tsv | 2 - .../cpb-aacip-189-784j16mh.tsv | 2 - .../cpb-aacip-189-784j16n7.tsv | 2 - .../cpb-aacip-189-80ht7fms.tsv | 2 - .../cpb-aacip-189-80vq8bgg.tsv | 2 - .../cpb-aacip-189-84zgn223.tsv | 2 - .../cpb-aacip-189-86b2rmdf.tsv | 2 - .../cpb-aacip-189-881jx2qq.tsv | 2 - .../cpb-aacip-189-91fj707s.tsv | 2 - .../cpb-aacip-189-92t4bjtn.tsv | 2 - .../cpb-aacip-189-93ttf74w.tsv | 2 - .../cpb-aacip-200-074tmrfw.tsv | 2 - .../cpb-aacip-200-150gb84b.tsv | 2 - .../cpb-aacip-200-1937pzw7.tsv | 2 - .../cpb-aacip-200-225b008g.tsv | 2 - .../cpb-aacip-200-27zkh4b3.tsv | 2 - .../cpb-aacip-200-31qftz5j.tsv | 2 - .../cpb-aacip-200-31qftz68.tsv | 2 - .../cpb-aacip-200-34fn338d.tsv | 2 - .../cpb-aacip-200-36547jkm.tsv | 2 - .../cpb-aacip-200-36tx9bnn.tsv | 2 - .../cpb-aacip-200-375tb736.tsv | 2 - .../cpb-aacip-200-386hdx1d.tsv | 2 - .../cpb-aacip-200-43nvx5rv.tsv | 2 - .../cpb-aacip-200-5269pg71.tsv | 2 - .../cpb-aacip-200-558czgn1.tsv | 2 - .../cpb-aacip-200-58bg7hk6.tsv | 2 - .../cpb-aacip-200-58bg7hmx.tsv | 2 - .../cpb-aacip-200-64thtfsf.tsv | 2 - .../cpb-aacip-200-67jq2kz3.tsv | 2 - .../cpb-aacip-200-708w9qpq.tsv | 2 - .../cpb-aacip-200-7312jvbg.tsv | 2 - .../cpb-aacip-200-74cnpf7m.tsv | 2 - .../cpb-aacip-200-805x6m6x.tsv | 2 - .../cpb-aacip-200-84zgn2vs.tsv | 2 - .../cpb-aacip-200-86nzsjgm.tsv | 2 - .../cpb-aacip-200-881jx3pq.tsv | 2 - .../cpb-aacip-200-902z3ftx.tsv | 2 - .../cpb-aacip-200-90dv4br2.tsv | 2 - .../cpb-aacip-200-92g79pn5.tsv | 2 - .../cpb-aacip-200-945qg5jf.tsv | 2 - .../cpb-aacip-200-96wwq9p6.tsv | 2 - .../cpb-aacip-235-042rcjzf.tsv | 2 - .../cpb-aacip-235-15bcd0gv.tsv | 2 - .../cpb-aacip-235-18dfp1rn.tsv | 2 - .../cpb-aacip-235-19f4rq7f.tsv | 2 - .../cpb-aacip-235-20ftvbhk.tsv | 2 - .../cpb-aacip-235-36548ck9.tsv | 2 - .../cpb-aacip-235-37vmdv3d.tsv | 2 - .../cpb-aacip-235-3976jbt0.tsv | 2 - .../cpb-aacip-235-42n5v9dk.tsv | 2 - .../cpb-aacip-235-47rn9r0k.tsv | 2 - .../cpb-aacip-235-49t1h18x.tsv | 2 - .../cpb-aacip-235-5370swqf.tsv | 2 - .../cpb-aacip-235-580k7dqh.tsv | 2 - .../cpb-aacip-235-67wm48rb.tsv | 2 - .../cpb-aacip-235-69z09p02.tsv | 2 - .../cpb-aacip-235-86b2sgc4.tsv | 2 - .../cpb-aacip-235-924b9nm7.tsv | 2 - .../cpb-aacip-235-92g7bgts.tsv | 2 - .../cpb-aacip-235-92g7bgvh.tsv | 2 - .../cpb-aacip-235-988gvq43.tsv | 2 - .../cpb-aacip-29-01pg4g2x.tsv | 2 - .../cpb-aacip-29-06sxkv86.tsv | 2 - .../cpb-aacip-29-08v9s6dt.tsv | 2 - .../cpb-aacip-29-106wwrfp.tsv | 2 - .../cpb-aacip-29-117m0f2f.tsv | 2 - .../cpb-aacip-29-11xd270w.tsv | 2 - .../cpb-aacip-29-15bcc4sg.tsv | 2 - .../cpb-aacip-29-22v41r8t.tsv | 2 - .../cpb-aacip-29-24wh73nq.tsv | 2 - .../cpb-aacip-29-29p2nkpp.tsv | 2 - .../cpb-aacip-29-35t76n4f.tsv | 2 - .../cpb-aacip-29-3976hk2f.tsv | 2 - .../cpb-aacip-29-41mgqtx3.tsv | 2 - .../cpb-aacip-29-440rz2bm.tsv | 2 - .../cpb-aacip-29-46254dmz.tsv | 2 - .../cpb-aacip-29-48ffbnfm.tsv | 2 - .../cpb-aacip-29-4947dfbw.tsv | 2 - .../cpb-aacip-29-49g4f9wp.tsv | 2 - .../cpb-aacip-29-50tqjw98.tsv | 2 - .../cpb-aacip-29-515mks96.tsv | 2 - .../cpb-aacip-29-5269pfn6.tsv | 2 - .../cpb-aacip-29-57np5qmn.tsv | 2 - .../cpb-aacip-29-61rfjdxq.tsv | 2 - .../cpb-aacip-29-66j0zx33.tsv | 2 - .../cpb-aacip-29-66vx0sr0.tsv | 2 - .../cpb-aacip-29-687h4cjj.tsv | 2 - .../cpb-aacip-29-68kd58pq.tsv | 2 - .../cpb-aacip-29-7312jv8m.tsv | 2 - .../cpb-aacip-29-7634tw3m.tsv | 2 - .../cpb-aacip-29-773txjgr.tsv | 2 - .../cpb-aacip-29-784j17c1.tsv | 2 - .../cpb-aacip-29-78tb30x7.tsv | 2 - .../cpb-aacip-29-84mkm5rk.tsv | 2 - .../cpb-aacip-29-86nzshb0.tsv | 2 - .../cpb-aacip-29-89280s5z.tsv | 2 - .../cpb-aacip-29-902z3fdn.tsv | 2 - .../cpb-aacip-29-95w6mm5b.tsv | 2 - .../cpb-aacip-29-95w6mmcg.tsv | 2 - .../cpb-aacip-29-97kps24j.tsv | 2 - .../cpb-aacip-29-9995xhq3.tsv | 2 - .../cpb-aacip-293-03qv9sz0.tsv | 2 - .../cpb-aacip-293-0966t2q0.tsv | 2 - .../cpb-aacip-293-10jsxngk.tsv | 2 - .../cpb-aacip-293-13905s74.tsv | 2 - .../cpb-aacip-293-30prr83h.tsv | 2 - .../cpb-aacip-293-31cjt22h.tsv | 2 - .../cpb-aacip-293-3331zh63.tsv | 2 - .../cpb-aacip-293-34sj3xzh.tsv | 2 - .../cpb-aacip-293-38w9gntx.tsv | 2 - .../cpb-aacip-293-472v72kc.tsv | 2 - .../cpb-aacip-293-60cvdv8f.tsv | 2 - .../cpb-aacip-293-68kd582n.tsv | 2 - .../cpb-aacip-293-741rnhtq.tsv | 2 - .../cpb-aacip-293-848pk8hf.tsv | 2 - .../cpb-aacip-322-03cz8wl6.tsv | 2 - .../cpb-aacip-322-04rjdg2h.tsv | 2 - .../cpb-aacip-322-074tmqt8.tsv | 2 - .../cpb-aacip-322-11xd26h5.tsv | 2 - .../cpb-aacip-322-13lw6ngj.tsv | 2 - .../cpb-aacip-322-24jm66h7.tsv | 2 - .../cpb-aacip-322-28ncjx9j.tsv | 2 - .../cpb-aacip-322-29b5mp4z.tsv | 2 - .../cpb-aacip-322-29b5mp5p.tsv | 2 - .../cpb-aacip-322-29b5mpzb.tsv | 2 - .../cpb-aacip-322-300zpfvm.tsv | 2 - .../cpb-aacip-322-31qftx5z.tsv | 2 - .../cpb-aacip-322-31qftx7d.tsv | 2 - .../cpb-aacip-322-3331zgm4.tsv | 2 - .../cpb-aacip-322-3331zh3z.tsv | 2 - .../cpb-aacip-322-343r25h9.tsv | 2 - .../cpb-aacip-322-36tx99km.tsv | 2 - .../cpb-aacip-322-3976hjwj.tsv | 2 - .../cpb-aacip-322-3976hjz0.tsv | 2 - .../cpb-aacip-322-43nvx4bk.tsv | 2 - .../cpb-aacip-322-48ffbldb.tsv | 2 - .../cpb-aacip-322-52w3r6lw.tsv | 2 - .../cpb-aacip-322-55l90bhr.tsv | 2 - .../cpb-aacip-322-55m90c8c.tsv | 2 - .../cpb-aacip-322-569324rj.tsv | 2 - .../cpb-aacip-322-61rfjd1l.tsv | 2 - .../cpb-aacip-322-61rfjd9d.tsv | 2 - .../cpb-aacip-322-62s4n2mj.tsv | 2 - .../cpb-aacip-322-62s4n3bf.tsv | 2 - .../cpb-aacip-322-65h9w7mn.tsv | 2 - .../cpb-aacip-322-719kdcsm.tsv | 2 - .../cpb-aacip-322-720cg4wt.tsv | 2 - .../cpb-aacip-322-72b8h1rh.tsv | 2 - .../cpb-aacip-322-73bzkqbw.tsv | 2 - .../cpb-aacip-322-7634tvj7.tsv | 2 - .../cpb-aacip-322-76f1vrn0.tsv | 2 - .../cpb-aacip-322-784j1746.tsv | 2 - .../cpb-aacip-322-78gf23pp.tsv | 2 - .../cpb-aacip-322-83kwhg7z.tsv | 2 - .../cpb-aacip-322-83kwhg8p.tsv | 2 - .../cpb-aacip-322-83xsjcn7.tsv | 2 - .../cpb-aacip-322-89d51ncg.tsv | 2 - .../cpb-aacip-322-924b8scw.tsv | 2 - .../cpb-aacip-322-92t4bjgj.tsv | 2 - .../cpb-aacip-322-93ttf72k.tsv | 2 - .../cpb-aacip-322-95w6mkvh.tsv | 2 - .../cpb-aacip-322-9673ng3q.tsv | 2 - .../cpb-aacip-322-98mcvqxc.tsv | 2 - .../cpb-aacip-394-0322868j.tsv | 2 - .../cpb-aacip-394-150gbd75.tsv | 2 - .../cpb-aacip-394-16pzgvnd.tsv | 2 - .../cpb-aacip-394-20sqvk0z.tsv | 2 - .../cpb-aacip-394-25k99270.tsv | 2 - .../cpb-aacip-394-28nck2pq.tsv | 2 - .../cpb-aacip-394-30prrfj6.tsv | 2 - .../cpb-aacip-394-34sj440v.tsv | 2 - .../cpb-aacip-394-35t76v43.tsv | 2 - .../cpb-aacip-394-37hqc8bh.tsv | 2 - .../cpb-aacip-394-44pk10gn.tsv | 2 - .../cpb-aacip-394-57np5x9q.tsv | 2 - .../cpb-aacip-394-59189f7b.tsv | 2 - .../cpb-aacip-394-601zd3mb.tsv | 2 - .../cpb-aacip-394-612ngsdn.tsv | 2 - .../cpb-aacip-394-63fxq1nn.tsv | 2 - .../cpb-aacip-394-8605qwd7.tsv | 2 - .../cpb-aacip-394-881jx8bt.tsv | 2 - .../cpb-aacip-394-94hmh6pk.tsv | 2 - .../cpb-aacip-394-9995xntg.tsv | 2 - .../cpb-aacip-41-009w13fb.tsv | 2 - .../cpb-aacip-41-074tmwc8.tsv | 2 - .../cpb-aacip-41-10wpzpt5.tsv | 2 - .../cpb-aacip-41-13zs7qh0.tsv | 2 - .../cpb-aacip-41-14nk9bkf.tsv | 2 - .../cpb-aacip-41-16pzgq2f.tsv | 2 - .../cpb-aacip-41-171vhkmr.tsv | 2 - .../cpb-aacip-41-17qnkc9c.tsv | 2 - .../cpb-aacip-41-214mwjjg.tsv | 2 - .../cpb-aacip-41-21ghx61z.tsv | 2 - .../cpb-aacip-41-21tdz99t.tsv | 2 - .../cpb-aacip-41-33dz0cwr.tsv | 2 - .../cpb-aacip-41-34fn32g7.tsv | 2 - .../cpb-aacip-41-35gb5r1d.tsv | 2 - .../cpb-aacip-41-39k3jfhm.tsv | 2 - .../cpb-aacip-41-48sbchtd.tsv | 2 - .../cpb-aacip-41-569324rv.tsv | 2 - .../cpb-aacip-41-579s4tcv.tsv | 2 - .../cpb-aacip-41-644qrngt.tsv | 2 - .../cpb-aacip-41-644qrnhh.tsv | 2 - .../cpb-aacip-41-655dvb4p.tsv | 2 - .../cpb-aacip-41-708w9q63.tsv | 2 - .../cpb-aacip-41-7634tvxz.tsv | 2 - .../cpb-aacip-41-78tb30hd.tsv | 2 - .../cpb-aacip-41-816m97tj.tsv | 2 - .../cpb-aacip-41-84mkm5br.tsv | 2 - .../cpb-aacip-41-881jx339.tsv | 2 - .../cpb-aacip-81-032281c4.tsv | 2 - .../cpb-aacip-81-11xd26xt.tsv | 2 - .../cpb-aacip-81-19f4qtzt.tsv | 2 - .../cpb-aacip-81-23hx3j34.tsv | 2 - .../cpb-aacip-81-2683bnv7.tsv | 2 - .../cpb-aacip-81-30bvqccj.tsv | 2 - .../cpb-aacip-81-34fn32xq.tsv | 2 - .../cpb-aacip-81-37vmd08g.tsv | 2 - .../cpb-aacip-81-48sbchx0.tsv | 2 - .../cpb-aacip-81-49g4f9z1.tsv | 2 - .../cpb-aacip-81-49t1g6kv.tsv | 2 - .../cpb-aacip-81-558czgg5.tsv | 2 - .../cpb-aacip-81-65v6x4b5.tsv | 2 - .../cpb-aacip-81-708w9q47.tsv | 2 - .../cpb-aacip-81-74cnpdn4.tsv | 2 - .../cpb-aacip-81-74qjq9nj.tsv | 2 - .../cpb-aacip-81-881jx33t.tsv | 2 - .../cpb-aacip-81-902z3f9j.tsv | 2 - .../cpb-aacip-81-90dv4bd1.tsv | 2 - .../cpb-aacip-81-988gttr0.tsv | 2 - .../golds/cpb-aacip-129-000003cx.tsv | 2 + .../golds/cpb-aacip-129-000003dn.tsv | 2 + .../golds/cpb-aacip-129-009w0zrj.tsv | 2 + .../golds/cpb-aacip-129-009w108r.tsv | 2 + .../golds/cpb-aacip-129-009w109g.tsv | 2 + .../golds/cpb-aacip-129-00ns1w7z.tsv | 2 + .../golds/cpb-aacip-129-00ns1w8p.tsv | 2 + .../golds/cpb-aacip-129-00ns1w9d.tsv | 2 + .../golds/cpb-aacip-129-010p2rqj.tsv | 2 + .../golds/cpb-aacip-129-010p2s01.tsv | 2 + .../golds/cpb-aacip-129-010p2s1r.tsv | 2 + .../golds/cpb-aacip-129-01bk3p94.tsv | 2 + .../golds/cpb-aacip-129-01bk3pck.tsv | 2 + .../golds/cpb-aacip-129-01bk3pd9.tsv | 2 + .../golds/cpb-aacip-129-01bk3pf1.tsv | 2 + .../golds/cpb-aacip-129-01pg4jn8.tsv | 2 + .../golds/cpb-aacip-129-01pg4jp0.tsv | 2 + .../golds/cpb-aacip-129-021c5drw.tsv | 2 + .../golds/cpb-aacip-129-02c86b5v.tsv | 2 + .../golds/cpb-aacip-129-02c86b6k.tsv | 2 + .../golds/cpb-aacip-129-02c86b79.tsv | 2 + .../golds/cpb-aacip-129-02c86bpq.tsv | 2 + .../golds/cpb-aacip-129-02c86bqf.tsv | 2 + .../golds/cpb-aacip-129-02c86br5.tsv | 2 + .../golds/cpb-aacip-129-02c86bsw.tsv | 2 + .../golds/cpb-aacip-129-02q57728.tsv | 2 + .../golds/cpb-aacip-129-02q577f7.tsv | 2 + .../golds/cpb-aacip-129-02q577gz.tsv | 2 + .../golds/cpb-aacip-129-0322848r.tsv | 2 + .../golds/cpb-aacip-129-0322849g.tsv | 2 + .../golds/cpb-aacip-129-032284b6.tsv | 2 + .../golds/cpb-aacip-129-032284cx.tsv | 2 + .../golds/cpb-aacip-129-032284dn.tsv | 2 + .../golds/cpb-aacip-129-032284fc.tsv | 2 + .../golds/cpb-aacip-129-03cz91m0.tsv | 2 + .../golds/cpb-aacip-129-03cz91nq.tsv | 2 + .../golds/cpb-aacip-129-03cz91pf.tsv | 2 + .../golds/cpb-aacip-129-03qv9w9q.tsv | 2 + .../golds/cpb-aacip-129-03qv9wbf.tsv | 2 + .../golds/cpb-aacip-129-03qv9wc5.tsv | 2 + .../golds/cpb-aacip-129-042rbs7d.tsv | 2 + .../golds/cpb-aacip-129-042rbs84.tsv | 2 + .../golds/cpb-aacip-129-042rbsvf.tsv | 2 + .../golds/cpb-aacip-129-042rbsw5.tsv | 2 + .../golds/cpb-aacip-129-042rbsxw.tsv | 2 + .../golds/cpb-aacip-129-04dncnzh.tsv | 2 + .../golds/cpb-aacip-129-04dncpfb.tsv | 2 + .../golds/cpb-aacip-129-04rjdk17.tsv | 2 + .../golds/cpb-aacip-129-04rjdk2z.tsv | 2 + .../golds/cpb-aacip-129-04rjdk3p.tsv | 2 + .../golds/cpb-aacip-129-04rjdk4d.tsv | 2 + .../golds/cpb-aacip-129-04rjdk54.tsv | 2 + .../golds/cpb-aacip-129-04rjdk6v.tsv | 2 + .../golds/cpb-aacip-129-053ffgdb.tsv | 2 + .../golds/cpb-aacip-129-053ffgrk.tsv | 2 + .../golds/cpb-aacip-129-053ffgs9.tsv | 2 + .../golds/cpb-aacip-129-053ffgt1.tsv | 2 + .../golds/cpb-aacip-129-05fbgbzt.tsv | 2 + .../golds/cpb-aacip-129-05fbgcbg.tsv | 2 + .../golds/cpb-aacip-129-05fbgcc6.tsv | 2 + .../golds/cpb-aacip-129-05fbgcdx.tsv | 2 + .../golds/cpb-aacip-129-05s7h80t.tsv | 2 + .../golds/cpb-aacip-129-05s7h81j.tsv | 2 + .../golds/cpb-aacip-129-05s7h828.tsv | 2 + .../golds/cpb-aacip-129-0644j42q.tsv | 2 + .../golds/cpb-aacip-129-0644j4kk.tsv | 2 + .../golds/cpb-aacip-129-06g1k1vz.tsv | 2 + .../golds/cpb-aacip-129-06g1k28b.tsv | 2 + .../golds/cpb-aacip-129-06g1k292.tsv | 2 + .../golds/cpb-aacip-129-06g1k2bs.tsv | 2 + .../golds/cpb-aacip-129-06g1k2ch.tsv | 2 + .../golds/cpb-aacip-129-06sxkwx2.tsv | 2 + .../golds/cpb-aacip-129-06sxkwzs.tsv | 2 + .../golds/cpb-aacip-129-06sxkxdw.tsv | 2 + .../golds/cpb-aacip-129-06sxkxfm.tsv | 2 + .../golds/cpb-aacip-129-06sxkxgb.tsv | 2 + .../golds/cpb-aacip-129-06sxkxh2.tsv | 2 + .../golds/cpb-aacip-129-06sxkxjs.tsv | 2 + .../golds/cpb-aacip-129-074tmv5n.tsv | 2 + .../golds/cpb-aacip-129-074tmv6c.tsv | 2 + .../golds/cpb-aacip-129-074tmv73.tsv | 2 + .../golds/cpb-aacip-129-074tmv8t.tsv | 2 + .../golds/cpb-aacip-129-074tmv9j.tsv | 2 + .../golds/cpb-aacip-129-074tmvb8.tsv | 2 + .../golds/cpb-aacip-129-074tmvc0.tsv | 2 + .../golds/cpb-aacip-129-07gqnr7p.tsv | 2 + .../golds/cpb-aacip-129-07gqnr8d.tsv | 2 + .../golds/cpb-aacip-129-07tmpmmj.tsv | 2 + .../golds/cpb-aacip-129-07tmpmn8.tsv | 2 + .../golds/cpb-aacip-129-07tmpmp0.tsv | 2 + .../golds/cpb-aacip-129-07tmpmqq.tsv | 2 + .../golds/cpb-aacip-129-085hqhbw.tsv | 2 + .../golds/cpb-aacip-129-085hqhcm.tsv | 2 + .../golds/cpb-aacip-129-085hqhdb.tsv | 2 + .../golds/cpb-aacip-129-085hqhf2.tsv | 2 + .../golds/cpb-aacip-129-08hdrc8b.tsv | 2 + .../golds/cpb-aacip-129-08hdrcn9.tsv | 2 + .../golds/cpb-aacip-129-08hdrcp1.tsv | 2 + .../golds/cpb-aacip-129-08hdrcqr.tsv | 2 + .../golds/cpb-aacip-129-08hdrcrg.tsv | 2 + .../golds/cpb-aacip-129-08hdrctx.tsv | 2 + .../golds/cpb-aacip-129-08hdrcvn.tsv | 2 + .../golds/cpb-aacip-129-08v9s8dt.tsv | 2 + .../golds/cpb-aacip-129-08v9s91j.tsv | 2 + .../golds/cpb-aacip-129-08v9s928.tsv | 2 + .../golds/cpb-aacip-129-08v9s930.tsv | 2 + .../golds/cpb-aacip-129-08v9s94q.tsv | 2 + .../golds/cpb-aacip-129-08v9s95f.tsv | 2 + .../golds/cpb-aacip-129-0966t5qg.tsv | 2 + .../golds/cpb-aacip-129-0966t64v.tsv | 2 + .../golds/cpb-aacip-129-0966t65k.tsv | 2 + .../golds/cpb-aacip-129-0966t669.tsv | 2 + .../golds/cpb-aacip-129-0966t671.tsv | 2 + .../golds/cpb-aacip-129-0966t68r.tsv | 2 + .../golds/cpb-aacip-129-09j3v318.tsv | 2 + .../golds/cpb-aacip-129-09j3v320.tsv | 2 + .../golds/cpb-aacip-129-09j3v33q.tsv | 2 + .../golds/cpb-aacip-129-09j3v34f.tsv | 2 + .../golds/cpb-aacip-129-09w0vzcr.tsv | 2 + .../golds/cpb-aacip-129-09w0vzdg.tsv | 2 + .../golds/cpb-aacip-129-106wwvmc.tsv | 2 + .../golds/cpb-aacip-129-106wwvn3.tsv | 2 + .../golds/cpb-aacip-129-106wwvpt.tsv | 2 + .../golds/cpb-aacip-129-10jsxqr5.tsv | 2 + .../golds/cpb-aacip-129-10wpzmxc.tsv | 2 + .../golds/cpb-aacip-129-10wpzmz3.tsv | 2 + .../golds/cpb-aacip-129-10wpznbr.tsv | 2 + .../golds/cpb-aacip-129-10wpzncg.tsv | 2 + .../golds/cpb-aacip-129-10wpznd6.tsv | 2 + .../golds/cpb-aacip-129-117m0hmm.tsv | 2 + .../golds/cpb-aacip-129-117m0hnb.tsv | 2 + .../golds/cpb-aacip-129-117m0hp2.tsv | 2 + .../golds/cpb-aacip-129-11kh1dst.tsv | 2 + .../golds/cpb-aacip-129-11kh1dtj.tsv | 2 + .../golds/cpb-aacip-129-11xd29f5.tsv | 2 + .../golds/cpb-aacip-129-11xd29x9.tsv | 2 + .../golds/cpb-aacip-129-11xd29z1.tsv | 2 + .../golds/cpb-aacip-129-11xd2b0f.tsv | 2 + .../golds/cpb-aacip-129-11xd2b15.tsv | 2 + .../golds/cpb-aacip-129-11xd2b2w.tsv | 2 + .../golds/cpb-aacip-129-11xd2b3m.tsv | 2 + .../golds/cpb-aacip-129-128936f9.tsv | 2 + .../golds/cpb-aacip-129-128936g1.tsv | 2 + .../golds/cpb-aacip-129-128936hr.tsv | 2 + .../golds/cpb-aacip-129-128936jg.tsv | 2 + .../golds/cpb-aacip-129-128936k6.tsv | 2 + .../golds/cpb-aacip-129-128936mx.tsv | 2 + .../golds/cpb-aacip-129-128936nn.tsv | 2 + .../golds/cpb-aacip-129-12m6433n.tsv | 2 + .../golds/cpb-aacip-129-12m6434c.tsv | 2 + .../golds/cpb-aacip-129-12m64353.tsv | 2 + .../golds/cpb-aacip-129-12z35074.tsv | 2 + .../golds/cpb-aacip-129-12z3508v.tsv | 2 + .../golds/cpb-aacip-129-12z3509k.tsv | 2 + .../golds/cpb-aacip-129-12z350b9.tsv | 2 + .../golds/cpb-aacip-129-13905vnm.tsv | 2 + .../golds/cpb-aacip-129-13905vpb.tsv | 2 + .../golds/cpb-aacip-129-13905w20.tsv | 2 + .../golds/cpb-aacip-129-13905w3q.tsv | 2 + .../golds/cpb-aacip-129-13905w4f.tsv | 2 + .../golds/cpb-aacip-129-13905w55.tsv | 2 + .../golds/cpb-aacip-129-13mw6rz4.tsv | 2 + .../golds/cpb-aacip-129-13mw6s0j.tsv | 2 + .../golds/cpb-aacip-129-13mw6s18.tsv | 2 + .../golds/cpb-aacip-129-13mw6s20.tsv | 2 + .../golds/cpb-aacip-129-13mw6s3q.tsv | 2 + .../golds/cpb-aacip-129-13zs7nrc.tsv | 2 + .../golds/cpb-aacip-129-149p8j6x.tsv | 2 + .../golds/cpb-aacip-129-149p8jp2.tsv | 2 + .../golds/cpb-aacip-129-149p8jqs.tsv | 2 + .../golds/cpb-aacip-129-149p8jrh.tsv | 2 + .../golds/cpb-aacip-129-149p8js7.tsv | 2 + .../golds/cpb-aacip-129-149p8jtz.tsv | 2 + .../golds/cpb-aacip-129-149p8jvp.tsv | 2 + .../golds/cpb-aacip-129-150gbb9t.tsv | 2 + .../golds/cpb-aacip-129-15bcc6xr.tsv | 2 + .../golds/cpb-aacip-129-15p8d3jc.tsv | 2 + .../golds/cpb-aacip-129-15p8d3vw.tsv | 2 + .../golds/cpb-aacip-129-1615f209.tsv | 2 + .../golds/cpb-aacip-129-1615f211.tsv | 2 + .../golds/cpb-aacip-129-1615f22r.tsv | 2 + .../golds/cpb-aacip-129-16pzgsmw.tsv | 2 + .../golds/cpb-aacip-129-171vhpcz.tsv | 2 + .../golds/cpb-aacip-129-171vhpz8.tsv | 2 + .../golds/cpb-aacip-129-171vhq0p.tsv | 2 + .../golds/cpb-aacip-129-171vhq1d.tsv | 2 + .../golds/cpb-aacip-129-171vhq24.tsv | 2 + .../golds/cpb-aacip-129-171vhq3v.tsv | 2 + .../golds/cpb-aacip-129-17crjk7n.tsv | 2 + .../golds/cpb-aacip-129-17crjk8c.tsv | 2 + .../golds/cpb-aacip-129-17crjk93.tsv | 2 + .../golds/cpb-aacip-129-17crjkbt.tsv | 2 + .../golds/cpb-aacip-129-17qnkgg9.tsv | 2 + .../golds/cpb-aacip-129-17qnkgh1.tsv | 2 + .../golds/cpb-aacip-129-17qnkgjr.tsv | 2 + .../golds/cpb-aacip-129-182jmc2r.tsv | 2 + .../golds/cpb-aacip-129-182jmc3g.tsv | 2 + .../golds/cpb-aacip-129-182jmc46.tsv | 2 + .../golds/cpb-aacip-129-182jmc5x.tsv | 2 + .../golds/cpb-aacip-129-18dfn8g1.tsv | 2 + .../golds/cpb-aacip-129-18rbp4wm.tsv | 2 + .../golds/cpb-aacip-129-18rbp4xb.tsv | 2 + .../golds/cpb-aacip-129-18rbp4z2.tsv | 2 + .../golds/cpb-aacip-129-18rbp50g.tsv | 2 + .../golds/cpb-aacip-129-1937q1sk.tsv | 2 + .../golds/cpb-aacip-129-1937q1t9.tsv | 2 + .../golds/cpb-aacip-129-1937q1v1.tsv | 2 + .../golds/cpb-aacip-129-1937q1wr.tsv | 2 + .../golds/cpb-aacip-129-1937q1xg.tsv | 2 + .../golds/cpb-aacip-129-19f4qxsh.tsv | 2 + .../golds/cpb-aacip-129-19f4qz20.tsv | 2 + .../golds/cpb-aacip-129-19f4qz3q.tsv | 2 + .../golds/cpb-aacip-129-19f4qz4f.tsv | 2 + .../golds/cpb-aacip-129-19f4qz55.tsv | 2 + .../golds/cpb-aacip-129-19f4qz6w.tsv | 2 + .../golds/cpb-aacip-129-19f4qz7m.tsv | 2 + .../golds/cpb-aacip-129-19s1rtd4.tsv | 2 + .../golds/cpb-aacip-129-19s1rtfv.tsv | 2 + .../golds/cpb-aacip-129-203xsqcz.tsv | 2 + .../golds/cpb-aacip-129-203xsqdp.tsv | 2 + .../golds/cpb-aacip-129-203xsqfd.tsv | 2 + .../golds/cpb-aacip-129-203xsqg4.tsv | 2 + .../golds/cpb-aacip-129-203xsqhv.tsv | 2 + .../golds/cpb-aacip-129-203xsqjk.tsv | 2 + .../golds/cpb-aacip-129-203xsqk9.tsv | 2 + .../golds/cpb-aacip-129-20fttm6x.tsv | 2 + .../golds/cpb-aacip-129-20fttm7n.tsv | 2 + .../golds/cpb-aacip-129-20fttm8c.tsv | 2 + .../golds/cpb-aacip-129-20fttm93.tsv | 2 + .../golds/cpb-aacip-129-20fttmbt.tsv | 2 + .../golds/cpb-aacip-129-214mwcnc.tsv | 2 + .../golds/cpb-aacip-129-214mwcp3.tsv | 2 + .../golds/cpb-aacip-129-214mwcqt.tsv | 2 + .../golds/cpb-aacip-129-214mwd7c.tsv | 2 + .../golds/cpb-aacip-129-214mwd83.tsv | 2 + .../golds/cpb-aacip-129-21ghx8qd.tsv | 2 + .../golds/cpb-aacip-129-21ghx967.tsv | 2 + .../golds/cpb-aacip-129-21ghx97z.tsv | 2 + .../golds/cpb-aacip-129-21ghx98p.tsv | 2 + .../golds/cpb-aacip-129-21tdz599.tsv | 2 + .../golds/cpb-aacip-129-225b02ch.tsv | 2 + .../golds/cpb-aacip-129-225b02vn.tsv | 2 + .../golds/cpb-aacip-129-22h70x8k.tsv | 2 + .../golds/cpb-aacip-129-22h70xwm.tsv | 2 + .../golds/cpb-aacip-129-22h70xxb.tsv | 2 + .../golds/cpb-aacip-129-22h70xz2.tsv | 2 + .../golds/cpb-aacip-129-22h70z0g.tsv | 2 + .../golds/cpb-aacip-129-22v41v37.tsv | 2 + .../golds/cpb-aacip-129-22v41vkc.tsv | 2 + .../golds/cpb-aacip-129-22v41vm3.tsv | 2 + .../golds/cpb-aacip-129-23612r2n.tsv | 2 + .../golds/cpb-aacip-129-23612r3c.tsv | 2 + .../golds/cpb-aacip-129-23612r43.tsv | 2 + .../golds/cpb-aacip-129-23612r5t.tsv | 2 + .../golds/cpb-aacip-129-23612r6j.tsv | 2 + .../golds/cpb-aacip-129-23hx3ngb.tsv | 2 + .../golds/cpb-aacip-129-23vt4j3z.tsv | 2 + .../golds/cpb-aacip-129-23vt4j4p.tsv | 2 + .../golds/cpb-aacip-129-24jm6b6v.tsv | 2 + .../golds/cpb-aacip-129-24jm6b7k.tsv | 2 + .../golds/cpb-aacip-129-24jm6b89.tsv | 2 + .../golds/cpb-aacip-129-24wh75mr.tsv | 2 + .../golds/cpb-aacip-129-24wh75z0.tsv | 2 + .../golds/cpb-aacip-129-24wh760d.tsv | 2 + .../golds/cpb-aacip-129-257d82mw.tsv | 2 + .../golds/cpb-aacip-129-257d830j.tsv | 2 + .../golds/cpb-aacip-129-257d8318.tsv | 2 + .../golds/cpb-aacip-129-25k9905r.tsv | 2 + .../golds/cpb-aacip-129-25k990kf.tsv | 2 + .../golds/cpb-aacip-129-25k990m5.tsv | 2 + .../golds/cpb-aacip-129-25x69w02.tsv | 2 + .../golds/cpb-aacip-129-25x69w1s.tsv | 2 + .../golds/cpb-aacip-129-25x69w2h.tsv | 2 + .../golds/cpb-aacip-129-25x69w37.tsv | 2 + .../golds/cpb-aacip-129-25x69w4z.tsv | 2 + .../golds/cpb-aacip-129-2683brfx.tsv | 2 + .../golds/cpb-aacip-129-2683brgn.tsv | 2 + .../golds/cpb-aacip-129-2683brhc.tsv | 2 + .../golds/cpb-aacip-129-26m0cnq9.tsv | 2 + .../golds/cpb-aacip-129-26m0cnr1.tsv | 2 + .../golds/cpb-aacip-129-26m0cnsr.tsv | 2 + .../golds/cpb-aacip-129-26m0cntg.tsv | 2 + .../golds/cpb-aacip-129-26m0cnv6.tsv | 2 + .../golds/cpb-aacip-129-26m0cnwx.tsv | 2 + .../golds/cpb-aacip-129-26m0cnxn.tsv | 2 + .../golds/cpb-aacip-129-26m0cnzc.tsv | 2 + .../golds/cpb-aacip-129-26xwdj6f.tsv | 2 + .../golds/cpb-aacip-129-26xwdj75.tsv | 2 + .../golds/cpb-aacip-129-26xwdj8w.tsv | 2 + .../golds/cpb-aacip-129-278sfd92.tsv | 2 + .../golds/cpb-aacip-129-278sfdn9.tsv | 2 + .../golds/cpb-aacip-129-278sfdp1.tsv | 2 + .../golds/cpb-aacip-129-278sfdqr.tsv | 2 + .../golds/cpb-aacip-129-27mpgb30.tsv | 2 + .../golds/cpb-aacip-129-27mpgb4q.tsv | 2 + .../golds/cpb-aacip-129-27mpgb5f.tsv | 2 + .../golds/cpb-aacip-129-27mpgb65.tsv | 2 + .../golds/cpb-aacip-129-27mpgbmv.tsv | 2 + .../golds/cpb-aacip-129-27mpgbnk.tsv | 2 + .../golds/cpb-aacip-129-27zkh64m.tsv | 2 + .../golds/cpb-aacip-129-27zkh6k1.tsv | 2 + .../golds/cpb-aacip-129-27zkh6mr.tsv | 2 + .../golds/cpb-aacip-129-289gj39c.tsv | 2 + .../golds/cpb-aacip-129-289gj3pb.tsv | 2 + .../golds/cpb-aacip-129-28nck0px.tsv | 2 + .../golds/cpb-aacip-129-28nck0qn.tsv | 2 + .../golds/cpb-aacip-129-28nck11v.tsv | 2 + .../golds/cpb-aacip-129-28nck12k.tsv | 2 + .../golds/cpb-aacip-129-28nck139.tsv | 2 + .../golds/cpb-aacip-129-2908kwcw.tsv | 2 + .../golds/cpb-aacip-129-2908kwdm.tsv | 2 + .../golds/cpb-aacip-129-2908kwfb.tsv | 2 + .../golds/cpb-aacip-129-2908kwg2.tsv | 2 + .../golds/cpb-aacip-129-2908kwhs.tsv | 2 + .../golds/cpb-aacip-129-2908kwjh.tsv | 2 + .../golds/cpb-aacip-129-2908kwk7.tsv | 2 + .../golds/cpb-aacip-129-29b5mscg.tsv | 2 + .../golds/cpb-aacip-129-29b5msd6.tsv | 2 + .../golds/cpb-aacip-129-29b5msfx.tsv | 2 + .../golds/cpb-aacip-129-29b5mswb.tsv | 2 + .../golds/cpb-aacip-129-29b5msx2.tsv | 2 + .../golds/cpb-aacip-129-29b5mszs.tsv | 2 + .../golds/cpb-aacip-129-29p2nnzp.tsv | 2 + .../golds/cpb-aacip-129-29p2npc2.tsv | 2 + .../golds/cpb-aacip-129-29p2npds.tsv | 2 + .../golds/cpb-aacip-129-34sj422h.tsv | 2 + .../golds/cpb-aacip-129-4947dhdh.tsv | 2 + .../golds/cpb-aacip-129-60qrfv0q.tsv | 2 + .../golds/cpb-aacip-129-66j1009t.tsv | 2 + .../golds/cpb-aacip-129-69z08wkv.tsv | 2 + .../golds/cpb-aacip-129-76f1vvrm.tsv | 2 + .../golds/cpb-aacip-129-76rxwqnr.tsv | 2 + .../golds/cpb-aacip-129-78gf26qv.tsv | 2 + .../golds/cpb-aacip-129-83xsjgjh.tsv | 2 + .../golds/cpb-aacip-129-8605qtdf.tsv | 2 + .../golds/cpb-aacip-129-87pnw91c.tsv | 2 + .../golds/cpb-aacip-129-89280vgh.tsv | 2 + .../golds/cpb-aacip-129-91fj72nc.tsv | 2 + .../golds/cpb-aacip-131-0000003w.tsv | 2 + .../golds/cpb-aacip-131-00ns1s0n.tsv | 2 + .../golds/cpb-aacip-131-00ns1s1c.tsv | 2 + .../golds/cpb-aacip-131-010p2ntg.tsv | 2 + .../golds/cpb-aacip-131-01bk3jj8.tsv | 2 + .../golds/cpb-aacip-131-01bk3jk0.tsv | 2 + .../golds/cpb-aacip-131-021c5bgj.tsv | 2 + .../golds/cpb-aacip-131-02c8676b.tsv | 2 + .../golds/cpb-aacip-131-02c86772.tsv | 2 + .../golds/cpb-aacip-131-032280xk.tsv | 2 + .../golds/cpb-aacip-131-032280z9.tsv | 2 + .../golds/cpb-aacip-131-03cz8wvg.tsv | 2 + .../golds/cpb-aacip-131-03cz8ww6.tsv | 2 + .../golds/cpb-aacip-131-03cz8wxx.tsv | 2 + .../golds/cpb-aacip-131-06sxktcx.tsv | 2 + .../golds/cpb-aacip-131-06sxktdn.tsv | 2 + .../golds/cpb-aacip-131-06sxktfc.tsv | 2 + .../golds/cpb-aacip-131-08v9s5g1.tsv | 2 + .../golds/cpb-aacip-131-0966t2hw.tsv | 2 + .../golds/cpb-aacip-131-11kh19k7.tsv | 2 + .../golds/cpb-aacip-131-11kh19mz.tsv | 2 + .../golds/cpb-aacip-131-11xd2691.tsv | 2 + .../golds/cpb-aacip-131-12893358.tsv | 2 + .../golds/cpb-aacip-131-12m6403d.tsv | 2 + .../golds/cpb-aacip-131-12m64044.tsv | 2 + .../golds/cpb-aacip-131-12z34w2m.tsv | 2 + .../golds/cpb-aacip-131-12z34w3b.tsv | 2 + .../golds/cpb-aacip-131-12z34w42.tsv | 2 + .../golds/cpb-aacip-131-13mw6nqt.tsv | 2 + .../golds/cpb-aacip-131-150gb6zn.tsv | 2 + .../golds/cpb-aacip-131-1615dwph.tsv | 2 + .../golds/cpb-aacip-131-16pzgphg.tsv | 2 + .../golds/cpb-aacip-131-16pzgpj6.tsv | 2 + .../golds/cpb-aacip-131-16pzgpkx.tsv | 2 + .../golds/cpb-aacip-131-18rbp1gp.tsv | 2 + .../golds/cpb-aacip-131-18rbp1hd.tsv | 2 + .../golds/cpb-aacip-131-19f4qtck.tsv | 2 + .../golds/cpb-aacip-131-19f4qtd9.tsv | 2 + .../golds/cpb-aacip-131-19s1rq6j.tsv | 2 + .../golds/cpb-aacip-131-203xsm4n.tsv | 2 + .../golds/cpb-aacip-131-20fttgwg.tsv | 2 + .../golds/cpb-aacip-131-20fttgx6.tsv | 2 + .../golds/cpb-aacip-131-20sqvcqf.tsv | 2 + .../golds/cpb-aacip-131-214mw8h7.tsv | 2 + .../golds/cpb-aacip-131-22h70v81.tsv | 2 + .../golds/cpb-aacip-131-22v41qzd.tsv | 2 + .../golds/cpb-aacip-131-24wh7377.tsv | 2 + .../golds/cpb-aacip-131-25x69rnw.tsv | 2 + .../golds/cpb-aacip-131-2683bnjv.tsv | 2 + .../golds/cpb-aacip-131-2683bnkk.tsv | 2 + .../golds/cpb-aacip-131-278sfb1q.tsv | 2 + .../golds/cpb-aacip-131-27mpg719.tsv | 2 + .../golds/cpb-aacip-131-28ncjwhd.tsv | 2 + .../golds/cpb-aacip-131-29b5mpdz.tsv | 2 + .../golds/cpb-aacip-131-29b5mpfp.tsv | 2 + .../golds/cpb-aacip-131-30bvqbxv.tsv | 2 + .../golds/cpb-aacip-131-30prr7rt.tsv | 2 + .../golds/cpb-aacip-131-311ns4m2.tsv | 2 + .../golds/cpb-aacip-131-311ns4ns.tsv | 2 + .../golds/cpb-aacip-131-31cjt1mn.tsv | 2 + .../golds/cpb-aacip-131-32d7wq3f.tsv | 2 + .../golds/cpb-aacip-131-32d7wq45.tsv | 2 + .../golds/cpb-aacip-131-33dz0cpd.tsv | 2 + .../golds/cpb-aacip-131-33dz0cq4.tsv | 2 + .../golds/cpb-aacip-131-33dz0crv.tsv | 2 + .../golds/cpb-aacip-131-343r25bw.tsv | 2 + .../golds/cpb-aacip-131-34sj3z42.tsv | 2 + .../golds/cpb-aacip-131-34sj3z5s.tsv | 2 + .../golds/cpb-aacip-131-35t76mk3.tsv | 2 + .../golds/cpb-aacip-131-375tb64j.tsv | 2 + .../golds/cpb-aacip-131-38w9gndg.tsv | 2 + .../golds/cpb-aacip-131-3976hj9f.tsv | 2 + .../golds/cpb-aacip-131-40xpp0pm.tsv | 2 + .../golds/cpb-aacip-131-40xpp0qb.tsv | 2 + .../golds/cpb-aacip-131-41mgqsfm.tsv | 2 + .../golds/cpb-aacip-131-4298sk0x.tsv | 2 + .../golds/cpb-aacip-131-439zw7nq.tsv | 2 + .../golds/cpb-aacip-131-44bnzx7p.tsv | 2 + .../golds/cpb-aacip-131-44pk0t0t.tsv | 2 + .../golds/cpb-aacip-131-45q83gmg.tsv | 2 + .../golds/cpb-aacip-131-45q83gn6.tsv | 2 + .../golds/cpb-aacip-131-46254cmm.tsv | 2 + .../golds/cpb-aacip-131-46d258bd.tsv | 2 + .../golds/cpb-aacip-131-46qz653b.tsv | 2 + .../golds/cpb-aacip-131-472v7246.tsv | 2 + .../golds/cpb-aacip-131-47dr7xzt.tsv | 2 + .../golds/cpb-aacip-131-48ffbmhq.tsv | 2 + .../golds/cpb-aacip-131-48sbchfv.tsv | 2 + .../golds/cpb-aacip-131-48sbchgk.tsv | 2 + .../golds/cpb-aacip-131-48sbchh9.tsv | 2 + .../golds/cpb-aacip-131-48sbchj1.tsv | 2 + .../golds/cpb-aacip-131-4947ddbt.tsv | 2 + .../golds/cpb-aacip-131-4947ddcj.tsv | 2 + .../golds/cpb-aacip-131-4947ddd8.tsv | 2 + .../golds/cpb-aacip-131-4947ddf0.tsv | 2 + .../golds/cpb-aacip-131-49g4f942.tsv | 2 + .../golds/cpb-aacip-131-49g4f95s.tsv | 2 + .../golds/cpb-aacip-131-504xh2wf.tsv | 2 + .../golds/cpb-aacip-131-50gthzrg.tsv | 2 + .../golds/cpb-aacip-131-50tqjvkf.tsv | 2 + .../golds/cpb-aacip-131-51hhmnct.tsv | 2 + .../golds/cpb-aacip-131-5269pf21.tsv | 2 + .../golds/cpb-aacip-131-5370s3kh.tsv | 2 + .../golds/cpb-aacip-131-53jwt0gb.tsv | 2 + .../golds/cpb-aacip-131-53jwt0h2.tsv | 2 + .../golds/cpb-aacip-131-53jwt0js.tsv | 2 + .../golds/cpb-aacip-131-54kkwp29.tsv | 2 + .../golds/cpb-aacip-131-54xgxk15.tsv | 2 + .../golds/cpb-aacip-131-55m90bv6.tsv | 2 + .../golds/cpb-aacip-131-569324f7.tsv | 2 + .../golds/cpb-aacip-131-569324gz.tsv | 2 + .../golds/cpb-aacip-131-56n031d3.tsv | 2 + .../golds/cpb-aacip-131-56n031ft.tsv | 2 + .../golds/cpb-aacip-131-58bg7grf.tsv | 2 + .../golds/cpb-aacip-131-58pc8cg7.tsv | 2 + .../golds/cpb-aacip-131-59q2c22v.tsv | 2 + .../golds/cpb-aacip-131-59q2c23k.tsv | 2 + .../golds/cpb-aacip-131-612ngmjh.tsv | 2 + .../golds/cpb-aacip-131-612ngmk7.tsv | 2 + .../golds/cpb-aacip-131-61djhh89.tsv | 2 + .../golds/cpb-aacip-131-61rfjd9m.tsv | 2 + .../golds/cpb-aacip-131-623bk95v.tsv | 2 + .../golds/cpb-aacip-131-623bk96k.tsv | 2 + .../golds/cpb-aacip-131-6341nzsv.tsv | 2 + .../golds/cpb-aacip-131-64thtf1t.tsv | 2 + .../golds/cpb-aacip-131-65h9w6jq.tsv | 2 + .../golds/cpb-aacip-131-68kd57gw.tsv | 2 + .../golds/cpb-aacip-131-68kd57hm.tsv | 2 + .../golds/cpb-aacip-131-6986713n.tsv | 2 + .../golds/cpb-aacip-131-69z08svd.tsv | 2 + .../golds/cpb-aacip-131-69z08sw4.tsv | 2 + .../golds/cpb-aacip-131-719kdcc4.tsv | 2 + .../golds/cpb-aacip-131-720cg52b.tsv | 2 + .../golds/cpb-aacip-131-720cg532.tsv | 2 + .../golds/cpb-aacip-131-720cg54s.tsv | 2 + .../golds/cpb-aacip-131-72b8h1wm.tsv | 2 + .../golds/cpb-aacip-131-72b8h1xb.tsv | 2 + .../golds/cpb-aacip-131-7312jthq.tsv | 2 + .../golds/cpb-aacip-131-7312jtjf.tsv | 2 + .../golds/cpb-aacip-131-7312jtk5.tsv | 2 + .../golds/cpb-aacip-131-7312jtmw.tsv | 2 + .../golds/cpb-aacip-131-73bzkqhq.tsv | 2 + .../golds/cpb-aacip-131-75r7szf4.tsv | 2 + .../golds/cpb-aacip-131-75r7szgv.tsv | 2 + .../golds/cpb-aacip-131-773txj7n.tsv | 2 + .../golds/cpb-aacip-131-805x6js5.tsv | 2 + .../golds/cpb-aacip-131-80vq8bgt.tsv | 2 + .../golds/cpb-aacip-131-81jhb4bn.tsv | 2 + .../golds/cpb-aacip-131-82k6dstr.tsv | 2 + .../golds/cpb-aacip-131-82k6dsvg.tsv | 2 + .../golds/cpb-aacip-131-82k6dsw6.tsv | 2 + .../golds/cpb-aacip-131-82x3fpnq.tsv | 2 + .../golds/cpb-aacip-131-82x3fppf.tsv | 2 + .../golds/cpb-aacip-131-848pk81j.tsv | 2 + .../golds/cpb-aacip-131-848pk828.tsv | 2 + .../golds/cpb-aacip-131-85n8ptfs.tsv | 2 + .../golds/cpb-aacip-131-8605qqd6.tsv | 2 + .../golds/cpb-aacip-131-86b2rm75.tsv | 2 + .../golds/cpb-aacip-131-86b2rm8w.tsv | 2 + .../golds/cpb-aacip-131-86nzsh6f.tsv | 2 + .../golds/cpb-aacip-131-86nzsh75.tsv | 2 + .../golds/cpb-aacip-131-87brv8th.tsv | 2 + .../golds/cpb-aacip-131-87brv8v7.tsv | 2 + .../golds/cpb-aacip-131-87brv8wz.tsv | 2 + .../golds/cpb-aacip-131-87pnw5p6.tsv | 2 + .../golds/cpb-aacip-131-88qbzv7f.tsv | 2 + .../golds/cpb-aacip-131-89280r2k.tsv | 2 + .../golds/cpb-aacip-131-89280r39.tsv | 2 + .../golds/cpb-aacip-131-89r22hvq.tsv | 2 + .../golds/cpb-aacip-131-902z3dtj.tsv | 2 + .../golds/cpb-aacip-131-91fj709k.tsv | 2 + .../golds/cpb-aacip-131-91fj70b9.tsv | 2 + .../golds/cpb-aacip-131-91fj70c1.tsv | 2 + .../golds/cpb-aacip-131-91sf7w4w.tsv | 2 + .../golds/cpb-aacip-131-924b8rtt.tsv | 2 + .../golds/cpb-aacip-131-92g79nwv.tsv | 2 + .../golds/cpb-aacip-131-9351cfms.tsv | 2 + .../golds/cpb-aacip-131-9351cfnh.tsv | 2 + .../golds/cpb-aacip-131-945qg46t.tsv | 2 + .../golds/cpb-aacip-131-95j9kpkb.tsv | 2 + .../golds/cpb-aacip-131-9673ng7t.tsv | 2 + .../golds/cpb-aacip-131-988gttbp.tsv | 2 + .../golds/cpb-aacip-131-988gttcd.tsv | 2 + .../golds/cpb-aacip-131-988gttd4.tsv | 2 + .../golds/cpb-aacip-131-98z8wm7p.tsv | 2 + .../golds/cpb-aacip-131-9995xh0r.tsv | 2 + .../golds/cpb-aacip-131-9995xh1g.tsv | 2 + .../golds/cpb-aacip-153-000002z3.tsv | 2 + .../golds/cpb-aacip-153-009w0wcr.tsv | 2 + .../golds/cpb-aacip-153-032281kr.tsv | 2 + .../golds/cpb-aacip-153-03cz8xgx.tsv | 2 + .../golds/cpb-aacip-153-042rbpt6.tsv | 2 + .../golds/cpb-aacip-153-04dnckw7.tsv | 2 + .../golds/cpb-aacip-153-05s7h55x.tsv | 2 + .../golds/cpb-aacip-153-07gqnmcc.tsv | 2 + .../golds/cpb-aacip-153-07gqnmd3.tsv | 2 + .../golds/cpb-aacip-153-085hqddt.tsv | 2 + .../golds/cpb-aacip-153-09j3tzvs.tsv | 2 + .../golds/cpb-aacip-153-106wwrgz.tsv | 2 + .../golds/cpb-aacip-153-117m0f63.tsv | 2 + .../golds/cpb-aacip-153-128933r9.tsv | 2 + .../golds/cpb-aacip-153-128933s1.tsv | 2 + .../golds/cpb-aacip-153-14nk9bs9.tsv | 2 + .../golds/cpb-aacip-153-16c2fszm.tsv | 2 + .../golds/cpb-aacip-153-16c2ft2g.tsv | 2 + .../golds/cpb-aacip-153-16pzgptq.tsv | 2 + .../golds/cpb-aacip-153-17qnkc3t.tsv | 2 + .../golds/cpb-aacip-153-19f4qtn3.tsv | 2 + .../golds/cpb-aacip-153-19f4qtr8.tsv | 2 + .../golds/cpb-aacip-153-20sqvf3h.tsv | 2 + .../golds/cpb-aacip-153-21ghx5sb.tsv | 2 + .../golds/cpb-aacip-153-22h70vg3.tsv | 2 + .../golds/cpb-aacip-153-22h70vht.tsv | 2 + .../golds/cpb-aacip-153-23612n24.tsv | 2 + .../golds/cpb-aacip-153-23hx3hwt.tsv | 2 + .../golds/cpb-aacip-153-246q59t3.tsv | 2 + .../golds/cpb-aacip-153-257d80kb.tsv | 2 + .../golds/cpb-aacip-153-25x69s18.tsv | 2 + .../golds/cpb-aacip-153-26m0cjqs.tsv | 2 + .../golds/cpb-aacip-153-26xwdfzv.tsv | 2 + .../golds/cpb-aacip-153-278sfbrn.tsv | 2 + .../golds/cpb-aacip-153-28ncjx34.tsv | 2 + .../golds/cpb-aacip-153-28ncjx8r.tsv | 2 + .../golds/cpb-aacip-153-29b5mpnr.tsv | 2 + .../golds/cpb-aacip-153-300zpjd6.tsv | 2 + .../golds/cpb-aacip-153-30prr83g.tsv | 2 + .../golds/cpb-aacip-153-311ns4vv.tsv | 2 + .../golds/cpb-aacip-153-311ns4wk.tsv | 2 + .../golds/cpb-aacip-153-311ns5s3.tsv | 2 + .../golds/cpb-aacip-153-31cjt1tq.tsv | 2 + .../golds/cpb-aacip-153-31cjt1zm.tsv | 2 + .../golds/cpb-aacip-153-31qftxvc.tsv | 2 + .../golds/cpb-aacip-153-322bvtrb.tsv | 2 + .../golds/cpb-aacip-153-32d7wqdp.tsv | 2 + .../golds/cpb-aacip-153-33dz0d3h.tsv | 2 + .../golds/cpb-aacip-153-33dz0d5z.tsv | 2 + .../golds/cpb-aacip-153-33dz0d6p.tsv | 2 + .../golds/cpb-aacip-153-33rv190x.tsv | 2 + .../golds/cpb-aacip-153-34fn32g3.tsv | 2 + .../golds/cpb-aacip-153-35gb5rhg.tsv | 2 + .../golds/cpb-aacip-153-36547j47.tsv | 2 + .../golds/cpb-aacip-153-375tb6kp.tsv | 2 + .../golds/cpb-aacip-153-386hdw5n.tsv | 2 + .../golds/cpb-aacip-153-386hdw6c.tsv | 2 + .../golds/cpb-aacip-153-386hdz86.tsv | 2 + .../golds/cpb-aacip-153-38jdfrt9.tsv | 2 + .../golds/cpb-aacip-153-38w9gntw.tsv | 2 + .../golds/cpb-aacip-153-38w9gnx2.tsv | 2 + .../golds/cpb-aacip-153-40ksn45k.tsv | 2 + .../golds/cpb-aacip-153-4298skkz.tsv | 2 + .../golds/cpb-aacip-153-42n5tg81.tsv | 2 + .../golds/cpb-aacip-153-42n5tg9r.tsv | 2 + .../golds/cpb-aacip-153-42n5tgbg.tsv | 2 + .../golds/cpb-aacip-153-44bnzxr8.tsv | 2 + .../golds/cpb-aacip-153-44bnzxs0.tsv | 2 + .../golds/cpb-aacip-153-46254cw4.tsv | 2 + .../golds/cpb-aacip-153-472v72b8.tsv | 2 + .../golds/cpb-aacip-153-48ffbpfc.tsv | 2 + .../golds/cpb-aacip-153-48sbchpn.tsv | 2 + .../golds/cpb-aacip-189-01pg4fmz.tsv | 2 + .../golds/cpb-aacip-189-042rbpjb.tsv | 2 + .../golds/cpb-aacip-189-07tmph2c.tsv | 2 + .../golds/cpb-aacip-189-08v9s5rg.tsv | 2 + .../golds/cpb-aacip-189-09w0vv3c.tsv | 2 + .../golds/cpb-aacip-189-12m64032.tsv | 2 + .../golds/cpb-aacip-189-13zs7jf8.tsv | 2 + .../golds/cpb-aacip-189-20sqvcwq.tsv | 2 + .../golds/cpb-aacip-189-27zkh41j.tsv | 2 + .../golds/cpb-aacip-189-2908kskn.tsv | 2 + .../golds/cpb-aacip-189-29b5mpdm.tsv | 2 + .../golds/cpb-aacip-189-31qftxfm.tsv | 2 + .../golds/cpb-aacip-189-36tx995s.tsv | 2 + .../golds/cpb-aacip-189-38jdfrnm.tsv | 2 + .../golds/cpb-aacip-189-38jdfrpb.tsv | 2 + .../golds/cpb-aacip-189-39x0kb26.tsv | 2 + .../golds/cpb-aacip-189-4298sk0k.tsv | 2 + .../golds/cpb-aacip-189-4298sk19.tsv | 2 + .../golds/cpb-aacip-189-53jwt0jf.tsv | 2 + .../golds/cpb-aacip-189-55z617r8.tsv | 2 + .../golds/cpb-aacip-189-580k6krh.tsv | 2 + .../golds/cpb-aacip-189-59c5b54c.tsv | 2 + .../golds/cpb-aacip-189-60qrfqqn.tsv | 2 + .../golds/cpb-aacip-189-63fxpvk5.tsv | 2 + .../golds/cpb-aacip-189-63fxpvmw.tsv | 2 + .../golds/cpb-aacip-189-65h9w6k3.tsv | 2 + .../golds/cpb-aacip-189-67jq2jzc.tsv | 2 + .../golds/cpb-aacip-189-68kd57j0.tsv | 2 + .../golds/cpb-aacip-189-72p5hxzn.tsv | 2 + .../golds/cpb-aacip-189-741rnh6k.tsv | 2 + .../golds/cpb-aacip-189-784j16mh.tsv | 2 + .../golds/cpb-aacip-189-784j16n7.tsv | 2 + .../golds/cpb-aacip-189-80ht7fms.tsv | 2 + .../golds/cpb-aacip-189-80vq8bgg.tsv | 2 + .../golds/cpb-aacip-189-84zgn223.tsv | 2 + .../golds/cpb-aacip-189-86b2rmdf.tsv | 2 + .../golds/cpb-aacip-189-91fj707s.tsv | 2 + .../golds/cpb-aacip-189-92t4bjtn.tsv | 2 + .../golds/cpb-aacip-189-93ttf74w.tsv | 2 + .../golds/cpb-aacip-200-074tmrfw.tsv | 2 + .../golds/cpb-aacip-200-1937pzw7.tsv | 2 + .../golds/cpb-aacip-200-225b008g.tsv | 2 + .../golds/cpb-aacip-200-27zkh4b3.tsv | 2 + .../golds/cpb-aacip-200-31qftz5j.tsv | 2 + .../golds/cpb-aacip-200-31qftz68.tsv | 2 + .../golds/cpb-aacip-200-34fn338d.tsv | 2 + .../golds/cpb-aacip-200-36547jkm.tsv | 2 + .../golds/cpb-aacip-200-36tx9bnn.tsv | 2 + .../golds/cpb-aacip-200-375tb736.tsv | 2 + .../golds/cpb-aacip-200-386hdx1d.tsv | 2 + .../golds/cpb-aacip-200-43nvx5rv.tsv | 2 + .../golds/cpb-aacip-200-5269pg71.tsv | 2 + .../golds/cpb-aacip-200-558czgn1.tsv | 2 + .../golds/cpb-aacip-200-58bg7hk6.tsv | 2 + .../golds/cpb-aacip-200-58bg7hmx.tsv | 2 + .../golds/cpb-aacip-200-64thtfsf.tsv | 2 + .../golds/cpb-aacip-200-67jq2kz3.tsv | 2 + .../golds/cpb-aacip-200-708w9qpq.tsv | 2 + .../golds/cpb-aacip-200-7312jvbg.tsv | 2 + .../golds/cpb-aacip-200-74cnpf7m.tsv | 2 + .../golds/cpb-aacip-200-805x6m6x.tsv | 2 + .../golds/cpb-aacip-200-84zgn2vs.tsv | 2 + .../golds/cpb-aacip-200-86nzsjgm.tsv | 2 + .../golds/cpb-aacip-200-881jx3pq.tsv | 2 + .../golds/cpb-aacip-200-902z3ftx.tsv | 2 + .../golds/cpb-aacip-200-90dv4br2.tsv | 2 + .../golds/cpb-aacip-200-92g79pn5.tsv | 2 + .../golds/cpb-aacip-200-945qg5jf.tsv | 2 + .../golds/cpb-aacip-200-96wwq9p6.tsv | 2 + .../golds/cpb-aacip-235-042rcjzf.tsv | 2 + .../golds/cpb-aacip-235-15bcd0gv.tsv | 2 + .../golds/cpb-aacip-235-18dfp1rn.tsv | 2 + .../golds/cpb-aacip-235-19f4rq7f.tsv | 2 + .../golds/cpb-aacip-235-20ftvbhk.tsv | 2 + .../golds/cpb-aacip-235-36548ck9.tsv | 2 + .../golds/cpb-aacip-235-42n5v9dk.tsv | 2 + .../golds/cpb-aacip-235-47rn9r0k.tsv | 2 + .../golds/cpb-aacip-235-49t1h18x.tsv | 2 + .../golds/cpb-aacip-235-5370swqf.tsv | 2 + .../golds/cpb-aacip-235-580k7dqh.tsv | 2 + .../golds/cpb-aacip-235-67wm48rb.tsv | 2 + .../golds/cpb-aacip-235-69z09p02.tsv | 2 + .../golds/cpb-aacip-235-86b2sgc4.tsv | 2 + .../golds/cpb-aacip-235-92g7bgts.tsv | 2 + .../golds/cpb-aacip-235-92g7bgvh.tsv | 2 + .../golds/cpb-aacip-235-988gvq43.tsv | 2 + .../golds/cpb-aacip-29-01pg4g2x.tsv | 2 + .../golds/cpb-aacip-29-08v9s6dt.tsv | 2 + .../golds/cpb-aacip-29-106wwrfp.tsv | 2 + .../golds/cpb-aacip-29-117m0f2f.tsv | 2 + .../golds/cpb-aacip-29-11xd270w.tsv | 2 + .../golds/cpb-aacip-29-15bcc4sg.tsv | 2 + .../golds/cpb-aacip-29-22v41r8t.tsv | 2 + .../golds/cpb-aacip-29-24wh73nq.tsv | 2 + .../golds/cpb-aacip-29-29p2nkpp.tsv | 2 + .../golds/cpb-aacip-29-35t76n4f.tsv | 2 + .../golds/cpb-aacip-29-3976hk2f.tsv | 2 + .../golds/cpb-aacip-29-41mgqtx3.tsv | 2 + .../golds/cpb-aacip-29-440rz2bm.tsv | 2 + .../golds/cpb-aacip-29-46254dmz.tsv | 2 + .../golds/cpb-aacip-29-48ffbnfm.tsv | 2 + .../golds/cpb-aacip-29-4947dfbw.tsv | 2 + .../golds/cpb-aacip-29-49g4f9wp.tsv | 2 + .../golds/cpb-aacip-29-50tqjw98.tsv | 2 + .../golds/cpb-aacip-29-515mks96.tsv | 2 + .../golds/cpb-aacip-29-5269pfn6.tsv | 2 + .../golds/cpb-aacip-29-57np5qmn.tsv | 2 + .../golds/cpb-aacip-29-61rfjdxq.tsv | 2 + .../golds/cpb-aacip-29-66j0zx33.tsv | 2 + .../golds/cpb-aacip-29-66vx0sr0.tsv | 2 + .../golds/cpb-aacip-29-687h4cjj.tsv | 2 + .../golds/cpb-aacip-29-68kd58pq.tsv | 2 + .../golds/cpb-aacip-29-7312jv8m.tsv | 2 + .../golds/cpb-aacip-29-7634tw3m.tsv | 2 + .../golds/cpb-aacip-29-773txjgr.tsv | 2 + .../golds/cpb-aacip-29-784j17c1.tsv | 2 + .../golds/cpb-aacip-29-78tb30x7.tsv | 2 + .../golds/cpb-aacip-29-84mkm5rk.tsv | 2 + .../golds/cpb-aacip-29-86nzshb0.tsv | 2 + .../golds/cpb-aacip-29-89280s5z.tsv | 2 + .../golds/cpb-aacip-29-902z3fdn.tsv | 2 + .../golds/cpb-aacip-29-95w6mm5b.tsv | 2 + .../golds/cpb-aacip-29-95w6mmcg.tsv | 2 + .../golds/cpb-aacip-29-97kps24j.tsv | 2 + .../golds/cpb-aacip-29-9995xhq3.tsv | 2 + .../golds/cpb-aacip-293-03qv9sz0.tsv | 2 + .../golds/cpb-aacip-293-0966t2q0.tsv | 2 + .../golds/cpb-aacip-293-10jsxngk.tsv | 2 + .../golds/cpb-aacip-293-13905s74.tsv | 2 + .../golds/cpb-aacip-293-30prr83h.tsv | 2 + .../golds/cpb-aacip-293-31cjt22h.tsv | 2 + .../golds/cpb-aacip-293-3331zh63.tsv | 2 + .../golds/cpb-aacip-293-34sj3xzh.tsv | 2 + .../golds/cpb-aacip-293-38w9gntx.tsv | 2 + .../golds/cpb-aacip-293-472v72kc.tsv | 2 + .../golds/cpb-aacip-293-60cvdv8f.tsv | 2 + .../golds/cpb-aacip-293-68kd582n.tsv | 2 + .../golds/cpb-aacip-293-741rnhtq.tsv | 2 + .../golds/cpb-aacip-293-848pk8hf.tsv | 2 + .../golds/cpb-aacip-322-03cz8wl6.tsv | 2 + .../golds/cpb-aacip-322-04rjdg2h.tsv | 2 + .../golds/cpb-aacip-322-074tmqt8.tsv | 2 + .../golds/cpb-aacip-322-11xd26h5.tsv | 2 + .../golds/cpb-aacip-322-13lw6ngj.tsv | 2 + .../golds/cpb-aacip-322-24jm66h7.tsv | 2 + .../golds/cpb-aacip-322-28ncjx9j.tsv | 2 + .../golds/cpb-aacip-322-29b5mp4z.tsv | 2 + .../golds/cpb-aacip-322-29b5mp5p.tsv | 2 + .../golds/cpb-aacip-322-29b5mpzb.tsv | 2 + .../golds/cpb-aacip-322-300zpfvm.tsv | 2 + .../golds/cpb-aacip-322-31qftx5z.tsv | 2 + .../golds/cpb-aacip-322-31qftx7d.tsv | 2 + .../golds/cpb-aacip-322-3331zgm4.tsv | 2 + .../golds/cpb-aacip-322-3331zh3z.tsv | 2 + .../golds/cpb-aacip-322-343r25h9.tsv | 2 + .../golds/cpb-aacip-322-36tx99km.tsv | 2 + .../golds/cpb-aacip-322-3976hjwj.tsv | 2 + .../golds/cpb-aacip-322-3976hjz0.tsv | 2 + .../golds/cpb-aacip-322-43nvx4bk.tsv | 2 + .../golds/cpb-aacip-322-48ffbldb.tsv | 2 + .../golds/cpb-aacip-322-52w3r6lw.tsv | 2 + .../golds/cpb-aacip-322-55l90bhr.tsv | 2 + .../golds/cpb-aacip-322-55m90c8c.tsv | 2 + .../golds/cpb-aacip-322-569324rj.tsv | 2 + .../golds/cpb-aacip-322-61rfjd1l.tsv | 2 + .../golds/cpb-aacip-322-61rfjd9d.tsv | 2 + .../golds/cpb-aacip-322-62s4n2mj.tsv | 2 + .../golds/cpb-aacip-322-62s4n3bf.tsv | 2 + .../golds/cpb-aacip-322-65h9w7mn.tsv | 2 + .../golds/cpb-aacip-322-720cg4wt.tsv | 2 + .../golds/cpb-aacip-322-72b8h1rh.tsv | 2 + .../golds/cpb-aacip-322-73bzkqbw.tsv | 2 + .../golds/cpb-aacip-322-7634tvj7.tsv | 2 + .../golds/cpb-aacip-322-76f1vrn0.tsv | 2 + .../golds/cpb-aacip-322-784j1746.tsv | 2 + .../golds/cpb-aacip-322-78gf23pp.tsv | 2 + .../golds/cpb-aacip-322-83kwhg7z.tsv | 2 + .../golds/cpb-aacip-322-83kwhg8p.tsv | 2 + .../golds/cpb-aacip-322-83xsjcn7.tsv | 2 + .../golds/cpb-aacip-322-89d51ncg.tsv | 2 + .../golds/cpb-aacip-322-924b8scw.tsv | 2 + .../golds/cpb-aacip-322-92t4bjgj.tsv | 2 + .../golds/cpb-aacip-322-93ttf72k.tsv | 2 + .../golds/cpb-aacip-322-95w6mkvh.tsv | 2 + .../golds/cpb-aacip-322-9673ng3q.tsv | 2 + .../golds/cpb-aacip-322-98mcvqxc.tsv | 2 + .../golds/cpb-aacip-394-0322868j.tsv | 2 + .../golds/cpb-aacip-394-150gbd75.tsv | 2 + .../golds/cpb-aacip-394-16pzgvnd.tsv | 2 + .../golds/cpb-aacip-394-20sqvk0z.tsv | 2 + .../golds/cpb-aacip-394-25k99270.tsv | 2 + .../golds/cpb-aacip-394-28nck2pq.tsv | 2 + .../golds/cpb-aacip-394-30prrfj6.tsv | 2 + .../golds/cpb-aacip-394-34sj440v.tsv | 2 + .../golds/cpb-aacip-394-35t76v43.tsv | 2 + .../golds/cpb-aacip-394-37hqc8bh.tsv | 2 + .../golds/cpb-aacip-394-44pk10gn.tsv | 2 + .../golds/cpb-aacip-394-57np5x9q.tsv | 2 + .../golds/cpb-aacip-394-59189f7b.tsv | 2 + .../golds/cpb-aacip-394-601zd3mb.tsv | 2 + .../golds/cpb-aacip-394-63fxq1nn.tsv | 2 + .../golds/cpb-aacip-394-8605qwd7.tsv | 2 + .../golds/cpb-aacip-394-881jx8bt.tsv | 2 + .../golds/cpb-aacip-394-94hmh6pk.tsv | 2 + .../golds/cpb-aacip-394-9995xntg.tsv | 2 + .../golds/cpb-aacip-41-009w13fb.tsv | 2 + .../golds/cpb-aacip-41-074tmwc8.tsv | 2 + .../golds/cpb-aacip-41-10wpzpt5.tsv | 2 + .../golds/cpb-aacip-41-13zs7qh0.tsv | 2 + .../golds/cpb-aacip-41-14nk9bkf.tsv | 2 + .../golds/cpb-aacip-41-16pzgq2f.tsv | 2 + .../golds/cpb-aacip-41-171vhkmr.tsv | 2 + .../golds/cpb-aacip-41-17qnkc9c.tsv | 2 + .../golds/cpb-aacip-41-214mwjjg.tsv | 2 + .../golds/cpb-aacip-41-21ghx61z.tsv | 2 + .../golds/cpb-aacip-41-21tdz99t.tsv | 2 + .../golds/cpb-aacip-41-33dz0cwr.tsv | 2 + .../golds/cpb-aacip-41-34fn32g7.tsv | 2 + .../golds/cpb-aacip-41-35gb5r1d.tsv | 2 + .../golds/cpb-aacip-41-39k3jfhm.tsv | 2 + .../golds/cpb-aacip-41-48sbchtd.tsv | 2 + .../golds/cpb-aacip-41-569324rv.tsv | 2 + .../golds/cpb-aacip-41-579s4tcv.tsv | 2 + .../golds/cpb-aacip-41-644qrngt.tsv | 2 + .../golds/cpb-aacip-41-644qrnhh.tsv | 2 + .../golds/cpb-aacip-41-655dvb4p.tsv | 2 + .../golds/cpb-aacip-41-708w9q63.tsv | 2 + .../golds/cpb-aacip-41-7634tvxz.tsv | 2 + .../golds/cpb-aacip-41-78tb30hd.tsv | 2 + .../golds/cpb-aacip-41-816m97tj.tsv | 2 + .../golds/cpb-aacip-41-84mkm5br.tsv | 2 + .../golds/cpb-aacip-81-032281c4.tsv | 2 + .../golds/cpb-aacip-81-11xd26xt.tsv | 2 + .../golds/cpb-aacip-81-19f4qtzt.tsv | 2 + .../golds/cpb-aacip-81-23hx3j34.tsv | 2 + .../golds/cpb-aacip-81-2683bnv7.tsv | 2 + .../golds/cpb-aacip-81-30bvqccj.tsv | 2 + .../golds/cpb-aacip-81-34fn32xq.tsv | 2 + .../golds/cpb-aacip-81-37vmd08g.tsv | 2 + .../golds/cpb-aacip-81-48sbchx0.tsv | 2 + .../golds/cpb-aacip-81-49g4f9z1.tsv | 2 + .../golds/cpb-aacip-81-49t1g6kv.tsv | 2 + .../golds/cpb-aacip-81-558czgg5.tsv | 2 + .../golds/cpb-aacip-81-65v6x4b5.tsv | 2 + .../golds/cpb-aacip-81-708w9q47.tsv | 2 + .../golds/cpb-aacip-81-74cnpdn4.tsv | 2 + .../golds/cpb-aacip-81-74qjq9nj.tsv | 2 + .../golds/cpb-aacip-81-881jx33t.tsv | 2 + .../golds/cpb-aacip-81-902z3f9j.tsv | 2 + .../golds/cpb-aacip-81-90dv4bd1.tsv | 2 + .../golds/cpb-aacip-81-988gttr0.tsv | 2 + january-slates/guidelines.md | 1 - january-slates/process.py | 57 ++++++++++---- january-slates/readme.md | 78 ++++++++++++++++--- 1739 files changed, 1819 insertions(+), 1800 deletions(-) delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003cx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003dn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w0zrj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w108r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w109g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w7z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w8p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w9d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2rqj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s01.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s1r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3p94.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pbv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pck.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pd9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pf1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jn8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jp0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-021c5drw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b5v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b6k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b79.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bpq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bqf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86br5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bsw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q57728.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577f7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577gz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322848r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322849g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284b6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284cx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284dn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284fc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91m0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91nq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91pf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9w9q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wbf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wc5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs7d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs84.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsvf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsw5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsxw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncnzh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncpfb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk17.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk2z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk3p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk4d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk54.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk6v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgdb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgrk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgs9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgt1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgbzt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcbg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcc6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcdx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h80t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h81j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h828.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j42q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j4kk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k1vz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k28b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k292.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2bs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2ch.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwx2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwzs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxdw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxfm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxgb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxh2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxjs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv5n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv6c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv73.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv8t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv9j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvb8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvc0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr7p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr8d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmmj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmn8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmp0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmqq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhbw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhcm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhdb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhf2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrc8b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcn9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcp1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcqr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcrg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrctx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcvn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s8dt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s91j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s928.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s930.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s94q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s95f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t5qg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t634.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t64v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t65k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t669.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t671.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t68r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v318.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v320.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v33q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v34f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzcr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzdg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvmc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvn3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvpt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10jsxqr5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmxc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmz3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznbr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzncg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznd6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hmm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hnb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hp2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dst.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dtj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29f5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29x9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29z1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b0f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b15.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b2w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b3m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936f9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936g1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936hr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936jg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936k6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936mx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936nn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6433n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6434c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m64353.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z35074.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3508v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3509k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z350b9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vnm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vpb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w20.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w3q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w4f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w55.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6rz4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s0j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s18.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s20.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s3q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13zs7nrc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8j6x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jp2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jqs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jrh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8js7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jtz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jvp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-14nk9fh1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-150gbb9t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15bcc6xr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3jc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3vw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f209.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f211.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f22r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-16pzgsmw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpcz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpz8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq0p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq1d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq24.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq3v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk7n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk8c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk93.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjkbt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgg9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgh1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgjr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc2r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc3g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc46.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc5x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18dfn8g1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4wm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4xb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4z2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp50g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1sk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1t9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1v1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1wr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1xg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qxsh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz20.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz3q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz4f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz55.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz6w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz7m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtd4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtfv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqcz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqdp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqfd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqg4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqhv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqjk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqk9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm6x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm7n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm8c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm93.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttmbt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcnc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcp3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcqt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd7c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd83.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx8qd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx967.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx97z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx98p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21tdz599.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02ch.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02vn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70x8k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xwm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xxb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xz2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70z0g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41v37.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vkc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vm3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r2n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r3c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r43.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r5t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r6j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23hx3ngb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j3z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j4p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b6v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b7k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b89.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75mr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75z0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh760d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d82mw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d830j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d8318.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k9905r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990kf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990m5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w02.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w1s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w2h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w37.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w4z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brfx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brgn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brhc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnq9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnr1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnsr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cntg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnv6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnwx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnxn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnzc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj6f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj75.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj8w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfd92.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdn9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdp1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdqr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb30.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb4q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb5f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb65.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbmv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbnk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh64m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6k1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6mr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj39c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3pb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3q2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0px.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0qn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck11v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck12k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck139.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwcw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwdm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwfb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwg2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwhs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwjh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwk7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mscg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msd6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msfx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mswb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msx2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mszs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2nnzp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npc2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npds.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-34sj422h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-4947dhdh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-60qrfv0q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-66j1009t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-69z08wkv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76f1vvrm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76rxwqnr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-78gf26qv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-83xsjgjh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-8605qtdf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-87pnw91c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-89280vgh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-129-91fj72nc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0000003w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s0n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s1c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-010p2ntg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jj8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jk0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-021c5bgj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c8676b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c86772.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280xk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280z9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wvg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8ww6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wxx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktcx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktdn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktfc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-08v9s5g1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0966t2hw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19k7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19mz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11xd2691.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12893358.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m6403d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m64044.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w2m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w3b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w42.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-13mw6nqt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-14nk9b68.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-150gb6zn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-1615dwph.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgphg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpj6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpkx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpmn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1gp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1hd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtck.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtd9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19s1rq6j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-203xsm4n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgwg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgx6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20sqvcqf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-214mw8h7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22h70v81.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22v41qzd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-24wh7377.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-25x69rnw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnjv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnkk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-26m0cjnm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-278sfb1q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-27mpg719.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-28ncjwhd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpdz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpfp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30bvqbxv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30prr7rt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4m2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4ns.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-31cjt1mn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq3f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq45.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cpd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cq4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0crv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-343r25bw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z42.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z5s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-35t76mk3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-375tb64j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-38w9gndg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-3976hj9f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0pm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0qb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-41mgqsfm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4298sk0x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-439zw7nq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44bnzx7p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44pk0t0t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gmg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gn6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46254cmm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46d258bd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46qz653b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-472v7246.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-47dr7xzt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48ffbmhq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchfv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchgk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchh9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchj1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddbt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddcj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddd8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddf0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f942.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f95s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-504xh2wf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50gthzrg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50tqjvkf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-51hhmnct.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5269pf21.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5370s3kh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0gb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0h2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0js.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54kkwp29.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54xgxk15.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-55m90bv6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324f7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324gz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031d3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031ft.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58bg7grf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58pc8cg7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c22v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c23k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmjh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmk7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61djhh89.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61rfjd9m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk95v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk96k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzr4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzsv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-64thtf1t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-65h9w6jq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57gw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57hm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6986713n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08svd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sw4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sxv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-719kdcc4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-71ngf85c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg52b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg532.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg54s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1wm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1xb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1z2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jthq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtjf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtk5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtmw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-73bzkqhq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szf4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szgv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-773txj7n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-805x6js5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-80vq8bgt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-81jhb4bn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dstr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsvg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsw6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fpnq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fppf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8380gkm4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-83kwhgbb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk81j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk828.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptfs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptgh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8605qqd6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm75.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm8w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh6f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh75.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8th.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8v7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8wz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87pnw5p6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-88qbzv7f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r2k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r39.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89r22hvq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-902z3dtj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj709k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70b9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70c1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91sf7w4w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-924b8rtt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-92g79nwv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfms.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfnh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-945qg46t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-95j9kpkb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9673ng7t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttbp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttcd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttd4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-98z8wm7p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh0r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh1g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000000vj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000002z3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-009w0wcr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-032281kr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-03cz8xgx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-042rbpt6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-04dnckw7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-05s7h55x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmcc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmd3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-085hqddt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-09j3tzvs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-106wwrgz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-117m0f63.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933r9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933s1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-12z34wf9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-13zs7k0m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-14nk9bs9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-1615f088.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2fszm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2ft2g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16pzgptq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-17qnkc3t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtn3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtr8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20fttk52.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20sqvf3h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5sb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5wh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx898.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vg3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vht.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612n24.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612q02.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23hx3hwt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-246q59t3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80kb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80ph.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-25x69s18.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26m0cjqs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26xwdfzv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-278sfbrn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx34.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx8r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-29b5mpnr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-300zpjd6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-30prr83g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4vv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4wk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns5s3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1tq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1zm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31qftxvc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvtrb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvvg7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-32d7wqdp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d3h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d5z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d6p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33rv190x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-34fn32g3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-35gb5rhg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j3h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j47.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-375tb6kp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw5n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw6c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdz86.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38jdfrt9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gntw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gnx2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn45k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn6d1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp120.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp17m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-4298skkz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg79.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg81.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg9r.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tgbg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-440rz203.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxr8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxs0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-46254cw4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-472v72b8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48ffbpfc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48sbchpn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-01pg4fmz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-042rbpjb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-07tmph2c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-08v9s5rg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-09w0vv3c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-12m64032.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-13zs7jf8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-20sqvcwq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-27zkh41j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-2908kskn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-29b5mpdm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-31qftxfm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-36tx995s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrnm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrpb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-39x0kb26.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk0k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk19.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-53jwt0jf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-55z617r8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-580k6krh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-59c5b54c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-60qrfqqn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvk5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvmw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-65h9w6k3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-67jq2jzc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-68kd57j0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-72p5hxzn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-741rnh6k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16mh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16n7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80ht7fms.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80vq8bgg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-84zgn223.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-86b2rmdf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-881jx2qq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-91fj707s.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-92t4bjtn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-189-93ttf74w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-074tmrfw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-150gb84b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-1937pzw7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-225b008g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-27zkh4b3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz5j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz68.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-34fn338d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36547jkm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36tx9bnn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-375tb736.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-386hdx1d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-43nvx5rv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-5269pg71.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-558czgn1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hk6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hmx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-64thtfsf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-67jq2kz3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-708w9qpq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-7312jvbg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-74cnpf7m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-805x6m6x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-84zgn2vs.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-86nzsjgm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-881jx3pq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-902z3ftx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-90dv4br2.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-92g79pn5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-945qg5jf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-200-96wwq9p6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-042rcjzf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-15bcd0gv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-18dfp1rn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-19f4rq7f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-20ftvbhk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-36548ck9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-37vmdv3d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-3976jbt0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-42n5v9dk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-47rn9r0k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-49t1h18x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-5370swqf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-580k7dqh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-67wm48rb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-69z09p02.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-86b2sgc4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-924b9nm7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgts.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgvh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-235-988gvq43.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-01pg4g2x.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-06sxkv86.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-08v9s6dt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-106wwrfp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-117m0f2f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-11xd270w.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-15bcc4sg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-22v41r8t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-24wh73nq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-29p2nkpp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-35t76n4f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-3976hk2f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-41mgqtx3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-440rz2bm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-46254dmz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-48ffbnfm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-4947dfbw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-49g4f9wp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-50tqjw98.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-515mks96.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-5269pfn6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-57np5qmn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-61rfjdxq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66j0zx33.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66vx0sr0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-687h4cjj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-68kd58pq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7312jv8m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7634tw3m.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-773txjgr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-784j17c1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-78tb30x7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-84mkm5rk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-86nzshb0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-89280s5z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-902z3fdn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mm5b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mmcg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-97kps24j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-29-9995xhq3.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-03qv9sz0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-0966t2q0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-10jsxngk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-13905s74.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-30prr83h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-31cjt22h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-3331zh63.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-34sj3xzh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-38w9gntx.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-472v72kc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-60cvdv8f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-68kd582n.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-741rnhtq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-293-848pk8hf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-03cz8wl6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-04rjdg2h.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-074tmqt8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-11xd26h5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-13lw6ngj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-24jm66h7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-28ncjx9j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp4z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp5p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mpzb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-300zpfvm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx5z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx7d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zgm4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zh3z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-343r25h9.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-36tx99km.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjwj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjz0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-43nvx4bk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-48ffbldb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-52w3r6lw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55l90bhr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55m90c8c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-569324rj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd1l.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd9d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n2mj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n3bf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-65h9w7mn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-719kdcsm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-720cg4wt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-72b8h1rh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-73bzkqbw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-7634tvj7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-76f1vrn0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-784j1746.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-78gf23pp.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg7z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg8p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83xsjcn7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-89d51ncg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-924b8scw.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-92t4bjgj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-93ttf72k.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-95w6mkvh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-9673ng3q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-322-98mcvqxc.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-0322868j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-150gbd75.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-16pzgvnd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-20sqvk0z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-25k99270.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-28nck2pq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-30prrfj6.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-34sj440v.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-35t76v43.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-37hqc8bh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-44pk10gn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-57np5x9q.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-59189f7b.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-601zd3mb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-612ngsdn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-63fxq1nn.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-8605qwd7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-881jx8bt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-94hmh6pk.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-394-9995xntg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-009w13fb.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-074tmwc8.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-10wpzpt5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-13zs7qh0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-14nk9bkf.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-16pzgq2f.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-171vhkmr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-17qnkc9c.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-214mwjjg.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21ghx61z.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21tdz99t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-33dz0cwr.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-34fn32g7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-35gb5r1d.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-39k3jfhm.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-48sbchtd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-569324rv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-579s4tcv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrngt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrnhh.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-655dvb4p.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-708w9q63.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-7634tvxz.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-78tb30hd.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-816m97tj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-84mkm5br.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-41-881jx339.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-032281c4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-11xd26xt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-19f4qtzt.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-23hx3j34.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-2683bnv7.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-30bvqccj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-34fn32xq.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-37vmd08g.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-48sbchx0.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49g4f9z1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49t1g6kv.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-558czgg5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-65v6x4b5.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-708w9q47.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74cnpdn4.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74qjq9nj.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-881jx33t.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-902z3f9j.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-90dv4bd1.tsv delete mode 100644 january-slates/golds/aapb-collaboration-7/cpb-aacip-81-988gttr0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-000003cx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-000003dn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-009w0zrj.tsv create mode 100644 january-slates/golds/cpb-aacip-129-009w108r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-009w109g.tsv create mode 100644 january-slates/golds/cpb-aacip-129-00ns1w7z.tsv create mode 100644 january-slates/golds/cpb-aacip-129-00ns1w8p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-00ns1w9d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-010p2rqj.tsv create mode 100644 january-slates/golds/cpb-aacip-129-010p2s01.tsv create mode 100644 january-slates/golds/cpb-aacip-129-010p2s1r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01bk3p94.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01bk3pck.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01bk3pd9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01bk3pf1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01pg4jn8.tsv create mode 100644 january-slates/golds/cpb-aacip-129-01pg4jp0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-021c5drw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86b5v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86b6k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86b79.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86bpq.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86bqf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86br5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02c86bsw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02q57728.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02q577f7.tsv create mode 100644 january-slates/golds/cpb-aacip-129-02q577gz.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0322848r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0322849g.tsv create mode 100644 january-slates/golds/cpb-aacip-129-032284b6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-032284cx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-032284dn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-032284fc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03cz91m0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03cz91nq.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03cz91pf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03qv9w9q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03qv9wbf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-03qv9wc5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-042rbs7d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-042rbs84.tsv create mode 100644 january-slates/golds/cpb-aacip-129-042rbsvf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-042rbsw5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-042rbsxw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04dncnzh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04dncpfb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk17.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk2z.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk3p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk4d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk54.tsv create mode 100644 january-slates/golds/cpb-aacip-129-04rjdk6v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-053ffgdb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-053ffgrk.tsv create mode 100644 january-slates/golds/cpb-aacip-129-053ffgs9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-053ffgt1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05fbgbzt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05fbgcbg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05fbgcc6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05fbgcdx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05s7h80t.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05s7h81j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-05s7h828.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0644j42q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0644j4kk.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06g1k1vz.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06g1k28b.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06g1k292.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06g1k2bs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06g1k2ch.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkwx2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkwzs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkxdw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkxfm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkxgb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkxh2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-06sxkxjs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmv5n.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmv6c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmv73.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmv8t.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmv9j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmvb8.tsv create mode 100644 january-slates/golds/cpb-aacip-129-074tmvc0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07gqnr7p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07gqnr8d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07tmpmmj.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07tmpmn8.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07tmpmp0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-07tmpmqq.tsv create mode 100644 january-slates/golds/cpb-aacip-129-085hqhbw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-085hqhcm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-085hqhdb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-085hqhf2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrc8b.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrcn9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrcp1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrcqr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrcrg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrctx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08hdrcvn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s8dt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s91j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s928.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s930.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s94q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-08v9s95f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t5qg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t64v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t65k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t669.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t671.tsv create mode 100644 january-slates/golds/cpb-aacip-129-0966t68r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09j3v318.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09j3v320.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09j3v33q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09j3v34f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09w0vzcr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-09w0vzdg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-106wwvmc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-106wwvn3.tsv create mode 100644 january-slates/golds/cpb-aacip-129-106wwvpt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10jsxqr5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10wpzmxc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10wpzmz3.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10wpznbr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10wpzncg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-10wpznd6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-117m0hmm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-117m0hnb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-117m0hp2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11kh1dst.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11kh1dtj.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd29f5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd29x9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd29z1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd2b0f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd2b15.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd2b2w.tsv create mode 100644 january-slates/golds/cpb-aacip-129-11xd2b3m.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936f9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936g1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936hr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936jg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936k6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936mx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-128936nn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12m6433n.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12m6434c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12m64353.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12z35074.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12z3508v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12z3509k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-12z350b9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905vnm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905vpb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905w20.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905w3q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905w4f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13905w55.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13mw6rz4.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13mw6s0j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13mw6s18.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13mw6s20.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13mw6s3q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-13zs7nrc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8j6x.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8jp2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8jqs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8jrh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8js7.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8jtz.tsv create mode 100644 january-slates/golds/cpb-aacip-129-149p8jvp.tsv create mode 100644 january-slates/golds/cpb-aacip-129-150gbb9t.tsv create mode 100644 january-slates/golds/cpb-aacip-129-15bcc6xr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-15p8d3jc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-15p8d3vw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1615f209.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1615f211.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1615f22r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-16pzgsmw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhpcz.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhpz8.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhq0p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhq1d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhq24.tsv create mode 100644 january-slates/golds/cpb-aacip-129-171vhq3v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17crjk7n.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17crjk8c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17crjk93.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17crjkbt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17qnkgg9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17qnkgh1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-17qnkgjr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-182jmc2r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-182jmc3g.tsv create mode 100644 january-slates/golds/cpb-aacip-129-182jmc46.tsv create mode 100644 january-slates/golds/cpb-aacip-129-182jmc5x.tsv create mode 100644 january-slates/golds/cpb-aacip-129-18dfn8g1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-18rbp4wm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-18rbp4xb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-18rbp4z2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-18rbp50g.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1937q1sk.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1937q1t9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1937q1v1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1937q1wr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-1937q1xg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qxsh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz20.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz3q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz4f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz55.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz6w.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19f4qz7m.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19s1rtd4.tsv create mode 100644 january-slates/golds/cpb-aacip-129-19s1rtfv.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqcz.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqdp.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqfd.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqg4.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqhv.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqjk.tsv create mode 100644 january-slates/golds/cpb-aacip-129-203xsqk9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-20fttm6x.tsv create mode 100644 january-slates/golds/cpb-aacip-129-20fttm7n.tsv create mode 100644 january-slates/golds/cpb-aacip-129-20fttm8c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-20fttm93.tsv create mode 100644 january-slates/golds/cpb-aacip-129-20fttmbt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-214mwcnc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-214mwcp3.tsv create mode 100644 january-slates/golds/cpb-aacip-129-214mwcqt.tsv create mode 100644 january-slates/golds/cpb-aacip-129-214mwd7c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-214mwd83.tsv create mode 100644 january-slates/golds/cpb-aacip-129-21ghx8qd.tsv create mode 100644 january-slates/golds/cpb-aacip-129-21ghx967.tsv create mode 100644 january-slates/golds/cpb-aacip-129-21ghx97z.tsv create mode 100644 january-slates/golds/cpb-aacip-129-21ghx98p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-21tdz599.tsv create mode 100644 january-slates/golds/cpb-aacip-129-225b02ch.tsv create mode 100644 january-slates/golds/cpb-aacip-129-225b02vn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22h70x8k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22h70xwm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22h70xxb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22h70xz2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22h70z0g.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22v41v37.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22v41vkc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-22v41vm3.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23612r2n.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23612r3c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23612r43.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23612r5t.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23612r6j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23hx3ngb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23vt4j3z.tsv create mode 100644 january-slates/golds/cpb-aacip-129-23vt4j4p.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24jm6b6v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24jm6b7k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24jm6b89.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24wh75mr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24wh75z0.tsv create mode 100644 january-slates/golds/cpb-aacip-129-24wh760d.tsv create mode 100644 january-slates/golds/cpb-aacip-129-257d82mw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-257d830j.tsv create mode 100644 january-slates/golds/cpb-aacip-129-257d8318.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25k9905r.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25k990kf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25k990m5.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25x69w02.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25x69w1s.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25x69w2h.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25x69w37.tsv create mode 100644 january-slates/golds/cpb-aacip-129-25x69w4z.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2683brfx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2683brgn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2683brhc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnq9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnr1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnsr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cntg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnv6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnwx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnxn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26m0cnzc.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26xwdj6f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26xwdj75.tsv create mode 100644 january-slates/golds/cpb-aacip-129-26xwdj8w.tsv create mode 100644 january-slates/golds/cpb-aacip-129-278sfd92.tsv create mode 100644 january-slates/golds/cpb-aacip-129-278sfdn9.tsv create mode 100644 january-slates/golds/cpb-aacip-129-278sfdp1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-278sfdqr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgb30.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgb4q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgb5f.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgb65.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgbmv.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27mpgbnk.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27zkh64m.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27zkh6k1.tsv create mode 100644 january-slates/golds/cpb-aacip-129-27zkh6mr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-289gj39c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-289gj3pb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-28nck0px.tsv create mode 100644 january-slates/golds/cpb-aacip-129-28nck0qn.tsv create mode 100644 january-slates/golds/cpb-aacip-129-28nck11v.tsv create mode 100644 january-slates/golds/cpb-aacip-129-28nck12k.tsv create mode 100644 january-slates/golds/cpb-aacip-129-28nck139.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwcw.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwdm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwfb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwg2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwhs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwjh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-2908kwk7.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5mscg.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5msd6.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5msfx.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5mswb.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5msx2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29b5mszs.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29p2nnzp.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29p2npc2.tsv create mode 100644 january-slates/golds/cpb-aacip-129-29p2npds.tsv create mode 100644 january-slates/golds/cpb-aacip-129-34sj422h.tsv create mode 100644 january-slates/golds/cpb-aacip-129-4947dhdh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-60qrfv0q.tsv create mode 100644 january-slates/golds/cpb-aacip-129-66j1009t.tsv create mode 100644 january-slates/golds/cpb-aacip-129-69z08wkv.tsv create mode 100644 january-slates/golds/cpb-aacip-129-76f1vvrm.tsv create mode 100644 january-slates/golds/cpb-aacip-129-76rxwqnr.tsv create mode 100644 january-slates/golds/cpb-aacip-129-78gf26qv.tsv create mode 100644 january-slates/golds/cpb-aacip-129-83xsjgjh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-8605qtdf.tsv create mode 100644 january-slates/golds/cpb-aacip-129-87pnw91c.tsv create mode 100644 january-slates/golds/cpb-aacip-129-89280vgh.tsv create mode 100644 january-slates/golds/cpb-aacip-129-91fj72nc.tsv create mode 100644 january-slates/golds/cpb-aacip-131-0000003w.tsv create mode 100644 january-slates/golds/cpb-aacip-131-00ns1s0n.tsv create mode 100644 january-slates/golds/cpb-aacip-131-00ns1s1c.tsv create mode 100644 january-slates/golds/cpb-aacip-131-010p2ntg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-01bk3jj8.tsv create mode 100644 january-slates/golds/cpb-aacip-131-01bk3jk0.tsv create mode 100644 january-slates/golds/cpb-aacip-131-021c5bgj.tsv create mode 100644 january-slates/golds/cpb-aacip-131-02c8676b.tsv create mode 100644 january-slates/golds/cpb-aacip-131-02c86772.tsv create mode 100644 january-slates/golds/cpb-aacip-131-032280xk.tsv create mode 100644 january-slates/golds/cpb-aacip-131-032280z9.tsv create mode 100644 january-slates/golds/cpb-aacip-131-03cz8wvg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-03cz8ww6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-03cz8wxx.tsv create mode 100644 january-slates/golds/cpb-aacip-131-06sxktcx.tsv create mode 100644 january-slates/golds/cpb-aacip-131-06sxktdn.tsv create mode 100644 january-slates/golds/cpb-aacip-131-06sxktfc.tsv create mode 100644 january-slates/golds/cpb-aacip-131-08v9s5g1.tsv create mode 100644 january-slates/golds/cpb-aacip-131-0966t2hw.tsv create mode 100644 january-slates/golds/cpb-aacip-131-11kh19k7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-11kh19mz.tsv create mode 100644 january-slates/golds/cpb-aacip-131-11xd2691.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12893358.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12m6403d.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12m64044.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12z34w2m.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12z34w3b.tsv create mode 100644 january-slates/golds/cpb-aacip-131-12z34w42.tsv create mode 100644 january-slates/golds/cpb-aacip-131-13mw6nqt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-150gb6zn.tsv create mode 100644 january-slates/golds/cpb-aacip-131-1615dwph.tsv create mode 100644 january-slates/golds/cpb-aacip-131-16pzgphg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-16pzgpj6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-16pzgpkx.tsv create mode 100644 january-slates/golds/cpb-aacip-131-18rbp1gp.tsv create mode 100644 january-slates/golds/cpb-aacip-131-18rbp1hd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-19f4qtck.tsv create mode 100644 january-slates/golds/cpb-aacip-131-19f4qtd9.tsv create mode 100644 january-slates/golds/cpb-aacip-131-19s1rq6j.tsv create mode 100644 january-slates/golds/cpb-aacip-131-203xsm4n.tsv create mode 100644 january-slates/golds/cpb-aacip-131-20fttgwg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-20fttgx6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-20sqvcqf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-214mw8h7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-22h70v81.tsv create mode 100644 january-slates/golds/cpb-aacip-131-22v41qzd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-24wh7377.tsv create mode 100644 january-slates/golds/cpb-aacip-131-25x69rnw.tsv create mode 100644 january-slates/golds/cpb-aacip-131-2683bnjv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-2683bnkk.tsv create mode 100644 january-slates/golds/cpb-aacip-131-278sfb1q.tsv create mode 100644 january-slates/golds/cpb-aacip-131-27mpg719.tsv create mode 100644 january-slates/golds/cpb-aacip-131-28ncjwhd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-29b5mpdz.tsv create mode 100644 january-slates/golds/cpb-aacip-131-29b5mpfp.tsv create mode 100644 january-slates/golds/cpb-aacip-131-30bvqbxv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-30prr7rt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-311ns4m2.tsv create mode 100644 january-slates/golds/cpb-aacip-131-311ns4ns.tsv create mode 100644 january-slates/golds/cpb-aacip-131-31cjt1mn.tsv create mode 100644 january-slates/golds/cpb-aacip-131-32d7wq3f.tsv create mode 100644 january-slates/golds/cpb-aacip-131-32d7wq45.tsv create mode 100644 january-slates/golds/cpb-aacip-131-33dz0cpd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-33dz0cq4.tsv create mode 100644 january-slates/golds/cpb-aacip-131-33dz0crv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-343r25bw.tsv create mode 100644 january-slates/golds/cpb-aacip-131-34sj3z42.tsv create mode 100644 january-slates/golds/cpb-aacip-131-34sj3z5s.tsv create mode 100644 january-slates/golds/cpb-aacip-131-35t76mk3.tsv create mode 100644 january-slates/golds/cpb-aacip-131-375tb64j.tsv create mode 100644 january-slates/golds/cpb-aacip-131-38w9gndg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-3976hj9f.tsv create mode 100644 january-slates/golds/cpb-aacip-131-40xpp0pm.tsv create mode 100644 january-slates/golds/cpb-aacip-131-40xpp0qb.tsv create mode 100644 january-slates/golds/cpb-aacip-131-41mgqsfm.tsv create mode 100644 january-slates/golds/cpb-aacip-131-4298sk0x.tsv create mode 100644 january-slates/golds/cpb-aacip-131-439zw7nq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-44bnzx7p.tsv create mode 100644 january-slates/golds/cpb-aacip-131-44pk0t0t.tsv create mode 100644 january-slates/golds/cpb-aacip-131-45q83gmg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-45q83gn6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-46254cmm.tsv create mode 100644 january-slates/golds/cpb-aacip-131-46d258bd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-46qz653b.tsv create mode 100644 january-slates/golds/cpb-aacip-131-472v7246.tsv create mode 100644 january-slates/golds/cpb-aacip-131-47dr7xzt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-48ffbmhq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-48sbchfv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-48sbchgk.tsv create mode 100644 january-slates/golds/cpb-aacip-131-48sbchh9.tsv create mode 100644 january-slates/golds/cpb-aacip-131-48sbchj1.tsv create mode 100644 january-slates/golds/cpb-aacip-131-4947ddbt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-4947ddcj.tsv create mode 100644 january-slates/golds/cpb-aacip-131-4947ddd8.tsv create mode 100644 january-slates/golds/cpb-aacip-131-4947ddf0.tsv create mode 100644 january-slates/golds/cpb-aacip-131-49g4f942.tsv create mode 100644 january-slates/golds/cpb-aacip-131-49g4f95s.tsv create mode 100644 january-slates/golds/cpb-aacip-131-504xh2wf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-50gthzrg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-50tqjvkf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-51hhmnct.tsv create mode 100644 january-slates/golds/cpb-aacip-131-5269pf21.tsv create mode 100644 january-slates/golds/cpb-aacip-131-5370s3kh.tsv create mode 100644 january-slates/golds/cpb-aacip-131-53jwt0gb.tsv create mode 100644 january-slates/golds/cpb-aacip-131-53jwt0h2.tsv create mode 100644 january-slates/golds/cpb-aacip-131-53jwt0js.tsv create mode 100644 january-slates/golds/cpb-aacip-131-54kkwp29.tsv create mode 100644 january-slates/golds/cpb-aacip-131-54xgxk15.tsv create mode 100644 january-slates/golds/cpb-aacip-131-55m90bv6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-569324f7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-569324gz.tsv create mode 100644 january-slates/golds/cpb-aacip-131-56n031d3.tsv create mode 100644 january-slates/golds/cpb-aacip-131-56n031ft.tsv create mode 100644 january-slates/golds/cpb-aacip-131-58bg7grf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-58pc8cg7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-59q2c22v.tsv create mode 100644 january-slates/golds/cpb-aacip-131-59q2c23k.tsv create mode 100644 january-slates/golds/cpb-aacip-131-612ngmjh.tsv create mode 100644 january-slates/golds/cpb-aacip-131-612ngmk7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-61djhh89.tsv create mode 100644 january-slates/golds/cpb-aacip-131-61rfjd9m.tsv create mode 100644 january-slates/golds/cpb-aacip-131-623bk95v.tsv create mode 100644 january-slates/golds/cpb-aacip-131-623bk96k.tsv create mode 100644 january-slates/golds/cpb-aacip-131-6341nzsv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-64thtf1t.tsv create mode 100644 january-slates/golds/cpb-aacip-131-65h9w6jq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-68kd57gw.tsv create mode 100644 january-slates/golds/cpb-aacip-131-68kd57hm.tsv create mode 100644 january-slates/golds/cpb-aacip-131-6986713n.tsv create mode 100644 january-slates/golds/cpb-aacip-131-69z08svd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-69z08sw4.tsv create mode 100644 january-slates/golds/cpb-aacip-131-719kdcc4.tsv create mode 100644 january-slates/golds/cpb-aacip-131-720cg52b.tsv create mode 100644 january-slates/golds/cpb-aacip-131-720cg532.tsv create mode 100644 january-slates/golds/cpb-aacip-131-720cg54s.tsv create mode 100644 january-slates/golds/cpb-aacip-131-72b8h1wm.tsv create mode 100644 january-slates/golds/cpb-aacip-131-72b8h1xb.tsv create mode 100644 january-slates/golds/cpb-aacip-131-7312jthq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-7312jtjf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-7312jtk5.tsv create mode 100644 january-slates/golds/cpb-aacip-131-7312jtmw.tsv create mode 100644 january-slates/golds/cpb-aacip-131-73bzkqhq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-75r7szf4.tsv create mode 100644 january-slates/golds/cpb-aacip-131-75r7szgv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-773txj7n.tsv create mode 100644 january-slates/golds/cpb-aacip-131-805x6js5.tsv create mode 100644 january-slates/golds/cpb-aacip-131-80vq8bgt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-81jhb4bn.tsv create mode 100644 january-slates/golds/cpb-aacip-131-82k6dstr.tsv create mode 100644 january-slates/golds/cpb-aacip-131-82k6dsvg.tsv create mode 100644 january-slates/golds/cpb-aacip-131-82k6dsw6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-82x3fpnq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-82x3fppf.tsv create mode 100644 january-slates/golds/cpb-aacip-131-848pk81j.tsv create mode 100644 january-slates/golds/cpb-aacip-131-848pk828.tsv create mode 100644 january-slates/golds/cpb-aacip-131-85n8ptfs.tsv create mode 100644 january-slates/golds/cpb-aacip-131-8605qqd6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-86b2rm75.tsv create mode 100644 january-slates/golds/cpb-aacip-131-86b2rm8w.tsv create mode 100644 january-slates/golds/cpb-aacip-131-86nzsh6f.tsv create mode 100644 january-slates/golds/cpb-aacip-131-86nzsh75.tsv create mode 100644 january-slates/golds/cpb-aacip-131-87brv8th.tsv create mode 100644 january-slates/golds/cpb-aacip-131-87brv8v7.tsv create mode 100644 january-slates/golds/cpb-aacip-131-87brv8wz.tsv create mode 100644 january-slates/golds/cpb-aacip-131-87pnw5p6.tsv create mode 100644 january-slates/golds/cpb-aacip-131-88qbzv7f.tsv create mode 100644 january-slates/golds/cpb-aacip-131-89280r2k.tsv create mode 100644 january-slates/golds/cpb-aacip-131-89280r39.tsv create mode 100644 january-slates/golds/cpb-aacip-131-89r22hvq.tsv create mode 100644 january-slates/golds/cpb-aacip-131-902z3dtj.tsv create mode 100644 january-slates/golds/cpb-aacip-131-91fj709k.tsv create mode 100644 january-slates/golds/cpb-aacip-131-91fj70b9.tsv create mode 100644 january-slates/golds/cpb-aacip-131-91fj70c1.tsv create mode 100644 january-slates/golds/cpb-aacip-131-91sf7w4w.tsv create mode 100644 january-slates/golds/cpb-aacip-131-924b8rtt.tsv create mode 100644 january-slates/golds/cpb-aacip-131-92g79nwv.tsv create mode 100644 january-slates/golds/cpb-aacip-131-9351cfms.tsv create mode 100644 january-slates/golds/cpb-aacip-131-9351cfnh.tsv create mode 100644 january-slates/golds/cpb-aacip-131-945qg46t.tsv create mode 100644 january-slates/golds/cpb-aacip-131-95j9kpkb.tsv create mode 100644 january-slates/golds/cpb-aacip-131-9673ng7t.tsv create mode 100644 january-slates/golds/cpb-aacip-131-988gttbp.tsv create mode 100644 january-slates/golds/cpb-aacip-131-988gttcd.tsv create mode 100644 january-slates/golds/cpb-aacip-131-988gttd4.tsv create mode 100644 january-slates/golds/cpb-aacip-131-98z8wm7p.tsv create mode 100644 january-slates/golds/cpb-aacip-131-9995xh0r.tsv create mode 100644 january-slates/golds/cpb-aacip-131-9995xh1g.tsv create mode 100644 january-slates/golds/cpb-aacip-153-000002z3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-009w0wcr.tsv create mode 100644 january-slates/golds/cpb-aacip-153-032281kr.tsv create mode 100644 january-slates/golds/cpb-aacip-153-03cz8xgx.tsv create mode 100644 january-slates/golds/cpb-aacip-153-042rbpt6.tsv create mode 100644 january-slates/golds/cpb-aacip-153-04dnckw7.tsv create mode 100644 january-slates/golds/cpb-aacip-153-05s7h55x.tsv create mode 100644 january-slates/golds/cpb-aacip-153-07gqnmcc.tsv create mode 100644 january-slates/golds/cpb-aacip-153-07gqnmd3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-085hqddt.tsv create mode 100644 january-slates/golds/cpb-aacip-153-09j3tzvs.tsv create mode 100644 january-slates/golds/cpb-aacip-153-106wwrgz.tsv create mode 100644 january-slates/golds/cpb-aacip-153-117m0f63.tsv create mode 100644 january-slates/golds/cpb-aacip-153-128933r9.tsv create mode 100644 january-slates/golds/cpb-aacip-153-128933s1.tsv create mode 100644 january-slates/golds/cpb-aacip-153-14nk9bs9.tsv create mode 100644 january-slates/golds/cpb-aacip-153-16c2fszm.tsv create mode 100644 january-slates/golds/cpb-aacip-153-16c2ft2g.tsv create mode 100644 january-slates/golds/cpb-aacip-153-16pzgptq.tsv create mode 100644 january-slates/golds/cpb-aacip-153-17qnkc3t.tsv create mode 100644 january-slates/golds/cpb-aacip-153-19f4qtn3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-19f4qtr8.tsv create mode 100644 january-slates/golds/cpb-aacip-153-20sqvf3h.tsv create mode 100644 january-slates/golds/cpb-aacip-153-21ghx5sb.tsv create mode 100644 january-slates/golds/cpb-aacip-153-22h70vg3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-22h70vht.tsv create mode 100644 january-slates/golds/cpb-aacip-153-23612n24.tsv create mode 100644 january-slates/golds/cpb-aacip-153-23hx3hwt.tsv create mode 100644 january-slates/golds/cpb-aacip-153-246q59t3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-257d80kb.tsv create mode 100644 january-slates/golds/cpb-aacip-153-25x69s18.tsv create mode 100644 january-slates/golds/cpb-aacip-153-26m0cjqs.tsv create mode 100644 january-slates/golds/cpb-aacip-153-26xwdfzv.tsv create mode 100644 january-slates/golds/cpb-aacip-153-278sfbrn.tsv create mode 100644 january-slates/golds/cpb-aacip-153-28ncjx34.tsv create mode 100644 january-slates/golds/cpb-aacip-153-28ncjx8r.tsv create mode 100644 january-slates/golds/cpb-aacip-153-29b5mpnr.tsv create mode 100644 january-slates/golds/cpb-aacip-153-300zpjd6.tsv create mode 100644 january-slates/golds/cpb-aacip-153-30prr83g.tsv create mode 100644 january-slates/golds/cpb-aacip-153-311ns4vv.tsv create mode 100644 january-slates/golds/cpb-aacip-153-311ns4wk.tsv create mode 100644 january-slates/golds/cpb-aacip-153-311ns5s3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-31cjt1tq.tsv create mode 100644 january-slates/golds/cpb-aacip-153-31cjt1zm.tsv create mode 100644 january-slates/golds/cpb-aacip-153-31qftxvc.tsv create mode 100644 january-slates/golds/cpb-aacip-153-322bvtrb.tsv create mode 100644 january-slates/golds/cpb-aacip-153-32d7wqdp.tsv create mode 100644 january-slates/golds/cpb-aacip-153-33dz0d3h.tsv create mode 100644 january-slates/golds/cpb-aacip-153-33dz0d5z.tsv create mode 100644 january-slates/golds/cpb-aacip-153-33dz0d6p.tsv create mode 100644 january-slates/golds/cpb-aacip-153-33rv190x.tsv create mode 100644 january-slates/golds/cpb-aacip-153-34fn32g3.tsv create mode 100644 january-slates/golds/cpb-aacip-153-35gb5rhg.tsv create mode 100644 january-slates/golds/cpb-aacip-153-36547j47.tsv create mode 100644 january-slates/golds/cpb-aacip-153-375tb6kp.tsv create mode 100644 january-slates/golds/cpb-aacip-153-386hdw5n.tsv create mode 100644 january-slates/golds/cpb-aacip-153-386hdw6c.tsv create mode 100644 january-slates/golds/cpb-aacip-153-386hdz86.tsv create mode 100644 january-slates/golds/cpb-aacip-153-38jdfrt9.tsv create mode 100644 january-slates/golds/cpb-aacip-153-38w9gntw.tsv create mode 100644 january-slates/golds/cpb-aacip-153-38w9gnx2.tsv create mode 100644 january-slates/golds/cpb-aacip-153-40ksn45k.tsv create mode 100644 january-slates/golds/cpb-aacip-153-4298skkz.tsv create mode 100644 january-slates/golds/cpb-aacip-153-42n5tg81.tsv create mode 100644 january-slates/golds/cpb-aacip-153-42n5tg9r.tsv create mode 100644 january-slates/golds/cpb-aacip-153-42n5tgbg.tsv create mode 100644 january-slates/golds/cpb-aacip-153-44bnzxr8.tsv create mode 100644 january-slates/golds/cpb-aacip-153-44bnzxs0.tsv create mode 100644 january-slates/golds/cpb-aacip-153-46254cw4.tsv create mode 100644 january-slates/golds/cpb-aacip-153-472v72b8.tsv create mode 100644 january-slates/golds/cpb-aacip-153-48ffbpfc.tsv create mode 100644 january-slates/golds/cpb-aacip-153-48sbchpn.tsv create mode 100644 january-slates/golds/cpb-aacip-189-01pg4fmz.tsv create mode 100644 january-slates/golds/cpb-aacip-189-042rbpjb.tsv create mode 100644 january-slates/golds/cpb-aacip-189-07tmph2c.tsv create mode 100644 january-slates/golds/cpb-aacip-189-08v9s5rg.tsv create mode 100644 january-slates/golds/cpb-aacip-189-09w0vv3c.tsv create mode 100644 january-slates/golds/cpb-aacip-189-12m64032.tsv create mode 100644 january-slates/golds/cpb-aacip-189-13zs7jf8.tsv create mode 100644 january-slates/golds/cpb-aacip-189-20sqvcwq.tsv create mode 100644 january-slates/golds/cpb-aacip-189-27zkh41j.tsv create mode 100644 january-slates/golds/cpb-aacip-189-2908kskn.tsv create mode 100644 january-slates/golds/cpb-aacip-189-29b5mpdm.tsv create mode 100644 january-slates/golds/cpb-aacip-189-31qftxfm.tsv create mode 100644 january-slates/golds/cpb-aacip-189-36tx995s.tsv create mode 100644 january-slates/golds/cpb-aacip-189-38jdfrnm.tsv create mode 100644 january-slates/golds/cpb-aacip-189-38jdfrpb.tsv create mode 100644 january-slates/golds/cpb-aacip-189-39x0kb26.tsv create mode 100644 january-slates/golds/cpb-aacip-189-4298sk0k.tsv create mode 100644 january-slates/golds/cpb-aacip-189-4298sk19.tsv create mode 100644 january-slates/golds/cpb-aacip-189-53jwt0jf.tsv create mode 100644 january-slates/golds/cpb-aacip-189-55z617r8.tsv create mode 100644 january-slates/golds/cpb-aacip-189-580k6krh.tsv create mode 100644 january-slates/golds/cpb-aacip-189-59c5b54c.tsv create mode 100644 january-slates/golds/cpb-aacip-189-60qrfqqn.tsv create mode 100644 january-slates/golds/cpb-aacip-189-63fxpvk5.tsv create mode 100644 january-slates/golds/cpb-aacip-189-63fxpvmw.tsv create mode 100644 january-slates/golds/cpb-aacip-189-65h9w6k3.tsv create mode 100644 january-slates/golds/cpb-aacip-189-67jq2jzc.tsv create mode 100644 january-slates/golds/cpb-aacip-189-68kd57j0.tsv create mode 100644 january-slates/golds/cpb-aacip-189-72p5hxzn.tsv create mode 100644 january-slates/golds/cpb-aacip-189-741rnh6k.tsv create mode 100644 january-slates/golds/cpb-aacip-189-784j16mh.tsv create mode 100644 january-slates/golds/cpb-aacip-189-784j16n7.tsv create mode 100644 january-slates/golds/cpb-aacip-189-80ht7fms.tsv create mode 100644 january-slates/golds/cpb-aacip-189-80vq8bgg.tsv create mode 100644 january-slates/golds/cpb-aacip-189-84zgn223.tsv create mode 100644 january-slates/golds/cpb-aacip-189-86b2rmdf.tsv create mode 100644 january-slates/golds/cpb-aacip-189-91fj707s.tsv create mode 100644 january-slates/golds/cpb-aacip-189-92t4bjtn.tsv create mode 100644 january-slates/golds/cpb-aacip-189-93ttf74w.tsv create mode 100644 january-slates/golds/cpb-aacip-200-074tmrfw.tsv create mode 100644 january-slates/golds/cpb-aacip-200-1937pzw7.tsv create mode 100644 january-slates/golds/cpb-aacip-200-225b008g.tsv create mode 100644 january-slates/golds/cpb-aacip-200-27zkh4b3.tsv create mode 100644 january-slates/golds/cpb-aacip-200-31qftz5j.tsv create mode 100644 january-slates/golds/cpb-aacip-200-31qftz68.tsv create mode 100644 january-slates/golds/cpb-aacip-200-34fn338d.tsv create mode 100644 january-slates/golds/cpb-aacip-200-36547jkm.tsv create mode 100644 january-slates/golds/cpb-aacip-200-36tx9bnn.tsv create mode 100644 january-slates/golds/cpb-aacip-200-375tb736.tsv create mode 100644 january-slates/golds/cpb-aacip-200-386hdx1d.tsv create mode 100644 january-slates/golds/cpb-aacip-200-43nvx5rv.tsv create mode 100644 january-slates/golds/cpb-aacip-200-5269pg71.tsv create mode 100644 january-slates/golds/cpb-aacip-200-558czgn1.tsv create mode 100644 january-slates/golds/cpb-aacip-200-58bg7hk6.tsv create mode 100644 january-slates/golds/cpb-aacip-200-58bg7hmx.tsv create mode 100644 january-slates/golds/cpb-aacip-200-64thtfsf.tsv create mode 100644 january-slates/golds/cpb-aacip-200-67jq2kz3.tsv create mode 100644 january-slates/golds/cpb-aacip-200-708w9qpq.tsv create mode 100644 january-slates/golds/cpb-aacip-200-7312jvbg.tsv create mode 100644 january-slates/golds/cpb-aacip-200-74cnpf7m.tsv create mode 100644 january-slates/golds/cpb-aacip-200-805x6m6x.tsv create mode 100644 january-slates/golds/cpb-aacip-200-84zgn2vs.tsv create mode 100644 january-slates/golds/cpb-aacip-200-86nzsjgm.tsv create mode 100644 january-slates/golds/cpb-aacip-200-881jx3pq.tsv create mode 100644 january-slates/golds/cpb-aacip-200-902z3ftx.tsv create mode 100644 january-slates/golds/cpb-aacip-200-90dv4br2.tsv create mode 100644 january-slates/golds/cpb-aacip-200-92g79pn5.tsv create mode 100644 january-slates/golds/cpb-aacip-200-945qg5jf.tsv create mode 100644 january-slates/golds/cpb-aacip-200-96wwq9p6.tsv create mode 100644 january-slates/golds/cpb-aacip-235-042rcjzf.tsv create mode 100644 january-slates/golds/cpb-aacip-235-15bcd0gv.tsv create mode 100644 january-slates/golds/cpb-aacip-235-18dfp1rn.tsv create mode 100644 january-slates/golds/cpb-aacip-235-19f4rq7f.tsv create mode 100644 january-slates/golds/cpb-aacip-235-20ftvbhk.tsv create mode 100644 january-slates/golds/cpb-aacip-235-36548ck9.tsv create mode 100644 january-slates/golds/cpb-aacip-235-42n5v9dk.tsv create mode 100644 january-slates/golds/cpb-aacip-235-47rn9r0k.tsv create mode 100644 january-slates/golds/cpb-aacip-235-49t1h18x.tsv create mode 100644 january-slates/golds/cpb-aacip-235-5370swqf.tsv create mode 100644 january-slates/golds/cpb-aacip-235-580k7dqh.tsv create mode 100644 january-slates/golds/cpb-aacip-235-67wm48rb.tsv create mode 100644 january-slates/golds/cpb-aacip-235-69z09p02.tsv create mode 100644 january-slates/golds/cpb-aacip-235-86b2sgc4.tsv create mode 100644 january-slates/golds/cpb-aacip-235-92g7bgts.tsv create mode 100644 january-slates/golds/cpb-aacip-235-92g7bgvh.tsv create mode 100644 january-slates/golds/cpb-aacip-235-988gvq43.tsv create mode 100644 january-slates/golds/cpb-aacip-29-01pg4g2x.tsv create mode 100644 january-slates/golds/cpb-aacip-29-08v9s6dt.tsv create mode 100644 january-slates/golds/cpb-aacip-29-106wwrfp.tsv create mode 100644 january-slates/golds/cpb-aacip-29-117m0f2f.tsv create mode 100644 january-slates/golds/cpb-aacip-29-11xd270w.tsv create mode 100644 january-slates/golds/cpb-aacip-29-15bcc4sg.tsv create mode 100644 january-slates/golds/cpb-aacip-29-22v41r8t.tsv create mode 100644 january-slates/golds/cpb-aacip-29-24wh73nq.tsv create mode 100644 january-slates/golds/cpb-aacip-29-29p2nkpp.tsv create mode 100644 january-slates/golds/cpb-aacip-29-35t76n4f.tsv create mode 100644 january-slates/golds/cpb-aacip-29-3976hk2f.tsv create mode 100644 january-slates/golds/cpb-aacip-29-41mgqtx3.tsv create mode 100644 january-slates/golds/cpb-aacip-29-440rz2bm.tsv create mode 100644 january-slates/golds/cpb-aacip-29-46254dmz.tsv create mode 100644 january-slates/golds/cpb-aacip-29-48ffbnfm.tsv create mode 100644 january-slates/golds/cpb-aacip-29-4947dfbw.tsv create mode 100644 january-slates/golds/cpb-aacip-29-49g4f9wp.tsv create mode 100644 january-slates/golds/cpb-aacip-29-50tqjw98.tsv create mode 100644 january-slates/golds/cpb-aacip-29-515mks96.tsv create mode 100644 january-slates/golds/cpb-aacip-29-5269pfn6.tsv create mode 100644 january-slates/golds/cpb-aacip-29-57np5qmn.tsv create mode 100644 january-slates/golds/cpb-aacip-29-61rfjdxq.tsv create mode 100644 january-slates/golds/cpb-aacip-29-66j0zx33.tsv create mode 100644 january-slates/golds/cpb-aacip-29-66vx0sr0.tsv create mode 100644 january-slates/golds/cpb-aacip-29-687h4cjj.tsv create mode 100644 january-slates/golds/cpb-aacip-29-68kd58pq.tsv create mode 100644 january-slates/golds/cpb-aacip-29-7312jv8m.tsv create mode 100644 january-slates/golds/cpb-aacip-29-7634tw3m.tsv create mode 100644 january-slates/golds/cpb-aacip-29-773txjgr.tsv create mode 100644 january-slates/golds/cpb-aacip-29-784j17c1.tsv create mode 100644 january-slates/golds/cpb-aacip-29-78tb30x7.tsv create mode 100644 january-slates/golds/cpb-aacip-29-84mkm5rk.tsv create mode 100644 january-slates/golds/cpb-aacip-29-86nzshb0.tsv create mode 100644 january-slates/golds/cpb-aacip-29-89280s5z.tsv create mode 100644 january-slates/golds/cpb-aacip-29-902z3fdn.tsv create mode 100644 january-slates/golds/cpb-aacip-29-95w6mm5b.tsv create mode 100644 january-slates/golds/cpb-aacip-29-95w6mmcg.tsv create mode 100644 january-slates/golds/cpb-aacip-29-97kps24j.tsv create mode 100644 january-slates/golds/cpb-aacip-29-9995xhq3.tsv create mode 100644 january-slates/golds/cpb-aacip-293-03qv9sz0.tsv create mode 100644 january-slates/golds/cpb-aacip-293-0966t2q0.tsv create mode 100644 january-slates/golds/cpb-aacip-293-10jsxngk.tsv create mode 100644 january-slates/golds/cpb-aacip-293-13905s74.tsv create mode 100644 january-slates/golds/cpb-aacip-293-30prr83h.tsv create mode 100644 january-slates/golds/cpb-aacip-293-31cjt22h.tsv create mode 100644 january-slates/golds/cpb-aacip-293-3331zh63.tsv create mode 100644 january-slates/golds/cpb-aacip-293-34sj3xzh.tsv create mode 100644 january-slates/golds/cpb-aacip-293-38w9gntx.tsv create mode 100644 january-slates/golds/cpb-aacip-293-472v72kc.tsv create mode 100644 january-slates/golds/cpb-aacip-293-60cvdv8f.tsv create mode 100644 january-slates/golds/cpb-aacip-293-68kd582n.tsv create mode 100644 january-slates/golds/cpb-aacip-293-741rnhtq.tsv create mode 100644 january-slates/golds/cpb-aacip-293-848pk8hf.tsv create mode 100644 january-slates/golds/cpb-aacip-322-03cz8wl6.tsv create mode 100644 january-slates/golds/cpb-aacip-322-04rjdg2h.tsv create mode 100644 january-slates/golds/cpb-aacip-322-074tmqt8.tsv create mode 100644 january-slates/golds/cpb-aacip-322-11xd26h5.tsv create mode 100644 january-slates/golds/cpb-aacip-322-13lw6ngj.tsv create mode 100644 january-slates/golds/cpb-aacip-322-24jm66h7.tsv create mode 100644 january-slates/golds/cpb-aacip-322-28ncjx9j.tsv create mode 100644 january-slates/golds/cpb-aacip-322-29b5mp4z.tsv create mode 100644 january-slates/golds/cpb-aacip-322-29b5mp5p.tsv create mode 100644 january-slates/golds/cpb-aacip-322-29b5mpzb.tsv create mode 100644 january-slates/golds/cpb-aacip-322-300zpfvm.tsv create mode 100644 january-slates/golds/cpb-aacip-322-31qftx5z.tsv create mode 100644 january-slates/golds/cpb-aacip-322-31qftx7d.tsv create mode 100644 january-slates/golds/cpb-aacip-322-3331zgm4.tsv create mode 100644 january-slates/golds/cpb-aacip-322-3331zh3z.tsv create mode 100644 january-slates/golds/cpb-aacip-322-343r25h9.tsv create mode 100644 january-slates/golds/cpb-aacip-322-36tx99km.tsv create mode 100644 january-slates/golds/cpb-aacip-322-3976hjwj.tsv create mode 100644 january-slates/golds/cpb-aacip-322-3976hjz0.tsv create mode 100644 january-slates/golds/cpb-aacip-322-43nvx4bk.tsv create mode 100644 january-slates/golds/cpb-aacip-322-48ffbldb.tsv create mode 100644 january-slates/golds/cpb-aacip-322-52w3r6lw.tsv create mode 100644 january-slates/golds/cpb-aacip-322-55l90bhr.tsv create mode 100644 january-slates/golds/cpb-aacip-322-55m90c8c.tsv create mode 100644 january-slates/golds/cpb-aacip-322-569324rj.tsv create mode 100644 january-slates/golds/cpb-aacip-322-61rfjd1l.tsv create mode 100644 january-slates/golds/cpb-aacip-322-61rfjd9d.tsv create mode 100644 january-slates/golds/cpb-aacip-322-62s4n2mj.tsv create mode 100644 january-slates/golds/cpb-aacip-322-62s4n3bf.tsv create mode 100644 january-slates/golds/cpb-aacip-322-65h9w7mn.tsv create mode 100644 january-slates/golds/cpb-aacip-322-720cg4wt.tsv create mode 100644 january-slates/golds/cpb-aacip-322-72b8h1rh.tsv create mode 100644 january-slates/golds/cpb-aacip-322-73bzkqbw.tsv create mode 100644 january-slates/golds/cpb-aacip-322-7634tvj7.tsv create mode 100644 january-slates/golds/cpb-aacip-322-76f1vrn0.tsv create mode 100644 january-slates/golds/cpb-aacip-322-784j1746.tsv create mode 100644 january-slates/golds/cpb-aacip-322-78gf23pp.tsv create mode 100644 january-slates/golds/cpb-aacip-322-83kwhg7z.tsv create mode 100644 january-slates/golds/cpb-aacip-322-83kwhg8p.tsv create mode 100644 january-slates/golds/cpb-aacip-322-83xsjcn7.tsv create mode 100644 january-slates/golds/cpb-aacip-322-89d51ncg.tsv create mode 100644 january-slates/golds/cpb-aacip-322-924b8scw.tsv create mode 100644 january-slates/golds/cpb-aacip-322-92t4bjgj.tsv create mode 100644 january-slates/golds/cpb-aacip-322-93ttf72k.tsv create mode 100644 january-slates/golds/cpb-aacip-322-95w6mkvh.tsv create mode 100644 january-slates/golds/cpb-aacip-322-9673ng3q.tsv create mode 100644 january-slates/golds/cpb-aacip-322-98mcvqxc.tsv create mode 100644 january-slates/golds/cpb-aacip-394-0322868j.tsv create mode 100644 january-slates/golds/cpb-aacip-394-150gbd75.tsv create mode 100644 january-slates/golds/cpb-aacip-394-16pzgvnd.tsv create mode 100644 january-slates/golds/cpb-aacip-394-20sqvk0z.tsv create mode 100644 january-slates/golds/cpb-aacip-394-25k99270.tsv create mode 100644 january-slates/golds/cpb-aacip-394-28nck2pq.tsv create mode 100644 january-slates/golds/cpb-aacip-394-30prrfj6.tsv create mode 100644 january-slates/golds/cpb-aacip-394-34sj440v.tsv create mode 100644 january-slates/golds/cpb-aacip-394-35t76v43.tsv create mode 100644 january-slates/golds/cpb-aacip-394-37hqc8bh.tsv create mode 100644 january-slates/golds/cpb-aacip-394-44pk10gn.tsv create mode 100644 january-slates/golds/cpb-aacip-394-57np5x9q.tsv create mode 100644 january-slates/golds/cpb-aacip-394-59189f7b.tsv create mode 100644 january-slates/golds/cpb-aacip-394-601zd3mb.tsv create mode 100644 january-slates/golds/cpb-aacip-394-63fxq1nn.tsv create mode 100644 january-slates/golds/cpb-aacip-394-8605qwd7.tsv create mode 100644 january-slates/golds/cpb-aacip-394-881jx8bt.tsv create mode 100644 january-slates/golds/cpb-aacip-394-94hmh6pk.tsv create mode 100644 january-slates/golds/cpb-aacip-394-9995xntg.tsv create mode 100644 january-slates/golds/cpb-aacip-41-009w13fb.tsv create mode 100644 january-slates/golds/cpb-aacip-41-074tmwc8.tsv create mode 100644 january-slates/golds/cpb-aacip-41-10wpzpt5.tsv create mode 100644 january-slates/golds/cpb-aacip-41-13zs7qh0.tsv create mode 100644 january-slates/golds/cpb-aacip-41-14nk9bkf.tsv create mode 100644 january-slates/golds/cpb-aacip-41-16pzgq2f.tsv create mode 100644 january-slates/golds/cpb-aacip-41-171vhkmr.tsv create mode 100644 january-slates/golds/cpb-aacip-41-17qnkc9c.tsv create mode 100644 january-slates/golds/cpb-aacip-41-214mwjjg.tsv create mode 100644 january-slates/golds/cpb-aacip-41-21ghx61z.tsv create mode 100644 january-slates/golds/cpb-aacip-41-21tdz99t.tsv create mode 100644 january-slates/golds/cpb-aacip-41-33dz0cwr.tsv create mode 100644 january-slates/golds/cpb-aacip-41-34fn32g7.tsv create mode 100644 january-slates/golds/cpb-aacip-41-35gb5r1d.tsv create mode 100644 january-slates/golds/cpb-aacip-41-39k3jfhm.tsv create mode 100644 january-slates/golds/cpb-aacip-41-48sbchtd.tsv create mode 100644 january-slates/golds/cpb-aacip-41-569324rv.tsv create mode 100644 january-slates/golds/cpb-aacip-41-579s4tcv.tsv create mode 100644 january-slates/golds/cpb-aacip-41-644qrngt.tsv create mode 100644 january-slates/golds/cpb-aacip-41-644qrnhh.tsv create mode 100644 january-slates/golds/cpb-aacip-41-655dvb4p.tsv create mode 100644 january-slates/golds/cpb-aacip-41-708w9q63.tsv create mode 100644 january-slates/golds/cpb-aacip-41-7634tvxz.tsv create mode 100644 january-slates/golds/cpb-aacip-41-78tb30hd.tsv create mode 100644 january-slates/golds/cpb-aacip-41-816m97tj.tsv create mode 100644 january-slates/golds/cpb-aacip-41-84mkm5br.tsv create mode 100644 january-slates/golds/cpb-aacip-81-032281c4.tsv create mode 100644 january-slates/golds/cpb-aacip-81-11xd26xt.tsv create mode 100644 january-slates/golds/cpb-aacip-81-19f4qtzt.tsv create mode 100644 january-slates/golds/cpb-aacip-81-23hx3j34.tsv create mode 100644 january-slates/golds/cpb-aacip-81-2683bnv7.tsv create mode 100644 january-slates/golds/cpb-aacip-81-30bvqccj.tsv create mode 100644 january-slates/golds/cpb-aacip-81-34fn32xq.tsv create mode 100644 january-slates/golds/cpb-aacip-81-37vmd08g.tsv create mode 100644 january-slates/golds/cpb-aacip-81-48sbchx0.tsv create mode 100644 january-slates/golds/cpb-aacip-81-49g4f9z1.tsv create mode 100644 january-slates/golds/cpb-aacip-81-49t1g6kv.tsv create mode 100644 january-slates/golds/cpb-aacip-81-558czgg5.tsv create mode 100644 january-slates/golds/cpb-aacip-81-65v6x4b5.tsv create mode 100644 january-slates/golds/cpb-aacip-81-708w9q47.tsv create mode 100644 january-slates/golds/cpb-aacip-81-74cnpdn4.tsv create mode 100644 january-slates/golds/cpb-aacip-81-74qjq9nj.tsv create mode 100644 january-slates/golds/cpb-aacip-81-881jx33t.tsv create mode 100644 january-slates/golds/cpb-aacip-81-902z3f9j.tsv create mode 100644 january-slates/golds/cpb-aacip-81-90dv4bd1.tsv create mode 100644 january-slates/golds/cpb-aacip-81-988gttr0.tsv delete mode 100644 january-slates/guidelines.md diff --git a/README.md b/README.md index 97d108bc..9e6f9c69 100644 --- a/README.md +++ b/README.md @@ -87,6 +87,8 @@ To ensure consistency between data consumption software, there are a few require In addition to the main code file, if the code requires additional dependencies/scripts, they can stay in the same level at that subdirectory. The dependencies information can be written down in the `README.md` file or in a machine-friendly file with the list of dependencies (e.g. `requirements.txt` for `pip`). +And finally, check the [conventions section](#repository-level-conventions) for the naming conventions for common field/column names for `golds` data. + #### Information README > [!IMPORTANT] > `README.md` (_and possibly `guidelines.{md,ppt}`_) @@ -117,9 +119,10 @@ This section should give sufficient documentation for how the annotation was don > `readme.md` & `guidelines.{md,ppt}` files are supposed to be actively maintained by the project manager. All guideline files are recommended to be version-controlled. ## Repository-level Conventions -### Conventions -> Please see the [Repository-level Conventions file](https://github.com/clamsproject/aapb-annotations/blob/main/repository_level_conventions.md) for standardizations, explanations and conventions. +> Please see the [Repository-level Conventions file](repository_level_conventions.md) for standardizations, explanations and conventions. + +### Time notation formats > [!IMPORTANT] > TL;DR > Media Time = `hh:mm:ss.mmm` with a **DOT** @@ -127,6 +130,12 @@ This section should give sufficient documentation for how the annotation was don > Some estimates of imprecision are given by Margin of Error. > Directionality definitions help frame the boundaries meant by annotated times. +### Field naming conventions for gold datasets +> [!IMPORTANT] +> TL;DR +> * `GUID` (all caps) - the AAPB id for that video e.g. "cpb-aacip-81-881jx33t". +> * For "anchor" columns (e.g., character offsets, time intervals, etc.) use `start`, `end` for the column names. + ## List of Current Projects/Subdirectories _This section is currently manually updated and may be incomplete. It contains information up to the readme's editing date._ * (`batches`) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003cx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003cx.tsv deleted file mode 100644 index 1343170a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003cx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-000003cx,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003dn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003dn.tsv deleted file mode 100644 index 274cbe52..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-000003dn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-000003dn,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w0zrj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w0zrj.tsv deleted file mode 100644 index 6e3e8ca9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w0zrj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-009w0zrj,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w108r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w108r.tsv deleted file mode 100644 index 52c4403d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w108r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-009w108r,North Carolina Now,00:00:05,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w109g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w109g.tsv deleted file mode 100644 index e49cf24f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-009w109g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-009w109g,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w7z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w7z.tsv deleted file mode 100644 index da4179be..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w7z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-00ns1w7z,North Carolina Now,00:00:05,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w8p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w8p.tsv deleted file mode 100644 index fa8b77e3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w8p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-00ns1w8p,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w9d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w9d.tsv deleted file mode 100644 index 4eb5b533..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-00ns1w9d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-00ns1w9d,North Carolina Now,00:00:06,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2rqj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2rqj.tsv deleted file mode 100644 index 82ba48ad..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2rqj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-010p2rqj,North Carolina Now,00:00:04,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s01.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s01.tsv deleted file mode 100644 index c68d52f9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s01.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-010p2s01,North Carolina Now,00:00:06,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s1r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s1r.tsv deleted file mode 100644 index ae4f2cd1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-010p2s1r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-010p2s1r,North Carolina Now,00:00:03,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3p94.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3p94.tsv deleted file mode 100644 index 6b0ecf11..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3p94.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01bk3p94,North Carolina Now,00:00:08,00:00:40,typed,digital,boxes to fill in,yes animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pbv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pbv.tsv deleted file mode 100644 index 837cba31..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pbv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01bk3pbv,North Carolina Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pck.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pck.tsv deleted file mode 100644 index e16378b4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pck.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01bk3pck,North Carolina Now,00:00:04,00:00:08,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pd9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pd9.tsv deleted file mode 100644 index 8ae05f63..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pd9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01bk3pd9,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pf1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pf1.tsv deleted file mode 100644 index 7c56aa10..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01bk3pf1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01bk3pf1,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jn8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jn8.tsv deleted file mode 100644 index 4a0f99ed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jn8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01pg4jn8,North Carolina Now,00:00:04,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jp0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jp0.tsv deleted file mode 100644 index ef76dc1e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-01pg4jp0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-01pg4jp0,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-021c5drw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-021c5drw.tsv deleted file mode 100644 index 9fd2dc37..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-021c5drw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-021c5drw,North Carolina Now,00:00:08,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b5v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b5v.tsv deleted file mode 100644 index fa7b9445..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b5v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86b5v,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b6k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b6k.tsv deleted file mode 100644 index 11f7be06..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b6k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86b6k,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b79.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b79.tsv deleted file mode 100644 index 793eda37..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86b79.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86b79,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bpq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bpq.tsv deleted file mode 100644 index 5ca99970..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bpq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86bpq,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bqf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bqf.tsv deleted file mode 100644 index c6a07b43..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bqf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86bqf,North Carolina Now,00:00:04,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86br5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86br5.tsv deleted file mode 100644 index 5d873a8d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86br5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86br5,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bsw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bsw.tsv deleted file mode 100644 index 27964755..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02c86bsw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02c86bsw,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q57728.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q57728.tsv deleted file mode 100644 index 6779f308..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q57728.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02q57728,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577f7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577f7.tsv deleted file mode 100644 index 435c99fe..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577f7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02q577f7,North Carolina Now,00:00:07,00:00:27,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577gz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577gz.tsv deleted file mode 100644 index cf07dcf5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-02q577gz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-02q577gz,North Carolina Now,00:00:05,00:00:29,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322848r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322848r.tsv deleted file mode 100644 index 0242e2bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322848r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0322848r,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322849g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322849g.tsv deleted file mode 100644 index 1c9ed562..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0322849g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0322849g,North Carolina Now,00:00:05,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284b6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284b6.tsv deleted file mode 100644 index 257ba908..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284b6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-032284b6,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284cx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284cx.tsv deleted file mode 100644 index b9cc1262..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284cx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-032284cx,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284dn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284dn.tsv deleted file mode 100644 index 46c92677..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284dn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-032284dn,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284fc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284fc.tsv deleted file mode 100644 index a447fc04..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-032284fc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-032284fc,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91m0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91m0.tsv deleted file mode 100644 index 4a3dbbf7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91m0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03cz91m0,North Carolina Now,00:00:04,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91nq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91nq.tsv deleted file mode 100644 index 2d03b3f5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91nq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03cz91nq,North Carolina Now,00:00:06,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91pf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91pf.tsv deleted file mode 100644 index ba7ca170..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03cz91pf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03cz91pf,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9w9q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9w9q.tsv deleted file mode 100644 index e1392b2d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9w9q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03qv9w9q,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wbf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wbf.tsv deleted file mode 100644 index af9226f8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wbf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03qv9wbf,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wc5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wc5.tsv deleted file mode 100644 index 990cc9e5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-03qv9wc5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-03qv9wc5,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs7d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs7d.tsv deleted file mode 100644 index 598644dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs7d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-042rbs7d,North Carolina Now,00:00:05;17,00:00:12;05,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs84.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs84.tsv deleted file mode 100644 index 950442dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbs84.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-042rbs84,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsvf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsvf.tsv deleted file mode 100644 index 66397059..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsvf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-042rbsvf,North Carolina Now,00:00:06,00:00:39,typed,digital,boxes to fill in,no features disappears from slate at 00:00:31 mark diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsw5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsw5.tsv deleted file mode 100644 index 02c7eef4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsw5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-042rbsw5,North Carolina Now,00:00:06,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsxw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsxw.tsv deleted file mode 100644 index 15e5c922..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-042rbsxw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-042rbsxw,North Carolina Now,00:00:06,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncnzh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncnzh.tsv deleted file mode 100644 index 75451bbc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncnzh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04dncnzh,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncpfb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncpfb.tsv deleted file mode 100644 index f39490be..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04dncpfb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04dncpfb,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk17.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk17.tsv deleted file mode 100644 index a004e378..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk17.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk17,North Carolina Now,00:00:23,00:00:54,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk2z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk2z.tsv deleted file mode 100644 index 2a6cd71d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk2z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk2z,North Carolina Now,00:00:03,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk3p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk3p.tsv deleted file mode 100644 index 23b69cc7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk3p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk3p,North Carolina Now,00:00:06,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk4d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk4d.tsv deleted file mode 100644 index 6aa02b10..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk4d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk4d,North Carolina Now,00:00:06,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk54.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk54.tsv deleted file mode 100644 index 66e2098d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk54.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk54,North Carolina Now,00:00:03,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk6v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk6v.tsv deleted file mode 100644 index db2d1486..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-04rjdk6v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-04rjdk6v,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgdb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgdb.tsv deleted file mode 100644 index b30d484b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgdb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-053ffgdb,North Carolina Now,00:00:05,00:00:27,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgrk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgrk.tsv deleted file mode 100644 index a0d72133..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgrk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-053ffgrk,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgs9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgs9.tsv deleted file mode 100644 index 05c5bd1c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgs9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-053ffgs9,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgt1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgt1.tsv deleted file mode 100644 index 2531708d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-053ffgt1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-053ffgt1,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgbzt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgbzt.tsv deleted file mode 100644 index d4435044..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgbzt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05fbgbzt,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcbg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcbg.tsv deleted file mode 100644 index f6369232..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcbg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05fbgcbg,North Carolina Now,00:00:05,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcc6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcc6.tsv deleted file mode 100644 index acc46187..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcc6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05fbgcc6,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcdx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcdx.tsv deleted file mode 100644 index 622219c8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05fbgcdx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05fbgcdx,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h80t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h80t.tsv deleted file mode 100644 index 5aefacf2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h80t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05s7h80t,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h81j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h81j.tsv deleted file mode 100644 index 2a0940e6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h81j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05s7h81j,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h828.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h828.tsv deleted file mode 100644 index 1e70aa19..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-05s7h828.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-05s7h828,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j42q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j42q.tsv deleted file mode 100644 index 52215666..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j42q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0644j42q,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j4kk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j4kk.tsv deleted file mode 100644 index b3719d70..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0644j4kk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0644j4kk,North Carolina Now,00:00:03,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k1vz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k1vz.tsv deleted file mode 100644 index e2013856..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k1vz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06g1k1vz,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k28b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k28b.tsv deleted file mode 100644 index a5caac56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k28b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06g1k28b,North Carolina Now,00:00:04,00:00:24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k292.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k292.tsv deleted file mode 100644 index c1f505ce..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k292.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06g1k292,North Carolina Now,00:00:07,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2bs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2bs.tsv deleted file mode 100644 index 3be1ff7f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2bs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06g1k2bs,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2ch.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2ch.tsv deleted file mode 100644 index 2bb1a98d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06g1k2ch.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06g1k2ch,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwx2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwx2.tsv deleted file mode 100644 index 9b9c8307..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwx2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkwx2,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwzs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwzs.tsv deleted file mode 100644 index 1d1073b4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkwzs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkwzs,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxdw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxdw.tsv deleted file mode 100644 index 18f5c918..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxdw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkxdw,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxfm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxfm.tsv deleted file mode 100644 index 09a55cdc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxfm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkxfm,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxgb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxgb.tsv deleted file mode 100644 index 3b278111..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxgb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkxgb,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,part of video featured for a few moments diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxh2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxh2.tsv deleted file mode 100644 index 264e926d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxh2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkxh2,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxjs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxjs.tsv deleted file mode 100644 index 0a26bf02..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-06sxkxjs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-06sxkxjs,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv5n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv5n.tsv deleted file mode 100644 index 3e1ab60a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv5n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmv5n,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv6c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv6c.tsv deleted file mode 100644 index b358d2d5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv6c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmv6c,North Carolina Now,00:00:02,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv73.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv73.tsv deleted file mode 100644 index 45d34175..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv73.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmv73,North Carolina Now,00:00:05,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv8t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv8t.tsv deleted file mode 100644 index fded3a85..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv8t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmv8t,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv9j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv9j.tsv deleted file mode 100644 index 89ceba16..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmv9j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmv9j,North Carolina Now,00:00:04,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvb8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvb8.tsv deleted file mode 100644 index 960187cf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvb8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmvb8,North Carolina Now,00:00:03,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvc0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvc0.tsv deleted file mode 100644 index 470ad991..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-074tmvc0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-074tmvc0,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr7p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr7p.tsv deleted file mode 100644 index 56114475..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr7p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07gqnr7p,North Carolina Now,00:00:08,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr8d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr8d.tsv deleted file mode 100644 index 2ebdcc2b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07gqnr8d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07gqnr8d,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmmj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmmj.tsv deleted file mode 100644 index a8a057d0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmmj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07tmpmmj,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmn8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmn8.tsv deleted file mode 100644 index d91b7a93..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmn8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07tmpmn8,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmp0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmp0.tsv deleted file mode 100644 index 493ad4f0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmp0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07tmpmp0,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmqq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmqq.tsv deleted file mode 100644 index 7cf0bbd9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-07tmpmqq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-07tmpmqq,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhbw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhbw.tsv deleted file mode 100644 index bb194144..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhbw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-085hqhbw,North Carolina Now,00:00:04,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhcm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhcm.tsv deleted file mode 100644 index eb6ddbad..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhcm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-085hqhcm,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhdb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhdb.tsv deleted file mode 100644 index 65819fec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhdb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-085hqhdb,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhf2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhf2.tsv deleted file mode 100644 index 32e8ceb6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-085hqhf2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-085hqhf2,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrc8b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrc8b.tsv deleted file mode 100644 index a30bf766..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrc8b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrc8b,North Carolina Now,00:00:04;14,00:00:29;05,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcn9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcn9.tsv deleted file mode 100644 index 4ec8c9d0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcn9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrcn9,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcp1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcp1.tsv deleted file mode 100644 index 35bc85b4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcp1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrcp1,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcqr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcqr.tsv deleted file mode 100644 index d50fbb76..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcqr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrcqr,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcrg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcrg.tsv deleted file mode 100644 index 59d57493..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcrg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrcrg,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrctx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrctx.tsv deleted file mode 100644 index 1c94540c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrctx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrctx,North Carolina Now,00:00:05,00:00:35,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcvn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcvn.tsv deleted file mode 100644 index a1adbc4b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08hdrcvn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08hdrcvn,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s8dt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s8dt.tsv deleted file mode 100644 index c4b9cdc3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s8dt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s8dt,North Carolina Now,00:00:04,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s91j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s91j.tsv deleted file mode 100644 index 97ada8f2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s91j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s91j,North Carolina Now,00:00:04,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s928.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s928.tsv deleted file mode 100644 index 00cae950..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s928.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s928,North Carolina Now,00:00:06,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s930.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s930.tsv deleted file mode 100644 index 9b68adbf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s930.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s930,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s94q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s94q.tsv deleted file mode 100644 index 265b374f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s94q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s94q,North Carolina Now,00:00:07,00:00:24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s95f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s95f.tsv deleted file mode 100644 index fb2d981f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-08v9s95f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-08v9s95f,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t5qg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t5qg.tsv deleted file mode 100644 index 39dee257..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t5qg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t5qg,North Carolina Now,00:00:04,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t634.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t634.tsv deleted file mode 100644 index c7a0921e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t634.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t634,North Carolina Now,no slate,no slate,,,,almost a slate for a second at 00:00:05 diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t64v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t64v.tsv deleted file mode 100644 index 38db6a9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t64v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t64v,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t65k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t65k.tsv deleted file mode 100644 index 1a28456d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t65k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t65k,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t669.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t669.tsv deleted file mode 100644 index e6e70beb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t669.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t669,North Carolina Now,00:00:01,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t671.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t671.tsv deleted file mode 100644 index 529a3124..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t671.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t671,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t68r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t68r.tsv deleted file mode 100644 index 165aff26..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-0966t68r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-0966t68r,North Carolina Now,00:00:04,00:00:23,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v318.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v318.tsv deleted file mode 100644 index c07cdf06..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v318.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09j3v318,North Carolina Now,no slate,no slate,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v320.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v320.tsv deleted file mode 100644 index f425f235..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v320.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09j3v320,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v33q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v33q.tsv deleted file mode 100644 index 05317f17..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v33q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09j3v33q,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v34f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v34f.tsv deleted file mode 100644 index 5fa8ccdf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09j3v34f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09j3v34f,North Carolina Now,00:00:05,00:00:29,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzcr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzcr.tsv deleted file mode 100644 index 13bf9255..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzcr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09w0vzcr,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzdg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzdg.tsv deleted file mode 100644 index c20e6115..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-09w0vzdg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-09w0vzdg,North Carolina Now,00:00:00,00:00:08,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvmc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvmc.tsv deleted file mode 100644 index 1722a077..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvmc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-106wwvmc,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvn3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvn3.tsv deleted file mode 100644 index a0b8736a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvn3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-106wwvn3,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvpt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvpt.tsv deleted file mode 100644 index 244d6f66..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-106wwvpt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-106wwvpt,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10jsxqr5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10jsxqr5.tsv deleted file mode 100644 index 3150a650..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10jsxqr5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10jsxqr5,North Carolina Now,00:00:06,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmxc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmxc.tsv deleted file mode 100644 index dbdb1c33..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmxc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10wpzmxc,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmz3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmz3.tsv deleted file mode 100644 index cccb99b6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzmz3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10wpzmz3,North Carolina Now,00:00:03,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznbr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznbr.tsv deleted file mode 100644 index 5be7a999..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznbr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10wpznbr,North Carolina Now,00:00:04,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzncg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzncg.tsv deleted file mode 100644 index 510a57d6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpzncg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10wpzncg,North Carolina Now,00:00:04;21,00:00:13;16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznd6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznd6.tsv deleted file mode 100644 index d704bf94..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-10wpznd6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-10wpznd6,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hmm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hmm.tsv deleted file mode 100644 index 22df2cdc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hmm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-117m0hmm,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hnb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hnb.tsv deleted file mode 100644 index 65f033bb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hnb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-117m0hnb,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hp2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hp2.tsv deleted file mode 100644 index ef0b1af4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-117m0hp2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-117m0hp2,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dst.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dst.tsv deleted file mode 100644 index 93bb1c79..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dst.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11kh1dst,North Carolina Now,00:00:05,00:00:26,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dtj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dtj.tsv deleted file mode 100644 index 58e8ee4b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11kh1dtj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11kh1dtj,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29f5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29f5.tsv deleted file mode 100644 index ecd69f9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29f5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd29f5,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29x9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29x9.tsv deleted file mode 100644 index 7236710e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29x9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd29x9,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29z1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29z1.tsv deleted file mode 100644 index 1c7a960c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd29z1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd29z1,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b0f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b0f.tsv deleted file mode 100644 index 50e2e7d3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b0f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd2b0f,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b15.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b15.tsv deleted file mode 100644 index 25d03abf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b15.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd2b15,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,yes part of video in smaller box diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b2w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b2w.tsv deleted file mode 100644 index db9cde4c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b2w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd2b2w,North Carolina Now,00:00:04,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b3m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b3m.tsv deleted file mode 100644 index 4115801a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-11xd2b3m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-11xd2b3m,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936f9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936f9.tsv deleted file mode 100644 index 9b7f7644..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936f9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936f9,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936g1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936g1.tsv deleted file mode 100644 index abd5e8a8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936g1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936g1,North Carolina Now,00:00:04,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936hr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936hr.tsv deleted file mode 100644 index 9de3806b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936hr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936hr,North Carolina Now,00:00:04,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936jg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936jg.tsv deleted file mode 100644 index 8ccc4fee..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936jg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936jg,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936k6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936k6.tsv deleted file mode 100644 index 575d8b3c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936k6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936k6,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936mx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936mx.tsv deleted file mode 100644 index 886c1c4f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936mx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936mx,North Carolina Now,00:00:05,00:00:09,typed,digital,boxes to fill in,slight tape jog (movement) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936nn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936nn.tsv deleted file mode 100644 index fe95559b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-128936nn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-128936nn,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6433n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6433n.tsv deleted file mode 100644 index d2e31023..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6433n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12m6433n,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6434c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6434c.tsv deleted file mode 100644 index f2bfdc11..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m6434c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12m6434c,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m64353.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m64353.tsv deleted file mode 100644 index d49d7dbc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12m64353.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12m64353,North Carolina Now,00:00:06,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z35074.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z35074.tsv deleted file mode 100644 index bc5e29ce..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z35074.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12z35074,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3508v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3508v.tsv deleted file mode 100644 index 12e47bad..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3508v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12z3508v,North Carolina Now,00:00:22,00:00:35,typed,digital,boxes to fill in,some video before slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3509k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3509k.tsv deleted file mode 100644 index 5eb53d27..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z3509k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12z3509k,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z350b9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z350b9.tsv deleted file mode 100644 index cb404453..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-12z350b9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-12z350b9,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vnm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vnm.tsv deleted file mode 100644 index 021c70d2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vnm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905vnm,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vpb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vpb.tsv deleted file mode 100644 index 8c921db3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905vpb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905vpb,North Carolina Now,00:00:04,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w20.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w20.tsv deleted file mode 100644 index 9062ca85..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w20.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905w20,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w3q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w3q.tsv deleted file mode 100644 index a70c713c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w3q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905w3q,North Carolina Now,00:00:06,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w4f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w4f.tsv deleted file mode 100644 index 448a58ee..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w4f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905w4f,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w55.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w55.tsv deleted file mode 100644 index f0617585..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13905w55.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13905w55,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6rz4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6rz4.tsv deleted file mode 100644 index ff112b35..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6rz4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13mw6rz4,North Carolina Now,00:00:04,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s0j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s0j.tsv deleted file mode 100644 index 5926a009..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s0j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13mw6s0j,North Carolina Now,00:00:05,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s18.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s18.tsv deleted file mode 100644 index e996b5a4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s18.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13mw6s18,North Carolina Now,00:00:07,00:00:21,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s20.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s20.tsv deleted file mode 100644 index 13122e94..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s20.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13mw6s20,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s3q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s3q.tsv deleted file mode 100644 index 018e93d1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13mw6s3q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13mw6s3q,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13zs7nrc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13zs7nrc.tsv deleted file mode 100644 index f68735a8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-13zs7nrc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-13zs7nrc,North Carolina Now,00:00:04,00:00:23,typed,digital,boxes to fill in,yes animation (blinking 2) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8j6x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8j6x.tsv deleted file mode 100644 index 69de7ffd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8j6x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8j6x,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jp2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jp2.tsv deleted file mode 100644 index 76f5ef9c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jp2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8jp2,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jqs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jqs.tsv deleted file mode 100644 index f2fa767f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jqs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8jqs,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jrh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jrh.tsv deleted file mode 100644 index 9069746f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jrh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8jrh,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8js7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8js7.tsv deleted file mode 100644 index 6d89a1f2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8js7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8js7,North Carolina Now,00:00:04,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jtz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jtz.tsv deleted file mode 100644 index f200b57b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jtz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8jtz,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jvp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jvp.tsv deleted file mode 100644 index 53c0d1c5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-149p8jvp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-149p8jvp,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-14nk9fh1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-14nk9fh1.tsv deleted file mode 100644 index fbc7ff5e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-14nk9fh1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-14nk9fh1,North Carolina Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-150gbb9t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-150gbb9t.tsv deleted file mode 100644 index f7cce651..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-150gbb9t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-150gbb9t,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15bcc6xr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15bcc6xr.tsv deleted file mode 100644 index 3dc6748a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15bcc6xr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-15bcc6xr,North Carolina Now,00:00:06,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3jc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3jc.tsv deleted file mode 100644 index 7c0ba7a4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3jc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-15p8d3jc,North Carolina Now,00:00:04,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3vw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3vw.tsv deleted file mode 100644 index 7712695a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-15p8d3vw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-15p8d3vw,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f209.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f209.tsv deleted file mode 100644 index 02f441b8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f209.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1615f209,North Carolina Now,00:00:05,00:00:23,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f211.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f211.tsv deleted file mode 100644 index 9d9c5065..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f211.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1615f211,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f22r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f22r.tsv deleted file mode 100644 index 8b774782..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1615f22r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1615f22r,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-16pzgsmw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-16pzgsmw.tsv deleted file mode 100644 index 57c4fb8a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-16pzgsmw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-16pzgsmw,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpcz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpcz.tsv deleted file mode 100644 index 3a59b7d4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpcz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhpcz,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpz8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpz8.tsv deleted file mode 100644 index 97f681eb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhpz8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhpz8,North Carolina Now,00:00:04,00:00:24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq0p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq0p.tsv deleted file mode 100644 index 0b866206..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq0p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhq0p,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq1d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq1d.tsv deleted file mode 100644 index 359c014c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq1d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhq1d,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq24.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq24.tsv deleted file mode 100644 index 4d45e333..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq24.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhq24,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq3v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq3v.tsv deleted file mode 100644 index 39b6d747..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-171vhq3v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-171vhq3v,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk7n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk7n.tsv deleted file mode 100644 index 9a15a3b5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk7n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17crjk7n,North Carolina Now,00:00:04,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk8c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk8c.tsv deleted file mode 100644 index 5bed90fa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk8c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17crjk8c,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk93.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk93.tsv deleted file mode 100644 index 800cefd9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjk93.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17crjk93,North Carolina Now,00:00:05,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjkbt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjkbt.tsv deleted file mode 100644 index 63abafa9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17crjkbt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17crjkbt,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgg9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgg9.tsv deleted file mode 100644 index ab7ef95b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgg9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17qnkgg9,North Carolina Now,00:00:07,00:00:26,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgh1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgh1.tsv deleted file mode 100644 index 8dd0f0ff..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgh1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17qnkgh1,North Carolina Now,00:00:06,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgjr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgjr.tsv deleted file mode 100644 index 96591f95..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-17qnkgjr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-17qnkgjr,North Carolina Now,00:00:06,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc2r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc2r.tsv deleted file mode 100644 index 647c71b5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc2r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-182jmc2r,North Carolina Now,00:00:05,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc3g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc3g.tsv deleted file mode 100644 index a3527a38..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc3g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-182jmc3g,North Carolina Now,00:00:00,00:00:02,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc46.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc46.tsv deleted file mode 100644 index 7b39b246..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc46.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-182jmc46,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc5x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc5x.tsv deleted file mode 100644 index f5c6fa92..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-182jmc5x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-182jmc5x,North Carolina Now,00:00:00,00:00:05,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18dfn8g1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18dfn8g1.tsv deleted file mode 100644 index cc15c2ff..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18dfn8g1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-18dfn8g1,North Carolina Now,00:00:04,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4wm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4wm.tsv deleted file mode 100644 index 9279b1ed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4wm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-18rbp4wm,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4xb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4xb.tsv deleted file mode 100644 index b76c4e1d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4xb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-18rbp4xb,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4z2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4z2.tsv deleted file mode 100644 index 3412984f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp4z2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-18rbp4z2,North Carolina Now,00:00:05,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp50g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp50g.tsv deleted file mode 100644 index 0e473524..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-18rbp50g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-18rbp50g,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1sk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1sk.tsv deleted file mode 100644 index 59989a56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1sk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1937q1sk,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1t9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1t9.tsv deleted file mode 100644 index 6d0fee6b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1t9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1937q1t9,North Carolina Now,00:00:06,00:00:39,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1v1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1v1.tsv deleted file mode 100644 index b99b9f8a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1v1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1937q1v1,North Carolina Now,00:00:06,00:00:29,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1wr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1wr.tsv deleted file mode 100644 index dfdc3ab5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1wr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1937q1wr,North Carolina Now,00:00:04,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1xg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1xg.tsv deleted file mode 100644 index 23cec68f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-1937q1xg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-1937q1xg,North Carolina Now,00:00:04,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qxsh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qxsh.tsv deleted file mode 100644 index 5a8d36aa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qxsh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qxsh,North Carolina Now,00:00:04,00:00:26,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz20.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz20.tsv deleted file mode 100644 index d86f816a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz20.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz20,North Carolina Now,00:00:04,00:00:28,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz3q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz3q.tsv deleted file mode 100644 index b6dbe7e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz3q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz3q,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz4f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz4f.tsv deleted file mode 100644 index a52fea1b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz4f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz4f,North Carolina Now,00:00:04;29,00:00:14;03,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz55.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz55.tsv deleted file mode 100644 index 1ed2b8a8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz55.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz55,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz6w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz6w.tsv deleted file mode 100644 index 20cf0d47..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz6w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz6w,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz7m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz7m.tsv deleted file mode 100644 index cecbcef1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19f4qz7m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19f4qz7m,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,yes animation (floating witch) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtd4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtd4.tsv deleted file mode 100644 index f862a651..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtd4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19s1rtd4,North Carolina Now,00:00:05,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtfv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtfv.tsv deleted file mode 100644 index 1fda9ecc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-19s1rtfv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-19s1rtfv,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqcz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqcz.tsv deleted file mode 100644 index ff7c4751..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqcz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqcz,North Carolina Now,00:00:04,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqdp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqdp.tsv deleted file mode 100644 index 31d735c9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqdp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqdp,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqfd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqfd.tsv deleted file mode 100644 index 580f8203..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqfd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqfd,North Carolina Now,00:00:04,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqg4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqg4.tsv deleted file mode 100644 index 1e42e8fa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqg4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqg4,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqhv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqhv.tsv deleted file mode 100644 index 7c9a9b8d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqhv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqhv,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqjk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqjk.tsv deleted file mode 100644 index a18aa2e4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqjk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqjk,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqk9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqk9.tsv deleted file mode 100644 index 316d6393..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-203xsqk9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-203xsqk9,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm6x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm6x.tsv deleted file mode 100644 index ee2ebf1d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm6x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-20fttm6x,North Carolina Now,00:00:04,00:00:21,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm7n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm7n.tsv deleted file mode 100644 index 1e4beee7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm7n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-20fttm7n,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm8c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm8c.tsv deleted file mode 100644 index c5d9a582..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm8c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-20fttm8c,North Carolina Now,00:00:08,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm93.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm93.tsv deleted file mode 100644 index f4f35f60..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttm93.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-20fttm93,North Carolina Now,00:00:05,00:00:24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttmbt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttmbt.tsv deleted file mode 100644 index 8ed80e52..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-20fttmbt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-20fttmbt,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcnc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcnc.tsv deleted file mode 100644 index b631a8dc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcnc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-214mwcnc,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcp3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcp3.tsv deleted file mode 100644 index a45f04e4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcp3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-214mwcp3,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcqt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcqt.tsv deleted file mode 100644 index b68c2e70..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwcqt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-214mwcqt,North Carolina Now,00:00:04,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd7c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd7c.tsv deleted file mode 100644 index 98ff161c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd7c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-214mwd7c,North Carolina Now,00:00:04,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd83.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd83.tsv deleted file mode 100644 index 570a10d1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-214mwd83.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-214mwd83,North Carolina Now,00:00:05;29,00:00:14;28,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx8qd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx8qd.tsv deleted file mode 100644 index 6f80e579..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx8qd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-21ghx8qd,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx967.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx967.tsv deleted file mode 100644 index 8dc388cc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx967.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-21ghx967,North Carolina Now,00:00:08,00:00:27,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx97z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx97z.tsv deleted file mode 100644 index 67e04217..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx97z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-21ghx97z,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx98p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx98p.tsv deleted file mode 100644 index 7cc9ae75..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21ghx98p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-21ghx98p,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21tdz599.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21tdz599.tsv deleted file mode 100644 index 8279d4aa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-21tdz599.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-21tdz599,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02ch.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02ch.tsv deleted file mode 100644 index 9937b9b9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02ch.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-225b02ch,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02vn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02vn.tsv deleted file mode 100644 index 79743a45..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-225b02vn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-225b02vn,North Carolina Now,00:00:05,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70x8k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70x8k.tsv deleted file mode 100644 index 92941c10..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70x8k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22h70x8k,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xwm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xwm.tsv deleted file mode 100644 index 64de00e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xwm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22h70xwm,North Carolina Now,00:00:00,00:00:07,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xxb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xxb.tsv deleted file mode 100644 index 3a1970bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xxb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22h70xxb,North Carolina Now,00:00:00,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xz2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xz2.tsv deleted file mode 100644 index c1a1723e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70xz2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22h70xz2,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70z0g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70z0g.tsv deleted file mode 100644 index 2f5163b5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22h70z0g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22h70z0g,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41v37.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41v37.tsv deleted file mode 100644 index 4c0ae23b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41v37.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22v41v37,North Carolina Now,00:00:04,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vkc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vkc.tsv deleted file mode 100644 index f9d4318a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vkc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22v41vkc,North Carolina Now,00:00:15,00:00:32,typed,digital,boxes to fill in,no but slate fades out and back in (tape error?) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vm3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vm3.tsv deleted file mode 100644 index 684fd572..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-22v41vm3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-22v41vm3,North Carolina Now,00:00:05,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r2n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r2n.tsv deleted file mode 100644 index 86b603fb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r2n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23612r2n,North Carolina Now,00:00:04,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r3c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r3c.tsv deleted file mode 100644 index 5898f109..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r3c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23612r3c,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r43.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r43.tsv deleted file mode 100644 index 01ba7039..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r43.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23612r43,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r5t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r5t.tsv deleted file mode 100644 index 9416fef6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r5t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23612r5t,North Carolina Now,00:00:06,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r6j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r6j.tsv deleted file mode 100644 index 4adc4e36..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23612r6j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23612r6j,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23hx3ngb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23hx3ngb.tsv deleted file mode 100644 index 73ced1b8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23hx3ngb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23hx3ngb,North Carolina Now,00:00:04,00:00:07,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j3z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j3z.tsv deleted file mode 100644 index ae4d04fb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j3z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23vt4j3z,North Carolina Now,00:00:07,00:00:45,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j4p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j4p.tsv deleted file mode 100644 index a6a1ea42..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-23vt4j4p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-23vt4j4p,North Carolina Now,00:00:04,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b6v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b6v.tsv deleted file mode 100644 index 51629f64..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b6v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24jm6b6v,North Carolina Now,00:00:01,00:00:08,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b7k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b7k.tsv deleted file mode 100644 index a4ef6966..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b7k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24jm6b7k,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b89.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b89.tsv deleted file mode 100644 index e3d8f4b9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24jm6b89.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24jm6b89,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75mr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75mr.tsv deleted file mode 100644 index 37041e9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75mr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24wh75mr,North Carolina Now,00:00:05,00:00:08,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75z0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75z0.tsv deleted file mode 100644 index f82e83e8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh75z0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24wh75z0,North Carolina Now,00:00:05,00:00:24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh760d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh760d.tsv deleted file mode 100644 index 5837d0f6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-24wh760d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-24wh760d,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d82mw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d82mw.tsv deleted file mode 100644 index 0110519e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d82mw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-257d82mw,North Carolina Now,00:00:04,00:00:23,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d830j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d830j.tsv deleted file mode 100644 index 94fd4104..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d830j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-257d830j,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d8318.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d8318.tsv deleted file mode 100644 index a0bb413b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-257d8318.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-257d8318,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no slate dissolves in after color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k9905r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k9905r.tsv deleted file mode 100644 index 0552dedb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k9905r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25k9905r,North Carolina Now,00:00:07,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990kf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990kf.tsv deleted file mode 100644 index 79a9ce47..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990kf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25k990kf,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990m5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990m5.tsv deleted file mode 100644 index 4bff3208..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25k990m5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25k990m5,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w02.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w02.tsv deleted file mode 100644 index 9b88100e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w02.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25x69w02,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w1s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w1s.tsv deleted file mode 100644 index 39d5ba61..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w1s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25x69w1s,North Carolina Now,00:00:05,00:00:18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w2h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w2h.tsv deleted file mode 100644 index 6e6078b9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w2h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25x69w2h,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w37.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w37.tsv deleted file mode 100644 index 4ab4cf2c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w37.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25x69w37,North Carolina Now,00:00:06,00:00:22,typed,digital,boxes to fill in,no but slate fades out and back in (tape error?) diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w4z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w4z.tsv deleted file mode 100644 index 4fe5067f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-25x69w4z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-25x69w4z,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brfx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brfx.tsv deleted file mode 100644 index 64aeb317..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brfx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2683brfx,North Carolina Now,00:00:05,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brgn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brgn.tsv deleted file mode 100644 index 769f43d5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brgn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2683brgn,North Carolina Now,00:00:05;04,00:00:19;23,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brhc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brhc.tsv deleted file mode 100644 index ad91b92c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2683brhc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2683brhc,North Carolina Now,00:00:05;10,00:00:20;18,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnq9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnq9.tsv deleted file mode 100644 index 770d473f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnq9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnq9,North Carolina Now,00:00:05,00:00:38,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnr1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnr1.tsv deleted file mode 100644 index db545652..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnr1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnr1,North Carolina Now,00:00:09,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnsr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnsr.tsv deleted file mode 100644 index 22462527..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnsr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnsr,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cntg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cntg.tsv deleted file mode 100644 index 6fb31305..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cntg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cntg,North Carolina Now,00:00:04,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnv6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnv6.tsv deleted file mode 100644 index 34c5ea61..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnv6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnv6,North Carolina Now,00:00:06,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnwx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnwx.tsv deleted file mode 100644 index cc3a5ba0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnwx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnwx,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnxn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnxn.tsv deleted file mode 100644 index 1ef16351..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnxn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnxn,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnzc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnzc.tsv deleted file mode 100644 index 94b996a9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26m0cnzc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26m0cnzc,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj6f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj6f.tsv deleted file mode 100644 index f3e0d4dc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj6f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26xwdj6f,North Carolina Now,00:00:08,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj75.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj75.tsv deleted file mode 100644 index fb068647..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj75.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26xwdj75,North Carolina Now,00:00:04,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj8w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj8w.tsv deleted file mode 100644 index 492e1e72..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-26xwdj8w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-26xwdj8w,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfd92.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfd92.tsv deleted file mode 100644 index 2c2c82a9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfd92.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-278sfd92,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdn9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdn9.tsv deleted file mode 100644 index f5dd1bb7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdn9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-278sfdn9,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdp1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdp1.tsv deleted file mode 100644 index d707c0c2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdp1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-278sfdp1,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdqr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdqr.tsv deleted file mode 100644 index ad51b2c8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-278sfdqr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-278sfdqr,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb30.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb30.tsv deleted file mode 100644 index 819830a4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb30.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgb30,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb4q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb4q.tsv deleted file mode 100644 index 488fdc22..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb4q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgb4q,North Carolina Now,00:00:04,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb5f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb5f.tsv deleted file mode 100644 index 35168f14..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb5f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgb5f,North Carolina Now,00:00:05,00:00:23,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb65.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb65.tsv deleted file mode 100644 index a76053c3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgb65.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgb65,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbmv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbmv.tsv deleted file mode 100644 index 64f1ef75..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbmv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgbmv,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbnk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbnk.tsv deleted file mode 100644 index afa04692..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27mpgbnk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27mpgbnk,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh64m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh64m.tsv deleted file mode 100644 index b19effb8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh64m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27zkh64m,North Carolina Now,00:00:04,00:00:19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6k1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6k1.tsv deleted file mode 100644 index b5b132a6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6k1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27zkh6k1,North Carolina Now,00:00:05,00:00:22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6mr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6mr.tsv deleted file mode 100644 index 819c8f82..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-27zkh6mr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-27zkh6mr,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj39c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj39c.tsv deleted file mode 100644 index 0ebef322..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj39c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-289gj39c,North Carolina Now,00:00:04,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3pb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3pb.tsv deleted file mode 100644 index c7a42996..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3pb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-289gj3pb,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3q2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3q2.tsv deleted file mode 100644 index ccc7a38a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-289gj3q2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-289gj3q2,North Carolina Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0px.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0px.tsv deleted file mode 100644 index 44e44885..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0px.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-28nck0px,North Carolina Now,00:00:05,00:00:10,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0qn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0qn.tsv deleted file mode 100644 index 15dd4fae..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck0qn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-28nck0qn,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck11v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck11v.tsv deleted file mode 100644 index 1432f24d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck11v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-28nck11v,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck12k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck12k.tsv deleted file mode 100644 index 9f63b42b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck12k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-28nck12k,North Carolina Now,00:00:05,00:00:12,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck139.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck139.tsv deleted file mode 100644 index 55498fae..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-28nck139.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-28nck139,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwcw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwcw.tsv deleted file mode 100644 index 3ceabf4e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwcw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwcw,North Carolina Now,00:00:04,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwdm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwdm.tsv deleted file mode 100644 index 71f3df9d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwdm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwdm,North Carolina Now,00:00:05,00:00:09,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwfb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwfb.tsv deleted file mode 100644 index fb9186dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwfb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwfb,North Carolina Now,00:00:05,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwg2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwg2.tsv deleted file mode 100644 index 48c9a622..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwg2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwg2,North Carolina Now,00:00:05,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwhs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwhs.tsv deleted file mode 100644 index d4387501..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwhs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwhs,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwjh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwjh.tsv deleted file mode 100644 index e70a4ca9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwjh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwjh,North Carolina Now,00:00:05,00:00:06,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwk7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwk7.tsv deleted file mode 100644 index f903506e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-2908kwk7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-2908kwk7,North Carolina Now,00:00:04,00:00:17,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mscg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mscg.tsv deleted file mode 100644 index f8845c24..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mscg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5mscg,North Carolina Now,00:00:05,00:00:16,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msd6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msd6.tsv deleted file mode 100644 index 516a949b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msd6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5msd6,North Carolina Now,00:00:04,00:00:15,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msfx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msfx.tsv deleted file mode 100644 index c1f282d6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msfx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5msfx,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mswb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mswb.tsv deleted file mode 100644 index 1a0630e2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mswb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5mswb,North Carolina Now,00:00:04,00:00:25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msx2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msx2.tsv deleted file mode 100644 index e28ec344..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5msx2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5msx2,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mszs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mszs.tsv deleted file mode 100644 index 460f372e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29b5mszs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29b5mszs,North Carolina Now,00:00:04,00:00:14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2nnzp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2nnzp.tsv deleted file mode 100644 index 76456757..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2nnzp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29p2nnzp,North Carolina Now,00:00:05,00:00:20,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npc2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npc2.tsv deleted file mode 100644 index 85152fb1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npc2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29p2npc2,North Carolina Now,00:00:05,00:00:11,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npds.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npds.tsv deleted file mode 100644 index 8f59cc10..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-29p2npds.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-29p2npds,North Carolina Now,00:00:05,00:00:13,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-34sj422h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-34sj422h.tsv deleted file mode 100644 index d81cb0e6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-34sj422h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-34sj422h,North Carolina Now,00:00:05;12,00:00:17;04,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-4947dhdh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-4947dhdh.tsv deleted file mode 100644 index 2ddf5d4f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-4947dhdh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-4947dhdh,North Carolina Now,00:00:04;18,00:00:07;25,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-60qrfv0q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-60qrfv0q.tsv deleted file mode 100644 index bff4d95b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-60qrfv0q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-60qrfv0q,North Carolina Now,00:00:05;07,00:00:27;110,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-66j1009t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-66j1009t.tsv deleted file mode 100644 index 3eb0d75e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-66j1009t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-66j1009t,North Carolina Now,00:00:05;10,00:00:22;02,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-69z08wkv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-69z08wkv.tsv deleted file mode 100644 index 699faaca..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-69z08wkv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-69z08wkv,North Carolina Now,00:00:05;08,00:00:17;26,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76f1vvrm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76f1vvrm.tsv deleted file mode 100644 index 7140a971..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76f1vvrm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-76f1vvrm,North Carolina Now,00:00:05;13,00:00:09;24,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76rxwqnr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76rxwqnr.tsv deleted file mode 100644 index dd824513..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-76rxwqnr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-76rxwqnr,North Carolina Now,00:00:04;29,00:00:13;14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-78gf26qv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-78gf26qv.tsv deleted file mode 100644 index 6f5182c6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-78gf26qv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-78gf26qv,North Carolina Now,00:00:05;17,00:00:17;14,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-83xsjgjh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-83xsjgjh.tsv deleted file mode 100644 index f1a5c466..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-83xsjgjh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-83xsjgjh,North Carolina Now,00:00:07;01,00:00:14;08,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-8605qtdf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-8605qtdf.tsv deleted file mode 100644 index 3fa1ddc6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-8605qtdf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-8605qtdf,North Carolina Now,00:00:05;12,00:00:16;19,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-87pnw91c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-87pnw91c.tsv deleted file mode 100644 index abea3d09..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-87pnw91c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-87pnw91c,North Carolina Now,00:00:05;10,00:00:17;28,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-89280vgh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-89280vgh.tsv deleted file mode 100644 index 25a153a5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-89280vgh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-89280vgh,North Carolina Now,00:00:04;12,00:00:13;06,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-91fj72nc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-91fj72nc.tsv deleted file mode 100644 index 37cfbab4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-129-91fj72nc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-129-91fj72nc,North Carolina Now,00:00:05;22,00:00:21;22,typed,digital,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0000003w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0000003w.tsv deleted file mode 100644 index b80bd6b6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0000003w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-0000003w,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s0n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s0n.tsv deleted file mode 100644 index cc24a575..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s0n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-00ns1s0n,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s1c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s1c.tsv deleted file mode 100644 index 2ffc5751..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-00ns1s1c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-00ns1s1c,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-010p2ntg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-010p2ntg.tsv deleted file mode 100644 index d182d9ea..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-010p2ntg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-010p2ntg,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jj8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jj8.tsv deleted file mode 100644 index f6cbca6f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jj8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-01bk3jj8,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jk0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jk0.tsv deleted file mode 100644 index 773f3968..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-01bk3jk0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-01bk3jk0,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-021c5bgj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-021c5bgj.tsv deleted file mode 100644 index 986fd7e7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-021c5bgj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-021c5bgj,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c8676b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c8676b.tsv deleted file mode 100644 index 4a9ce950..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c8676b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-02c8676b,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c86772.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c86772.tsv deleted file mode 100644 index 7ce4e65c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-02c86772.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-02c86772,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280xk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280xk.tsv deleted file mode 100644 index ee5c713d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280xk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-032280xk,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280z9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280z9.tsv deleted file mode 100644 index f2b4c466..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-032280z9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-032280z9,New York Now,00:00:00,00:00:04,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wvg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wvg.tsv deleted file mode 100644 index 0f8ecbbc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wvg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-03cz8wvg,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8ww6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8ww6.tsv deleted file mode 100644 index 376f12bb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8ww6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-03cz8ww6,New York Now,00:00:00,00:00:07,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wxx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wxx.tsv deleted file mode 100644 index dda54d8b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-03cz8wxx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-03cz8wxx,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktcx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktcx.tsv deleted file mode 100644 index a9c9610e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktcx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-06sxktcx,New York Now,00:00:00,00:00:04,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktdn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktdn.tsv deleted file mode 100644 index 73e389c3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktdn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-06sxktdn,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktfc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktfc.tsv deleted file mode 100644 index a6d43cc5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-06sxktfc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-06sxktfc,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-08v9s5g1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-08v9s5g1.tsv deleted file mode 100644 index ad7a9cbb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-08v9s5g1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-08v9s5g1,New York Now,00:00:00,00:00:06,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0966t2hw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0966t2hw.tsv deleted file mode 100644 index d59c7cb7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-0966t2hw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-0966t2hw,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19k7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19k7.tsv deleted file mode 100644 index 05f766cc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19k7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-11kh19k7,New York Now,00:00:26,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19mz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19mz.tsv deleted file mode 100644 index c81edabf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11kh19mz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-11kh19mz,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11xd2691.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11xd2691.tsv deleted file mode 100644 index e5c9fb2f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-11xd2691.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-11xd2691,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12893358.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12893358.tsv deleted file mode 100644 index c74f3df0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12893358.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12893358,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m6403d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m6403d.tsv deleted file mode 100644 index f8a93af8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m6403d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12m6403d,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m64044.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m64044.tsv deleted file mode 100644 index 7c6bd840..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12m64044.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12m64044,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w2m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w2m.tsv deleted file mode 100644 index bef9e2be..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w2m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12z34w2m,New York Now,00:00:26,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w3b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w3b.tsv deleted file mode 100644 index 350b0395..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w3b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12z34w3b,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w42.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w42.tsv deleted file mode 100644 index ae96819b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-12z34w42.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-12z34w42,New York Now,00:00:17,00:00:27,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-13mw6nqt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-13mw6nqt.tsv deleted file mode 100644 index 96759d30..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-13mw6nqt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-13mw6nqt,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-14nk9b68.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-14nk9b68.tsv deleted file mode 100644 index ad1c5c38..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-14nk9b68.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-14nk9b68,New York Now,no slate,no slate,,,,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-150gb6zn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-150gb6zn.tsv deleted file mode 100644 index 8be922f6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-150gb6zn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-150gb6zn,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-1615dwph.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-1615dwph.tsv deleted file mode 100644 index 1de19d49..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-1615dwph.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-1615dwph,New York Now,00:00:09,00:00:19,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgphg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgphg.tsv deleted file mode 100644 index ae1b5d8b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgphg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-16pzgphg,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpj6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpj6.tsv deleted file mode 100644 index a3673d56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpj6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-16pzgpj6,New York Now,00:00:00,00:00:07,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpkx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpkx.tsv deleted file mode 100644 index 7fdeabbb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpkx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-16pzgpkx,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpmn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpmn.tsv deleted file mode 100644 index c496016f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-16pzgpmn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-16pzgpmn,New York Now,no slate,no slate,,,,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1gp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1gp.tsv deleted file mode 100644 index 9bb9d9cf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1gp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-18rbp1gp,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1hd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1hd.tsv deleted file mode 100644 index 293c54ce..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-18rbp1hd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-18rbp1hd,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtck.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtck.tsv deleted file mode 100644 index 085d6167..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtck.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-19f4qtck,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtd9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtd9.tsv deleted file mode 100644 index 7151efa9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19f4qtd9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-19f4qtd9,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19s1rq6j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19s1rq6j.tsv deleted file mode 100644 index dad1f811..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-19s1rq6j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-19s1rq6j,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-203xsm4n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-203xsm4n.tsv deleted file mode 100644 index e651207e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-203xsm4n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-203xsm4n,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgwg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgwg.tsv deleted file mode 100644 index e1cb6383..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgwg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-20fttgwg,New York Now,00:00:26,00:00:34,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgx6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgx6.tsv deleted file mode 100644 index 024310e2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20fttgx6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-20fttgx6,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20sqvcqf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20sqvcqf.tsv deleted file mode 100644 index 0e089edb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-20sqvcqf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-20sqvcqf,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-214mw8h7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-214mw8h7.tsv deleted file mode 100644 index 2eee2a60..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-214mw8h7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-214mw8h7,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22h70v81.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22h70v81.tsv deleted file mode 100644 index 17710a6e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22h70v81.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-22h70v81,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22v41qzd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22v41qzd.tsv deleted file mode 100644 index 067ebf83..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-22v41qzd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-22v41qzd,New York Now,00:00:05,00:00:12,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-24wh7377.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-24wh7377.tsv deleted file mode 100644 index 536c1a8d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-24wh7377.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-24wh7377,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-25x69rnw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-25x69rnw.tsv deleted file mode 100644 index 6ce78c58..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-25x69rnw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-25x69rnw,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnjv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnjv.tsv deleted file mode 100644 index 3ad5908b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnjv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-2683bnjv,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnkk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnkk.tsv deleted file mode 100644 index 98980be3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-2683bnkk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-2683bnkk,New York Now,00:00:11,00:00:19,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-26m0cjnm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-26m0cjnm.tsv deleted file mode 100644 index d1b067b2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-26m0cjnm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-26m0cjnm,New York Now,no slate,no slate,,,,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-278sfb1q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-278sfb1q.tsv deleted file mode 100644 index 4288604d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-278sfb1q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-278sfb1q,New York Now,00:00:17,00:00:27,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-27mpg719.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-27mpg719.tsv deleted file mode 100644 index 864a4e02..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-27mpg719.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-27mpg719,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-28ncjwhd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-28ncjwhd.tsv deleted file mode 100644 index 2fc91b44..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-28ncjwhd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-28ncjwhd,New York Now,00:00:12,00:00:18,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpdz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpdz.tsv deleted file mode 100644 index d8c7f28b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpdz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-29b5mpdz,New York Now,00:00:15;18,00:00:25;17,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpfp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpfp.tsv deleted file mode 100644 index baa6755f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-29b5mpfp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-29b5mpfp,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30bvqbxv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30bvqbxv.tsv deleted file mode 100644 index 06e7deec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30bvqbxv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-30bvqbxv,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30prr7rt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30prr7rt.tsv deleted file mode 100644 index 5320d108..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-30prr7rt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-30prr7rt,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4m2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4m2.tsv deleted file mode 100644 index 6c5e18cb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4m2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-311ns4m2,New York Now,00:00:26;14,00:00:34;14,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4ns.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4ns.tsv deleted file mode 100644 index 7fe626fb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-311ns4ns.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-311ns4ns,New York Now,00:00:25;06,00:00:33;05,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-31cjt1mn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-31cjt1mn.tsv deleted file mode 100644 index b43d8ddb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-31cjt1mn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-31cjt1mn,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq3f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq3f.tsv deleted file mode 100644 index 14078862..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq3f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-32d7wq3f,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq45.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq45.tsv deleted file mode 100644 index 077d435c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-32d7wq45.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-32d7wq45,New York Now,00:00:14;25,00:00:24;24,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cpd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cpd.tsv deleted file mode 100644 index 2c8e912e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cpd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-33dz0cpd,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cq4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cq4.tsv deleted file mode 100644 index ae36c082..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0cq4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-33dz0cq4,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0crv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0crv.tsv deleted file mode 100644 index ae1b15d6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-33dz0crv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-33dz0crv,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-343r25bw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-343r25bw.tsv deleted file mode 100644 index cf497013..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-343r25bw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-343r25bw,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z42.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z42.tsv deleted file mode 100644 index c5d8b44f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z42.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-34sj3z42,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z5s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z5s.tsv deleted file mode 100644 index 5b865935..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-34sj3z5s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-34sj3z5s,New York Now,00:00:00;00,00:00:05;03,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-35t76mk3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-35t76mk3.tsv deleted file mode 100644 index ddc0953c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-35t76mk3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-35t76mk3,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-375tb64j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-375tb64j.tsv deleted file mode 100644 index 0f676a56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-375tb64j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-375tb64j,New York Now,00:00:16;02,00:00:26;01,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-38w9gndg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-38w9gndg.tsv deleted file mode 100644 index c10c6b0c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-38w9gndg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-38w9gndg,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-3976hj9f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-3976hj9f.tsv deleted file mode 100644 index e01bc415..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-3976hj9f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-3976hj9f,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0pm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0pm.tsv deleted file mode 100644 index dc697a56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0pm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-40xpp0pm,New York Now,00:00:04,00:00:12,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0qb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0qb.tsv deleted file mode 100644 index 5252d358..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-40xpp0qb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-40xpp0qb,New York Now,00:00:00,00:00:07,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-41mgqsfm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-41mgqsfm.tsv deleted file mode 100644 index 96ed8b3c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-41mgqsfm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-41mgqsfm,New York Now,00:00:25;15,00:00:33;15,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4298sk0x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4298sk0x.tsv deleted file mode 100644 index 3aa66fd0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4298sk0x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-4298sk0x,New York Now,00:00:05,00:00:12,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-439zw7nq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-439zw7nq.tsv deleted file mode 100644 index 3eb321d4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-439zw7nq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-439zw7nq,New York Now,00:00:14;28,00:00:24;28,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44bnzx7p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44bnzx7p.tsv deleted file mode 100644 index 10e0cde4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44bnzx7p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-44bnzx7p,New York Now,00:00:00,00:00:03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44pk0t0t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44pk0t0t.tsv deleted file mode 100644 index 47c7d854..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-44pk0t0t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-44pk0t0t,New York Now,00:00:10,00:00:16,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gmg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gmg.tsv deleted file mode 100644 index e7a35f91..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gmg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-45q83gmg,New York Now,00:00:26,00:00:34,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gn6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gn6.tsv deleted file mode 100644 index 69b30f28..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-45q83gn6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-45q83gn6,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46254cmm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46254cmm.tsv deleted file mode 100644 index 484c2089..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46254cmm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-46254cmm,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46d258bd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46d258bd.tsv deleted file mode 100644 index 05c5d7a9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46d258bd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-46d258bd,New York Now,00:00:25;15,00:00:33;14,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46qz653b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46qz653b.tsv deleted file mode 100644 index ab2a935a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-46qz653b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-46qz653b,New York Now,00:00:00,00:00:03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-472v7246.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-472v7246.tsv deleted file mode 100644 index 271b348b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-472v7246.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-472v7246,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-47dr7xzt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-47dr7xzt.tsv deleted file mode 100644 index a80bd0bd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-47dr7xzt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-47dr7xzt,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48ffbmhq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48ffbmhq.tsv deleted file mode 100644 index f3376515..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48ffbmhq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-48ffbmhq,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchfv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchfv.tsv deleted file mode 100644 index 1ba860fb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchfv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-48sbchfv,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchgk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchgk.tsv deleted file mode 100644 index acde780f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchgk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-48sbchgk,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchh9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchh9.tsv deleted file mode 100644 index b2d24291..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchh9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-48sbchh9,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchj1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchj1.tsv deleted file mode 100644 index 9e2d84b0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-48sbchj1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-48sbchj1,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddbt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddbt.tsv deleted file mode 100644 index f41c987d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddbt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-4947ddbt,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddcj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddcj.tsv deleted file mode 100644 index cb38e113..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddcj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-4947ddcj,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddd8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddd8.tsv deleted file mode 100644 index 98b5e086..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddd8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-4947ddd8,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddf0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddf0.tsv deleted file mode 100644 index ef4a1815..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-4947ddf0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-4947ddf0,New York Now,00:00:00,00:00:07,typed,digital,free text,yes countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f942.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f942.tsv deleted file mode 100644 index 15be886e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f942.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-49g4f942,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f95s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f95s.tsv deleted file mode 100644 index 9ac5a86f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-49g4f95s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-49g4f95s,New York Now,00:00:16,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-504xh2wf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-504xh2wf.tsv deleted file mode 100644 index a8d527bb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-504xh2wf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-504xh2wf,New York Now,00:00:00,00:00:04,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50gthzrg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50gthzrg.tsv deleted file mode 100644 index 32d930ec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50gthzrg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-50gthzrg,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50tqjvkf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50tqjvkf.tsv deleted file mode 100644 index d343563b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-50tqjvkf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-50tqjvkf,New York Now,00:00:27,00:00:34,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-51hhmnct.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-51hhmnct.tsv deleted file mode 100644 index e84fcbfc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-51hhmnct.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-51hhmnct,New York Now,00:00:13,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5269pf21.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5269pf21.tsv deleted file mode 100644 index 76d8a458..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5269pf21.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-5269pf21,New York Now,00:00:25;00,00:00:32;29,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5370s3kh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5370s3kh.tsv deleted file mode 100644 index d1ceb62b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-5370s3kh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-5370s3kh,New York Now,00:00:06,00:00:27,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0gb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0gb.tsv deleted file mode 100644 index db800183..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0gb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-53jwt0gb,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0h2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0h2.tsv deleted file mode 100644 index 2dc76080..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0h2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-53jwt0h2,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0js.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0js.tsv deleted file mode 100644 index da6324e9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-53jwt0js.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-53jwt0js,New York Now,00:00:00,00:00:04,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54kkwp29.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54kkwp29.tsv deleted file mode 100644 index 17e65212..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54kkwp29.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-54kkwp29,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54xgxk15.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54xgxk15.tsv deleted file mode 100644 index c6bbb83d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-54xgxk15.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-54xgxk15,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-55m90bv6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-55m90bv6.tsv deleted file mode 100644 index 84390221..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-55m90bv6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-55m90bv6,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324f7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324f7.tsv deleted file mode 100644 index 2895a71e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324f7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-569324f7,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324gz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324gz.tsv deleted file mode 100644 index a431c548..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-569324gz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-569324gz,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031d3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031d3.tsv deleted file mode 100644 index 4e8fbb46..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031d3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-56n031d3,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031ft.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031ft.tsv deleted file mode 100644 index 03ca96f2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-56n031ft.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-56n031ft,New York Now,00:00:10,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58bg7grf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58bg7grf.tsv deleted file mode 100644 index 14e6052f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58bg7grf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-58bg7grf,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58pc8cg7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58pc8cg7.tsv deleted file mode 100644 index 07696212..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-58pc8cg7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-58pc8cg7,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c22v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c22v.tsv deleted file mode 100644 index 320e56ee..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c22v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-59q2c22v,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c23k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c23k.tsv deleted file mode 100644 index 4aaa19ed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-59q2c23k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-59q2c23k,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmjh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmjh.tsv deleted file mode 100644 index f39764c8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmjh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-612ngmjh,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmk7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmk7.tsv deleted file mode 100644 index 2ad96fcf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-612ngmk7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-612ngmk7,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61djhh89.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61djhh89.tsv deleted file mode 100644 index 67a84d93..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61djhh89.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-61djhh89,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61rfjd9m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61rfjd9m.tsv deleted file mode 100644 index e0fbc475..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-61rfjd9m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-61rfjd9m,New York Now,00:00:09,00:00:22,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk95v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk95v.tsv deleted file mode 100644 index 7ff41dae..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk95v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-623bk95v,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk96k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk96k.tsv deleted file mode 100644 index 8a137ca7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-623bk96k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-623bk96k,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzr4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzr4.tsv deleted file mode 100644 index f0236a4a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzr4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-6341nzr4,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzsv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzsv.tsv deleted file mode 100644 index 861bb890..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6341nzsv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-6341nzsv,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-64thtf1t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-64thtf1t.tsv deleted file mode 100644 index ac834add..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-64thtf1t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-64thtf1t,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-65h9w6jq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-65h9w6jq.tsv deleted file mode 100644 index 1535eaeb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-65h9w6jq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-65h9w6jq,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57gw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57gw.tsv deleted file mode 100644 index 20763549..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57gw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-68kd57gw,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57hm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57hm.tsv deleted file mode 100644 index 8ba3be82..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-68kd57hm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-68kd57hm,New York Now,00:00:00,00:00:03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6986713n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6986713n.tsv deleted file mode 100644 index 301e0351..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-6986713n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-6986713n,New York Now,00:00:01,00:00:11,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08svd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08svd.tsv deleted file mode 100644 index 3dbd603f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08svd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-69z08svd,New York Now,00:00:26,00:00:34,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sw4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sw4.tsv deleted file mode 100644 index 1562eda3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sw4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-69z08sw4,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sxv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sxv.tsv deleted file mode 100644 index 4b4252f5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-69z08sxv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-69z08sxv,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-719kdcc4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-719kdcc4.tsv deleted file mode 100644 index bab0ed87..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-719kdcc4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-719kdcc4,New York Now,00:00:21,00:00:30,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-71ngf85c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-71ngf85c.tsv deleted file mode 100644 index 277dcbaf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-71ngf85c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-71ngf85c,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg52b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg52b.tsv deleted file mode 100644 index fbab3c9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg52b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-720cg52b,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg532.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg532.tsv deleted file mode 100644 index df02da6c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg532.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-720cg532,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg54s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg54s.tsv deleted file mode 100644 index e23659dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-720cg54s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-720cg54s,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1wm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1wm.tsv deleted file mode 100644 index dcbbf1cf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1wm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-72b8h1wm,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1xb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1xb.tsv deleted file mode 100644 index b4d28d87..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1xb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-72b8h1xb,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1z2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1z2.tsv deleted file mode 100644 index af952a1a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-72b8h1z2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-72b8h1z2,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jthq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jthq.tsv deleted file mode 100644 index 5cd1365e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jthq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-7312jthq,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtjf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtjf.tsv deleted file mode 100644 index 3e9b70d7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtjf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-7312jtjf,New York Now,00:00:00;00,00:00:05;17,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtk5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtk5.tsv deleted file mode 100644 index f4d8557b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtk5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-7312jtk5,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtmw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtmw.tsv deleted file mode 100644 index 1e20fcab..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-7312jtmw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-7312jtmw,New York Now,00:00:15;05,00:00:25;04,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-73bzkqhq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-73bzkqhq.tsv deleted file mode 100644 index cd86acdc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-73bzkqhq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-73bzkqhq,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szf4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szf4.tsv deleted file mode 100644 index b45b1e39..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szf4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-75r7szf4,New York Now,00:00:00,00:00:03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szgv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szgv.tsv deleted file mode 100644 index eb3d212b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-75r7szgv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-75r7szgv,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-773txj7n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-773txj7n.tsv deleted file mode 100644 index 04c31b86..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-773txj7n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-773txj7n,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-805x6js5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-805x6js5.tsv deleted file mode 100644 index d545e429..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-805x6js5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-805x6js5,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-80vq8bgt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-80vq8bgt.tsv deleted file mode 100644 index 8dafbfc9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-80vq8bgt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-80vq8bgt,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-81jhb4bn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-81jhb4bn.tsv deleted file mode 100644 index 530e7b0b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-81jhb4bn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-81jhb4bn,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dstr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dstr.tsv deleted file mode 100644 index 4ee124ec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dstr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-82k6dstr,New York Now,00:00:04,00:00:12,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsvg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsvg.tsv deleted file mode 100644 index 1850fe45..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsvg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-82k6dsvg,New York Now,00:00:11,00:00:22,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsw6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsw6.tsv deleted file mode 100644 index 866f4c00..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82k6dsw6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-82k6dsw6,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fpnq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fpnq.tsv deleted file mode 100644 index 6d1c2098..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fpnq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-82x3fpnq,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fppf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fppf.tsv deleted file mode 100644 index 61f641d3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-82x3fppf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-82x3fppf,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8380gkm4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8380gkm4.tsv deleted file mode 100644 index 83f19d0f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8380gkm4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-8380gkm4,New York Now,no slate,no slate,,,,no slate countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-83kwhgbb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-83kwhgbb.tsv deleted file mode 100644 index fb66ad0a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-83kwhgbb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-83kwhgbb,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk81j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk81j.tsv deleted file mode 100644 index 72352da1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk81j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-848pk81j,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk828.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk828.tsv deleted file mode 100644 index 06bfd96e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-848pk828.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-848pk828,New York Now,00:00:15,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptfs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptfs.tsv deleted file mode 100644 index 40d8a6ae..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptfs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-85n8ptfs,New York Now,00:00:44;26,00:00:52;25,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptgh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptgh.tsv deleted file mode 100644 index 776d09df..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-85n8ptgh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-85n8ptgh,New York Now,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8605qqd6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8605qqd6.tsv deleted file mode 100644 index 6a34ae70..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-8605qqd6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-8605qqd6,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm75.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm75.tsv deleted file mode 100644 index 2917d9b6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm75.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-86b2rm75,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm8w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm8w.tsv deleted file mode 100644 index 56c5de40..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86b2rm8w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-86b2rm8w,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh6f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh6f.tsv deleted file mode 100644 index 04350b7c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh6f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-86nzsh6f,New York Now,00:00:26;18,00:00:34;18,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh75.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh75.tsv deleted file mode 100644 index 7b8624de..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-86nzsh75.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-86nzsh75,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8th.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8th.tsv deleted file mode 100644 index edef7973..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8th.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-87brv8th,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8v7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8v7.tsv deleted file mode 100644 index c28ffa65..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8v7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-87brv8v7,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8wz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8wz.tsv deleted file mode 100644 index 80a7a496..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87brv8wz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-87brv8wz,New York Now,00:00:17,00:00:27,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87pnw5p6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87pnw5p6.tsv deleted file mode 100644 index a8b93eb8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-87pnw5p6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-87pnw5p6,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-88qbzv7f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-88qbzv7f.tsv deleted file mode 100644 index 3f044c16..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-88qbzv7f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-88qbzv7f,New York Now,00:00:15;08,00:00:25;07,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r2k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r2k.tsv deleted file mode 100644 index 7e73af40..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r2k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-89280r2k,New York Now,00:00:00,00:00:02,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r39.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r39.tsv deleted file mode 100644 index 526163f8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89280r39.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-89280r39,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89r22hvq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89r22hvq.tsv deleted file mode 100644 index ed7dc866..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-89r22hvq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-89r22hvq,New York Now,00:00:15,00:00:25,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-902z3dtj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-902z3dtj.tsv deleted file mode 100644 index e99d0677..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-902z3dtj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-902z3dtj,New York Now,00:00:00,00:00:05,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj709k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj709k.tsv deleted file mode 100644 index 01181b4e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj709k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-91fj709k,New York Now,00:00:25,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70b9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70b9.tsv deleted file mode 100644 index 5deeed41..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70b9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-91fj70b9,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70c1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70c1.tsv deleted file mode 100644 index dc4348e9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91fj70c1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-91fj70c1,New York Now,00:00:00,00:00:04,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91sf7w4w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91sf7w4w.tsv deleted file mode 100644 index 3e88a803..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-91sf7w4w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-91sf7w4w,New York Now,00:00:25;10,00:00:33;09,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-924b8rtt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-924b8rtt.tsv deleted file mode 100644 index aaccc3fc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-924b8rtt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-924b8rtt,New York Now,00:00:26,00:00:33,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-92g79nwv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-92g79nwv.tsv deleted file mode 100644 index 1cd2c84e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-92g79nwv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-92g79nwv,New York Now,00:00:24;21,00:00:32;20,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfms.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfms.tsv deleted file mode 100644 index 2ce7af28..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfms.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-9351cfms,New York Now,00:00:00;00,00:00:04;27,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfnh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfnh.tsv deleted file mode 100644 index 5f9e227f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9351cfnh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-9351cfnh,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-945qg46t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-945qg46t.tsv deleted file mode 100644 index fe8597eb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-945qg46t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-945qg46t,New York Now,00:00:14,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-95j9kpkb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-95j9kpkb.tsv deleted file mode 100644 index 79a0c1fc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-95j9kpkb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-95j9kpkb,New York Now,00:00:00;00,00:00:05;21,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9673ng7t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9673ng7t.tsv deleted file mode 100644 index 1e4aa81c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9673ng7t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-9673ng7t,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttbp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttbp.tsv deleted file mode 100644 index b8a7c594..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttbp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-988gttbp,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttcd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttcd.tsv deleted file mode 100644 index c732fe4d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttcd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-988gttcd,New York Now,00:00:05,00:00:12,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttd4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttd4.tsv deleted file mode 100644 index 5b01e048..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-988gttd4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-988gttd4,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-98z8wm7p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-98z8wm7p.tsv deleted file mode 100644 index 47faf981..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-98z8wm7p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-98z8wm7p,New York Now,00:00:00;00,00:00:05;00,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh0r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh0r.tsv deleted file mode 100644 index 8f11a913..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh0r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-9995xh0r,New York Now,00:00:25,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh1g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh1g.tsv deleted file mode 100644 index 1300cae1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-131-9995xh1g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-131-9995xh1g,New York Now,00:00:24,00:00:32,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000000vj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000000vj.tsv deleted file mode 100644 index af107375..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000000vj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-000000vj,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000002z3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000002z3.tsv deleted file mode 100644 index b1b0e93b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-000002z3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-000002z3,Front Street Weekly,00:00:00,00:00:01,typed,digital,free text,slate/camera info over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-009w0wcr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-009w0wcr.tsv deleted file mode 100644 index fe709cfd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-009w0wcr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-009w0wcr,Front Street Weekly,00:00:09,00:00:19,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-032281kr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-032281kr.tsv deleted file mode 100644 index f2b036d8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-032281kr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-032281kr,Front Street Weekly,00:00:01,00:00:04,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-03cz8xgx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-03cz8xgx.tsv deleted file mode 100644 index 7a276ee0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-03cz8xgx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-03cz8xgx,Front Street Weekly,00:00:08,00:00:11,typed,digital,free text,slate over image diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-042rbpt6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-042rbpt6.tsv deleted file mode 100644 index b992d84f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-042rbpt6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-042rbpt6,Front Street Weekly,00:00:06,00:00:25,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-04dnckw7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-04dnckw7.tsv deleted file mode 100644 index 056037f5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-04dnckw7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-04dnckw7,Front Street Weekly,00:00:05,00:00:25,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-05s7h55x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-05s7h55x.tsv deleted file mode 100644 index 5a89eea6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-05s7h55x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-05s7h55x,Front Street Weekly,00:00:02,00:00:21,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmcc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmcc.tsv deleted file mode 100644 index 73211c7f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmcc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-07gqnmcc,Front Street Weekly,00:00:00,00:00:04,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmd3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmd3.tsv deleted file mode 100644 index 39e94b5e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-07gqnmd3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-07gqnmd3,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-085hqddt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-085hqddt.tsv deleted file mode 100644 index 4c5c5991..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-085hqddt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-085hqddt,Front Street Weekly,00:00:01,00:00:04,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-09j3tzvs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-09j3tzvs.tsv deleted file mode 100644 index 6163fc8d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-09j3tzvs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-09j3tzvs,Front Street Weekly,00:00:04,00:00:24,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-106wwrgz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-106wwrgz.tsv deleted file mode 100644 index e6bf2b8a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-106wwrgz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-106wwrgz,Front Street Weekly,00:00:05,00:00:16,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-117m0f63.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-117m0f63.tsv deleted file mode 100644 index afb99039..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-117m0f63.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-117m0f63,Front Street Weekly,00:00:08,00:00:19,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933r9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933r9.tsv deleted file mode 100644 index c1642127..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933r9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-128933r9,Front Street Weekly,00:00:20,00:00:19,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933s1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933s1.tsv deleted file mode 100644 index 5f4943e5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-128933s1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-128933s1,Front Street Weekly,00:00:20,00:00:34,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-12z34wf9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-12z34wf9.tsv deleted file mode 100644 index cb504138..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-12z34wf9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-12z34wf9,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-13zs7k0m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-13zs7k0m.tsv deleted file mode 100644 index 1ea8d06b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-13zs7k0m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-13zs7k0m,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-14nk9bs9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-14nk9bs9.tsv deleted file mode 100644 index ed7272c7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-14nk9bs9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-14nk9bs9,Front Street Weekly,00:00:00,00:00:02,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-1615f088.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-1615f088.tsv deleted file mode 100644 index 5eeb4762..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-1615f088.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-1615f088,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2fszm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2fszm.tsv deleted file mode 100644 index 3731c195..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2fszm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-16c2fszm,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2ft2g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2ft2g.tsv deleted file mode 100644 index f3f51e53..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16c2ft2g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-16c2ft2g,Front Street Weekly,00:00:03,00:00:09,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16pzgptq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16pzgptq.tsv deleted file mode 100644 index f0597c11..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-16pzgptq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-16pzgptq,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,moving image behind slate animation words countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-17qnkc3t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-17qnkc3t.tsv deleted file mode 100644 index f1f6785a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-17qnkc3t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-17qnkc3t,Front Street Weekly,00:00:00,00:00:04,typed,digital,free text,slate over color bars only title diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtn3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtn3.tsv deleted file mode 100644 index dc61cf33..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtn3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-19f4qtn3,Front Street Weekly,00:00:05,00:00:14,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtr8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtr8.tsv deleted file mode 100644 index a57f899d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-19f4qtr8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-19f4qtr8,Front Street Weekly,00:00:03,00:00:23,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20fttk52.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20fttk52.tsv deleted file mode 100644 index 8eee6fe0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20fttk52.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-20fttk52,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20sqvf3h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20sqvf3h.tsv deleted file mode 100644 index a489429e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-20sqvf3h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-20sqvf3h,Front Street Weekly,00:00:13,00:00:22,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5sb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5sb.tsv deleted file mode 100644 index b688465d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5sb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-21ghx5sb,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5wh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5wh.tsv deleted file mode 100644 index 783ce59c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx5wh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-21ghx5wh,Front Street Weekly,no slate,no slate,,,,no pacman countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx898.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx898.tsv deleted file mode 100644 index 32884399..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-21ghx898.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-21ghx898,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vg3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vg3.tsv deleted file mode 100644 index 175cc098..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vg3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-22h70vg3,Front Street Weekly,00:00:04,00:00:23,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vht.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vht.tsv deleted file mode 100644 index ca7d7070..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-22h70vht.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-22h70vht,Front Street Weekly,00:00:10,00:00:19,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612n24.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612n24.tsv deleted file mode 100644 index a0157f0b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612n24.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-23612n24,Front Street Weekly,00:00:05,00:00:24,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612q02.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612q02.tsv deleted file mode 100644 index 5e05646f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23612q02.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-23612q02,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23hx3hwt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23hx3hwt.tsv deleted file mode 100644 index 428bf0c0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-23hx3hwt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-23hx3hwt,Front Street Weekly,00:00:05,00:00:20,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-246q59t3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-246q59t3.tsv deleted file mode 100644 index 711690c8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-246q59t3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-246q59t3,Front Street Weekly,00:00:04,00:00:23,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80kb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80kb.tsv deleted file mode 100644 index eb227f89..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80kb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-257d80kb,Front Street Weekly,00:00:05,00:00:24,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80ph.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80ph.tsv deleted file mode 100644 index 63054adf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-257d80ph.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-257d80ph,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-25x69s18.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-25x69s18.tsv deleted file mode 100644 index a5790ae7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-25x69s18.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-25x69s18,Front Street Weekly,00:00:17,00:00:23,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26m0cjqs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26m0cjqs.tsv deleted file mode 100644 index 6804fa8b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26m0cjqs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-26m0cjqs,Front Street Weekly,00:00:01,00:00:11,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26xwdfzv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26xwdfzv.tsv deleted file mode 100644 index ca3ceeac..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-26xwdfzv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-26xwdfzv,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-278sfbrn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-278sfbrn.tsv deleted file mode 100644 index 19d1033e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-278sfbrn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-278sfbrn,Front Street Weekly,00:00:00,00:00:04,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx34.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx34.tsv deleted file mode 100644 index a82bac10..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx34.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-28ncjx34,Front Street Weekly,00:00:04,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx8r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx8r.tsv deleted file mode 100644 index 7c31239a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-28ncjx8r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-28ncjx8r,Front Street Weekly,00:00:17,00:00:26,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-29b5mpnr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-29b5mpnr.tsv deleted file mode 100644 index 12ca19bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-29b5mpnr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-29b5mpnr,Front Street Weekly,00:00:15,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-300zpjd6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-300zpjd6.tsv deleted file mode 100644 index 6ea91c9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-300zpjd6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-300zpjd6,Front Street Weekly,00:00:23,00:00:28,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-30prr83g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-30prr83g.tsv deleted file mode 100644 index 3a9bfc1a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-30prr83g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-30prr83g,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4vv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4vv.tsv deleted file mode 100644 index e0425eec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4vv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-311ns4vv,Front Street Weekly,00:00:03,00:00:23,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4wk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4wk.tsv deleted file mode 100644 index 60705598..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns4wk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-311ns4wk,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars font color change diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns5s3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns5s3.tsv deleted file mode 100644 index 58d9a9d2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-311ns5s3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-311ns5s3,Front Street Weekly,00:00:00,00:00:04,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1tq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1tq.tsv deleted file mode 100644 index e57e2674..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1tq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-31cjt1tq,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1zm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1zm.tsv deleted file mode 100644 index ffc1b8ff..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31cjt1zm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-31cjt1zm,Front Street Weekly,00:00:04,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31qftxvc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31qftxvc.tsv deleted file mode 100644 index 5a661f0c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-31qftxvc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-31qftxvc,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvtrb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvtrb.tsv deleted file mode 100644 index 3f28719a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvtrb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-322bvtrb,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvvg7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvvg7.tsv deleted file mode 100644 index 31d5e75c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-322bvvg7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-322bvvg7,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-32d7wqdp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-32d7wqdp.tsv deleted file mode 100644 index 696ada7e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-32d7wqdp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-32d7wqdp,Front Street Weekly,00:00:15,00:00:22,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d3h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d3h.tsv deleted file mode 100644 index 6534fd33..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d3h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-33dz0d3h,Front Street Weekly,00:00:06,00:00:25,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d5z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d5z.tsv deleted file mode 100644 index b679e9c6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d5z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-33dz0d5z,Front Street Weekly,00:00:11,00:00:15,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d6p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d6p.tsv deleted file mode 100644 index d9380f9a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33dz0d6p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-33dz0d6p,Front Street Weekly,00:00:00,00:00:03,typed,digital,free text,slate over color bars only title diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33rv190x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33rv190x.tsv deleted file mode 100644 index 53dd6a0b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-33rv190x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-33rv190x,Front Street Weekly,00:00:04,00:00:14,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-34fn32g3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-34fn32g3.tsv deleted file mode 100644 index 962fc216..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-34fn32g3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-34fn32g3,Front Street Weekly,00:00:11,00:00:13,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-35gb5rhg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-35gb5rhg.tsv deleted file mode 100644 index 11b3c9e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-35gb5rhg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-35gb5rhg,Front Street Weekly,00:00:02,00:00:20,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j3h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j3h.tsv deleted file mode 100644 index 3aa294e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j3h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-36547j3h,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j47.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j47.tsv deleted file mode 100644 index 10d38fcf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-36547j47.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-36547j47,Front Street Weekly,00:00:00,00:00:16,typed,digital,free text,slate over color bars countdown slate after color bar slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-375tb6kp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-375tb6kp.tsv deleted file mode 100644 index 176b6f3a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-375tb6kp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-375tb6kp,Front Street Weekly,00:00:09,00:00:19,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw5n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw5n.tsv deleted file mode 100644 index e964eb23..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw5n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-386hdw5n,Front Street Weekly,00:00:00,00:00:03,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw6c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw6c.tsv deleted file mode 100644 index 9d11542e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdw6c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-386hdw6c,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdz86.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdz86.tsv deleted file mode 100644 index 19456f22..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-386hdz86.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-386hdz86,Front Street Weekly,00:00:00,00:00:03,typed,digital,free text,slate over color bars only title diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38jdfrt9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38jdfrt9.tsv deleted file mode 100644 index 65a2d3e5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38jdfrt9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-38jdfrt9,Front Street Weekly,00:00:16,00:00:22,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gntw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gntw.tsv deleted file mode 100644 index 385a6fd6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gntw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-38w9gntw,Front Street Weekly,00:00:06,00:00:25,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gnx2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gnx2.tsv deleted file mode 100644 index 7909dbfa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-38w9gnx2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-38w9gnx2,Front Street Weekly,00:00:03,00:00:22,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn45k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn45k.tsv deleted file mode 100644 index c0a73cec..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn45k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-40ksn45k,Front Street Weekly,00:00:05,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn6d1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn6d1.tsv deleted file mode 100644 index f331bfef..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40ksn6d1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-40ksn6d1,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp120.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp120.tsv deleted file mode 100644 index 8314ce0a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp120.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-40xpp120,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp17m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp17m.tsv deleted file mode 100644 index 32081d9e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-40xpp17m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-40xpp17m,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-4298skkz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-4298skkz.tsv deleted file mode 100644 index dae435ed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-4298skkz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-4298skkz,Front Street Weekly,00:00:10,00:00:19,typed,digital,key-value pairs,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg79.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg79.tsv deleted file mode 100644 index 815368f4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg79.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-42n5tg79,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg81.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg81.tsv deleted file mode 100644 index 3d7b514a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg81.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-42n5tg81,Front Street Weekly,00:00:09,00:00:21,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg9r.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg9r.tsv deleted file mode 100644 index 39dd217b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tg9r.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-42n5tg9r,Front Street Weekly,00:00:04,00:00:20,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tgbg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tgbg.tsv deleted file mode 100644 index 5e5303bf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-42n5tgbg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-42n5tgbg,Front Street Weekly,00:00:00,00:00:14,typed,digital,free text,countdown on slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-440rz203.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-440rz203.tsv deleted file mode 100644 index 41615a40..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-440rz203.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-440rz203,Front Street Weekly,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxr8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxr8.tsv deleted file mode 100644 index 7d2b28e2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxr8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-44bnzxr8,Front Street Weekly,00:00:00,00:00:05,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxs0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxs0.tsv deleted file mode 100644 index eecb244f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-44bnzxs0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-44bnzxs0,Front Street Weekly,00:00:09,00:00:19,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-46254cw4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-46254cw4.tsv deleted file mode 100644 index 8d3dc20c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-46254cw4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-46254cw4,Front Street Weekly,00:00:03,00:00:07,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-472v72b8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-472v72b8.tsv deleted file mode 100644 index 50eb4449..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-472v72b8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-472v72b8,Front Street Weekly,00:00:07,00:00:24,typed,digital,free text,no countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48ffbpfc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48ffbpfc.tsv deleted file mode 100644 index 5be39d5d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48ffbpfc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-48ffbpfc,Front Street Weekly,00:00:00,00:00:06,typed,digital,free text,slate over color bars diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48sbchpn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48sbchpn.tsv deleted file mode 100644 index c313b84f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-153-48sbchpn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-153-48sbchpn,Front Street Weekly,00:00:08,00:00:19,typed,digital,key-value pairs,no pacman countdown after slate diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-01pg4fmz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-01pg4fmz.tsv deleted file mode 100644 index 3bad4bda..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-01pg4fmz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-01pg4fmz,Speaking of Rochester,00:00:25;00,00:00:32;28,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-042rbpjb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-042rbpjb.tsv deleted file mode 100644 index d2413b72..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-042rbpjb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-042rbpjb,The Rochester I Know,00:00:23;11,00:00:32;09,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-07tmph2c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-07tmph2c.tsv deleted file mode 100644 index d9d2f58d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-07tmph2c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-07tmph2c,The Rochester I Know,00:00:08;20,00:00:23;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-08v9s5rg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-08v9s5rg.tsv deleted file mode 100644 index 7f53af44..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-08v9s5rg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-08v9s5rg,Speaking of Rochester,00:00:25;14,00:00:33;11,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-09w0vv3c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-09w0vv3c.tsv deleted file mode 100644 index f1743b56..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-09w0vv3c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-09w0vv3c,The Rochester I Know,00:00:08;01,00:00:36;28,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-12m64032.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-12m64032.tsv deleted file mode 100644 index 2116f742..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-12m64032.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-12m64032,The Rochester I Know,00:00:05;14,00:00:16;26,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-13zs7jf8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-13zs7jf8.tsv deleted file mode 100644 index c738b22e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-13zs7jf8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-13zs7jf8,Speaking of Rochester,00:00:29;16,00:00:37;07,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-20sqvcwq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-20sqvcwq.tsv deleted file mode 100644 index 4b575b72..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-20sqvcwq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-20sqvcwq,Speaking of Rochester,00:00:25;14,00:00:33;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-27zkh41j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-27zkh41j.tsv deleted file mode 100644 index 7035655e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-27zkh41j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-27zkh41j,The Rochester I Know,00:00:05;04,00:00:56;04,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-2908kskn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-2908kskn.tsv deleted file mode 100644 index 269a12ed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-2908kskn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-2908kskn,Speaking of Rochester,00:00:25;23,00:00:33;04,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-29b5mpdm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-29b5mpdm.tsv deleted file mode 100644 index 935b1667..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-29b5mpdm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-29b5mpdm,Speaking of Rochester,00:00:25;02,00:00:33;01,typed,digital,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-31qftxfm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-31qftxfm.tsv deleted file mode 100644 index 272b550a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-31qftxfm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-31qftxfm,Speaking of Rochester,00:00:25;11,00:00:26;30,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-36tx995s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-36tx995s.tsv deleted file mode 100644 index e97a6d48..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-36tx995s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-36tx995s,Speaking of Rochester,00:00:42;11,00:00:49;09,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrnm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrnm.tsv deleted file mode 100644 index a5340fa8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrnm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-38jdfrnm,Speaking of Rochester,00:00:24;17,00:00:32;16,typed,digital,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrpb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrpb.tsv deleted file mode 100644 index 8e3ed93b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-38jdfrpb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-38jdfrpb,The Rochester I Know,00:00:11;02,00:00:24;27,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-39x0kb26.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-39x0kb26.tsv deleted file mode 100644 index 84da2254..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-39x0kb26.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-39x0kb26,The Rochester I Know,00:00:26;10,00:00:36;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk0k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk0k.tsv deleted file mode 100644 index ca10f195..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk0k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-4298sk0k,The Rochester I Know,00:00:17;21,00:00:29;20,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk19.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk19.tsv deleted file mode 100644 index b903b923..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-4298sk19.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-4298sk19,The Rochester I Know,00:00:15;22,00:00:19;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-53jwt0jf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-53jwt0jf.tsv deleted file mode 100644 index 1e27fa79..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-53jwt0jf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-53jwt0jf,The Rochester I Know,00:00:06;05,00:00:25;11,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-55z617r8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-55z617r8.tsv deleted file mode 100644 index 2504e57d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-55z617r8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-55z617r8,The Rochester I Know,00:00:18;07,00:00:37;24,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-580k6krh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-580k6krh.tsv deleted file mode 100644 index d6c6322a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-580k6krh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-580k6krh,Speaking of Rochester,00:00:08;01,00:00:14;17,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-59c5b54c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-59c5b54c.tsv deleted file mode 100644 index 94fa621f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-59c5b54c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-59c5b54c,The Rochester I Know,00:00:16;18,00:00:35;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-60qrfqqn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-60qrfqqn.tsv deleted file mode 100644 index 8905548f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-60qrfqqn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-60qrfqqn,Speaking of Rochester,00:00:27;28,00:00:35;06,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvk5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvk5.tsv deleted file mode 100644 index 80ea1035..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvk5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-63fxpvk5,Speaking of Rochester,00:00:23;04,00:00:30;12,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvmw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvmw.tsv deleted file mode 100644 index 679e054d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-63fxpvmw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-63fxpvmw,Speaking of Rochester,00:00:20;19,00:00:28;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-65h9w6k3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-65h9w6k3.tsv deleted file mode 100644 index 5213c6be..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-65h9w6k3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-65h9w6k3,The Rochester I Know,00:00:07;00,00:00:29;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-67jq2jzc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-67jq2jzc.tsv deleted file mode 100644 index 6a11b8dc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-67jq2jzc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-67jq2jzc,The Rochester I Know,00:00:06;00,00:00:20;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-68kd57j0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-68kd57j0.tsv deleted file mode 100644 index 9006ec40..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-68kd57j0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-68kd57j0,The Rochester I Know,00:00:10;07,00:00:26;28,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-72p5hxzn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-72p5hxzn.tsv deleted file mode 100644 index 88fb0498..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-72p5hxzn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-72p5hxzn,Speaking of Rochester,00:01:20;09,00:01:27;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-741rnh6k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-741rnh6k.tsv deleted file mode 100644 index 4b0dd677..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-741rnh6k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-741rnh6k,Speaking of Rochester,00:00:21;22,00:00:29;21,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16mh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16mh.tsv deleted file mode 100644 index 8a27b8c7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16mh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-784j16mh,Speaking of Rochester,00:00:24;25,00:00:32;09,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16n7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16n7.tsv deleted file mode 100644 index 4fab837e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-784j16n7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-784j16n7,Speaking of Rochester,00:00:24;26,00:00:32;25,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80ht7fms.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80ht7fms.tsv deleted file mode 100644 index bc1f0cdc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80ht7fms.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-80ht7fms,The Rochester I Know,00:00:08;07,00:00:34;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80vq8bgg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80vq8bgg.tsv deleted file mode 100644 index 6758c3bb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-80vq8bgg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-80vq8bgg,The Rochester I Know,00:00:05;24,00:00:38;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-84zgn223.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-84zgn223.tsv deleted file mode 100644 index 156025db..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-84zgn223.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-84zgn223,Speaking of Rochester,00:00:24;16,00:00:32;15,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-86b2rmdf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-86b2rmdf.tsv deleted file mode 100644 index d932cf1f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-86b2rmdf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-86b2rmdf,The Rochester I Know,00:00:05;09,00:00:21;15,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-881jx2qq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-881jx2qq.tsv deleted file mode 100644 index 37c4065c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-881jx2qq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-881jx2qq,Speaking of Rochester,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-91fj707s.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-91fj707s.tsv deleted file mode 100644 index a54c1d20..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-91fj707s.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-91fj707s,The Rochester I Know,00:00:15;13,00:00:31;12,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-92t4bjtn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-92t4bjtn.tsv deleted file mode 100644 index fec781d1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-92t4bjtn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-92t4bjtn,Speaking of Rochester,00:00:25;16,00:00:33;10,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-93ttf74w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-93ttf74w.tsv deleted file mode 100644 index 2c6bf073..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-189-93ttf74w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-189-93ttf74w,The Rochester I Know,00:00:09;08,00:00:19;13,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-074tmrfw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-074tmrfw.tsv deleted file mode 100644 index 056ce3bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-074tmrfw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-074tmrfw,Across Indiana,00:00:10;14,00:00:23;18,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-150gb84b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-150gb84b.tsv deleted file mode 100644 index 9660639d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-150gb84b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-150gb84b,Across Indiana,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-1937pzw7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-1937pzw7.tsv deleted file mode 100644 index 776805df..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-1937pzw7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-1937pzw7,Across Indiana,00:00:10;28,00:00:24;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-225b008g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-225b008g.tsv deleted file mode 100644 index 9f423097..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-225b008g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-225b008g,Across Indiana,00:00:11;09,00:00:24;06,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-27zkh4b3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-27zkh4b3.tsv deleted file mode 100644 index 55380ae9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-27zkh4b3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-27zkh4b3,Across Indiana,00:00:10;25,00:00:23;25,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz5j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz5j.tsv deleted file mode 100644 index 333a8c70..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz5j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-31qftz5j,Across Indiana,00:00:10;13,00:00:23;17,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz68.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz68.tsv deleted file mode 100644 index 551437e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-31qftz68.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-31qftz68,Across Indiana,00:00:10;21,00:00:23;25,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-34fn338d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-34fn338d.tsv deleted file mode 100644 index 26d2b927..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-34fn338d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-34fn338d,Across Indiana,00:00:10;26,00:00:24;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36547jkm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36547jkm.tsv deleted file mode 100644 index 429687ca..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36547jkm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-36547jkm,Across Indiana,00:00:10;15,00:00:23;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36tx9bnn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36tx9bnn.tsv deleted file mode 100644 index e0ea0369..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-36tx9bnn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-36tx9bnn,Across Indiana,00:00:10;10,00:00:23;14,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-375tb736.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-375tb736.tsv deleted file mode 100644 index 2dd3d521..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-375tb736.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-375tb736,Across Indiana,00:00:10;17,00:00:23;21,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-386hdx1d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-386hdx1d.tsv deleted file mode 100644 index f042e2b5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-386hdx1d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-386hdx1d,Across Indiana,00:00:10;27,00:00:24;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-43nvx5rv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-43nvx5rv.tsv deleted file mode 100644 index a040d3b5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-43nvx5rv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-43nvx5rv,Across Indiana,00:00:10;28,00:00:24;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-5269pg71.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-5269pg71.tsv deleted file mode 100644 index 5e2da7ac..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-5269pg71.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-5269pg71,Across Indiana,00:00:10;14,00:00:23;18,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-558czgn1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-558czgn1.tsv deleted file mode 100644 index bf948c6e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-558czgn1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-558czgn1,Across Indiana,00:00:10;28,00:00:24;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hk6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hk6.tsv deleted file mode 100644 index c9c5d882..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hk6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-58bg7hk6,Across Indiana,00:00:10;25,00:00:23;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hmx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hmx.tsv deleted file mode 100644 index 29b00146..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-58bg7hmx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-58bg7hmx,Across Indiana,00:00:10;26,00:00:24;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-64thtfsf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-64thtfsf.tsv deleted file mode 100644 index 6bcdb676..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-64thtfsf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-64thtfsf,Across Indiana,00:00:11;26,00:00:25;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-67jq2kz3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-67jq2kz3.tsv deleted file mode 100644 index 50447d4a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-67jq2kz3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-67jq2kz3,Across Indiana,00:00:10;28,00:00:24;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-708w9qpq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-708w9qpq.tsv deleted file mode 100644 index 2a5e9f9d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-708w9qpq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-708w9qpq,Across Indiana,00:00:10;08,00:00:23;12,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-7312jvbg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-7312jvbg.tsv deleted file mode 100644 index 7c5c9d4b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-7312jvbg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-7312jvbg,Across Indiana,00:00:10;14,00:00:23;18,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-74cnpf7m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-74cnpf7m.tsv deleted file mode 100644 index 52fbff41..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-74cnpf7m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-74cnpf7m,Across Indiana,00:00:10;28,00:00:24;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-805x6m6x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-805x6m6x.tsv deleted file mode 100644 index d84fdcaf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-805x6m6x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-805x6m6x,Across Indiana,00:00:09;29,00:00:23;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-84zgn2vs.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-84zgn2vs.tsv deleted file mode 100644 index 5280bdf1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-84zgn2vs.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-84zgn2vs,Across Indiana,00:00:11;00,00:00:24;04,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-86nzsjgm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-86nzsjgm.tsv deleted file mode 100644 index cb1f49e3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-86nzsjgm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-86nzsjgm,Across Indiana,00:00:10;26,00:00:24;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-881jx3pq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-881jx3pq.tsv deleted file mode 100644 index a61fd5f7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-881jx3pq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-881jx3pq,Across Indiana,00:00:10;29,00:00:24;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-902z3ftx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-902z3ftx.tsv deleted file mode 100644 index 3ffcb3ea..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-902z3ftx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-902z3ftx,Across Indiana,00:00:10;21,00:00:23;25,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-90dv4br2.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-90dv4br2.tsv deleted file mode 100644 index 92727ad9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-90dv4br2.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-90dv4br2,Across Indiana,00:00:10;26,00:00:24;00,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-92g79pn5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-92g79pn5.tsv deleted file mode 100644 index e04d19a9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-92g79pn5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-92g79pn5,Across Indiana,00:00:12;25,00:00:25;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-945qg5jf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-945qg5jf.tsv deleted file mode 100644 index 5e1da317..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-945qg5jf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-945qg5jf,Across Indiana,00:00:10;14,00:00:23;18,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-96wwq9p6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-96wwq9p6.tsv deleted file mode 100644 index be0f512c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-200-96wwq9p6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-200-96wwq9p6,Across Indiana,00:00:11;24,00:00:24;28,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-042rcjzf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-042rcjzf.tsv deleted file mode 100644 index dbae3f9e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-042rcjzf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-042rcjzf,Outlook,00:00:05;24,00:00:13;25,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-15bcd0gv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-15bcd0gv.tsv deleted file mode 100644 index a4e65102..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-15bcd0gv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-15bcd0gv,Outlook,00:00:09;28,00:00:17;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-18dfp1rn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-18dfp1rn.tsv deleted file mode 100644 index 7cf14f82..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-18dfp1rn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-18dfp1rn,Outlook,00:00:05;02,00:00:13;04,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-19f4rq7f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-19f4rq7f.tsv deleted file mode 100644 index 025c30f3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-19f4rq7f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-19f4rq7f,Outlook,00:00:05;16,00:00:13;18,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-20ftvbhk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-20ftvbhk.tsv deleted file mode 100644 index e801cf2c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-20ftvbhk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-20ftvbhk,Outlook,00:00:09;25,00:00:17;26,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-36548ck9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-36548ck9.tsv deleted file mode 100644 index 50c6aee0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-36548ck9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-36548ck9,Outlook,00:00:05;11,00:00:13;12,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-37vmdv3d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-37vmdv3d.tsv deleted file mode 100644 index cfbbf50c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-37vmdv3d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-37vmdv3d,Outlook,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-3976jbt0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-3976jbt0.tsv deleted file mode 100644 index 24c5f863..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-3976jbt0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-3976jbt0,Outlook,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-42n5v9dk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-42n5v9dk.tsv deleted file mode 100644 index d3d3c9f0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-42n5v9dk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-42n5v9dk,Outlook,00:00:06;08,00:00:14;11,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-47rn9r0k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-47rn9r0k.tsv deleted file mode 100644 index e8a40b8f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-47rn9r0k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-47rn9r0k,Outlook,00:00:09;02,00:00:17;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-49t1h18x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-49t1h18x.tsv deleted file mode 100644 index 50c202dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-49t1h18x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-49t1h18x,Outlook,00:00:11;13,00:00:19;14,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-5370swqf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-5370swqf.tsv deleted file mode 100644 index c00a6093..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-5370swqf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-5370swqf,Outlook,00:00:10;27,00:00:18;28,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-580k7dqh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-580k7dqh.tsv deleted file mode 100644 index 477bd76e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-580k7dqh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-580k7dqh,Outlook,00:00:05;18,00:00:13;20,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-67wm48rb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-67wm48rb.tsv deleted file mode 100644 index 99a6ced1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-67wm48rb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-67wm48rb,Outlook,00:00:05;08,00:00:13;10,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-69z09p02.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-69z09p02.tsv deleted file mode 100644 index 395cfbac..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-69z09p02.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-69z09p02,Outlook,00:00:21;12,00:00:30;20,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-86b2sgc4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-86b2sgc4.tsv deleted file mode 100644 index c4be9587..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-86b2sgc4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-86b2sgc4,Outlook,00:00:09;15,00:00:17;16,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-924b9nm7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-924b9nm7.tsv deleted file mode 100644 index e44ee986..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-924b9nm7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-924b9nm7,Outlook,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgts.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgts.tsv deleted file mode 100644 index 5c74f6ff..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgts.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-92g7bgts,Outlook,00:00:04;26,00:00:12;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgvh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgvh.tsv deleted file mode 100644 index 5843ce3c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-92g7bgvh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-92g7bgvh,Outlook,00:00:11;00,00:00:18;27,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-988gvq43.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-988gvq43.tsv deleted file mode 100644 index af50543a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-235-988gvq43.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-235-988gvq43,Outlook,00:00:05;119,00:00:13;22,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-01pg4g2x.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-01pg4g2x.tsv deleted file mode 100644 index b2b83f2d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-01pg4g2x.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-01pg4g2x,Prime Time Wisconsin,00:00:00;00,00:00:08;14,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-06sxkv86.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-06sxkv86.tsv deleted file mode 100644 index 969546a0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-06sxkv86.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-06sxkv86,Prime Time Wisconsin,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-08v9s6dt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-08v9s6dt.tsv deleted file mode 100644 index 0b45c674..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-08v9s6dt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-08v9s6dt,Prime Time Wisconsin,00:00:00;00,00:00:26;00,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-106wwrfp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-106wwrfp.tsv deleted file mode 100644 index bfee3195..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-106wwrfp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-106wwrfp,Prime Time Wisconsin,00:00:00;00,00:00:05;01,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-117m0f2f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-117m0f2f.tsv deleted file mode 100644 index afcb357d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-117m0f2f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-117m0f2f,Prime Time Wisconsin,00:00:00;00,00:00:04;20,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-11xd270w.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-11xd270w.tsv deleted file mode 100644 index 006275d6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-11xd270w.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-11xd270w,Prime Time Wisconsin,00:00:00;00,00:00:06;23,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-15bcc4sg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-15bcc4sg.tsv deleted file mode 100644 index f0998079..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-15bcc4sg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-15bcc4sg,Prime Time Wisconsin,00:00:27;23,00:00:37;00,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-22v41r8t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-22v41r8t.tsv deleted file mode 100644 index fc00ddc7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-22v41r8t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-22v41r8t,Prime Time Wisconsin,00:00:00;00,00:00:06;07,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-24wh73nq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-24wh73nq.tsv deleted file mode 100644 index 5e64c566..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-24wh73nq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-24wh73nq,Wisconsin Week,00:00:00;00,00:00:07;05,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-29p2nkpp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-29p2nkpp.tsv deleted file mode 100644 index 479b6729..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-29p2nkpp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-29p2nkpp,Wisconsin Week,00:00:04;28,00:00:44;19,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-35t76n4f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-35t76n4f.tsv deleted file mode 100644 index 8416bc14..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-35t76n4f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-35t76n4f,Wisconsin Week,00:00:04;20,00:00:39;21,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-3976hk2f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-3976hk2f.tsv deleted file mode 100644 index fde2b198..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-3976hk2f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-3976hk2f,Wisconsin Week,00:00:00;00,00:00:06;19,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-41mgqtx3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-41mgqtx3.tsv deleted file mode 100644 index 751735de..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-41mgqtx3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-41mgqtx3,Prime Time Wisconsin,00:00:05;06,00:00:15;05,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-440rz2bm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-440rz2bm.tsv deleted file mode 100644 index 14a2051f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-440rz2bm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-440rz2bm,Wisconsin Week,00:00:00;15,00:00:11;08,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-46254dmz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-46254dmz.tsv deleted file mode 100644 index d13a4689..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-46254dmz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-46254dmz,Prime Time Wisconsin,00:00:07;02,00:00:17;01,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-48ffbnfm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-48ffbnfm.tsv deleted file mode 100644 index 2c019607..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-48ffbnfm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-48ffbnfm,Prime Time Wisconsin,00:00:00;00,00:00:09;21,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-4947dfbw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-4947dfbw.tsv deleted file mode 100644 index cfad6bfa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-4947dfbw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-4947dfbw,Wisconsin Week,00:00:00;00,00:00:07;27,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-49g4f9wp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-49g4f9wp.tsv deleted file mode 100644 index d1985ce3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-49g4f9wp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-49g4f9wp,Wisconsin Week,00:00:00;00,00:00:18;21,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-50tqjw98.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-50tqjw98.tsv deleted file mode 100644 index 3eefc0bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-50tqjw98.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-50tqjw98,Wisconsin Week,00:00:05;19,00:00:40;12,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-515mks96.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-515mks96.tsv deleted file mode 100644 index a7642b38..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-515mks96.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-515mks96,Prime Time Wisconsin,00:00:00;00,00:00:06;19,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-5269pfn6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-5269pfn6.tsv deleted file mode 100644 index 7729a733..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-5269pfn6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-5269pfn6,Wisconsin Week,00:00:00;00,00:00:04;12,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-57np5qmn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-57np5qmn.tsv deleted file mode 100644 index b82a05f3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-57np5qmn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-57np5qmn,Wisconsin Week,00:00:05;26,00:00:20;23,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-61rfjdxq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-61rfjdxq.tsv deleted file mode 100644 index 2d8073fb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-61rfjdxq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-61rfjdxq,Wisconsin Week,00:00:00;00,00:00:06;04,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66j0zx33.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66j0zx33.tsv deleted file mode 100644 index 9f35a92f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66j0zx33.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-66j0zx33,Wisconsin Week,00:00:00;00,00:00:05;11,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66vx0sr0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66vx0sr0.tsv deleted file mode 100644 index 4ab8424a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-66vx0sr0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-66vx0sr0,Wisconsin Week,00:00:00;00,00:00:12;14,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-687h4cjj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-687h4cjj.tsv deleted file mode 100644 index 00539a07..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-687h4cjj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-687h4cjj,Prime Time Wisconsin,00:00:00;00,00:00:13;07,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-68kd58pq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-68kd58pq.tsv deleted file mode 100644 index 7514c370..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-68kd58pq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-68kd58pq,Prime Time Wisconsin,00:00:04;26,00:00:14;25,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7312jv8m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7312jv8m.tsv deleted file mode 100644 index 7760d725..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7312jv8m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-7312jv8m,Prime Time Wisconsin,00:00:07;03,00:00:17;01,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7634tw3m.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7634tw3m.tsv deleted file mode 100644 index eaafee81..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-7634tw3m.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-7634tw3m,Wisconsin Week,00:00:04;25,00:00:15;26,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-773txjgr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-773txjgr.tsv deleted file mode 100644 index e63e3e66..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-773txjgr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-773txjgr,Wisconsin Week,00:00:00;00,00:00:05;11,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-784j17c1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-784j17c1.tsv deleted file mode 100644 index c870b110..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-784j17c1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-784j17c1,Wisconsin Week,00:00:05;07,00:00:22;17,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-78tb30x7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-78tb30x7.tsv deleted file mode 100644 index 69e77ef4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-78tb30x7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-78tb30x7,Wisconsin Week,00:00:05;03,00:00:18;03,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-84mkm5rk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-84mkm5rk.tsv deleted file mode 100644 index b6a06fbf..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-84mkm5rk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-84mkm5rk,Wisconsin Week,00:00:04;27,00:00:18;11,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-86nzshb0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-86nzshb0.tsv deleted file mode 100644 index c2aa065f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-86nzshb0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-86nzshb0,Prime Time Wisconsin,00:00:00;00,00:00:04;21,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-89280s5z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-89280s5z.tsv deleted file mode 100644 index ec494b5b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-89280s5z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-89280s5z,Prime Time Wisconsin,00:00:04;22,00:00:23;25,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-902z3fdn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-902z3fdn.tsv deleted file mode 100644 index 3fe48a75..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-902z3fdn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-902z3fdn,Prime Time Wisconsin,00:00:04;18,00:00:09;26,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mm5b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mm5b.tsv deleted file mode 100644 index 27919789..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mm5b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-95w6mm5b,Wisconsin Week,00:00:09;21,00:00:24;29,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mmcg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mmcg.tsv deleted file mode 100644 index 023f87d3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-95w6mmcg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-95w6mmcg,Prime Time Wisconsin,00:00:07;01,00:00:27;25,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-97kps24j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-97kps24j.tsv deleted file mode 100644 index c4304c1d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-97kps24j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-97kps24j,Prime Time Wisconsin,00:00:00;00,00:00:06;14,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-9995xhq3.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-9995xhq3.tsv deleted file mode 100644 index 97d566c9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-29-9995xhq3.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-29-9995xhq3,Wisconsin Week,00:00:05;21,00:00:23;20,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-03qv9sz0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-03qv9sz0.tsv deleted file mode 100644 index 1bf65710..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-03qv9sz0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-03qv9sz0,Evening Exchange,00:00:13;10,00:00:32;11,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-0966t2q0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-0966t2q0.tsv deleted file mode 100644 index fa3e2f34..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-0966t2q0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-0966t2q0,Evening Exchange,00:00:06;18,00:00:13;22,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-10jsxngk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-10jsxngk.tsv deleted file mode 100644 index bac04b5b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-10jsxngk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-10jsxngk,Evening Exchange,00:00:34;08,00:00:44;07,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-13905s74.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-13905s74.tsv deleted file mode 100644 index c1f36c5b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-13905s74.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-13905s74,Evening Exchange,00:00:04;21,00:00:13;07,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-30prr83h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-30prr83h.tsv deleted file mode 100644 index 754ebe06..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-30prr83h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-30prr83h,Evening Exchange,00:00:06;01,00:00:11;26,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-31cjt22h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-31cjt22h.tsv deleted file mode 100644 index 4d642bed..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-31cjt22h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-31cjt22h,Evening Exchange,00:00:05;23,00:00:17;05,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-3331zh63.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-3331zh63.tsv deleted file mode 100644 index ef9c835e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-3331zh63.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-3331zh63,Evening Exchange,00:00:08;20,00:00:17;02,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-34sj3xzh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-34sj3xzh.tsv deleted file mode 100644 index fa157087..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-34sj3xzh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-34sj3xzh,Evening Exchange,00:00:09;26,00:00:19;25,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-38w9gntx.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-38w9gntx.tsv deleted file mode 100644 index 7a1775fc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-38w9gntx.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-38w9gntx,Evening Exchange,00:00:14;05,00:00:56;13,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-472v72kc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-472v72kc.tsv deleted file mode 100644 index 808a6ba4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-472v72kc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-472v72kc,Evening Exchange,00:00:34;27,00:00:54;26,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-60cvdv8f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-60cvdv8f.tsv deleted file mode 100644 index 1947efd6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-60cvdv8f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-60cvdv8f,Evening Exchange,00:00:09;11,00:00:21;28,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-68kd582n.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-68kd582n.tsv deleted file mode 100644 index 09e06e49..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-68kd582n.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-68kd582n,Evening Exchange,00:00:05;17,00:00:12;27,typed,digital,key-value pairs,background animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-741rnhtq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-741rnhtq.tsv deleted file mode 100644 index 84d82c09..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-741rnhtq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-741rnhtq,Evening Exchange,00:00:32;16,00:00:45;20,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-848pk8hf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-848pk8hf.tsv deleted file mode 100644 index f86f1d96..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-293-848pk8hf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-293-848pk8hf,Evening Exchange,00:00:34;29,00:00:44;28,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-03cz8wl6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-03cz8wl6.tsv deleted file mode 100644 index 1fd416f4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-03cz8wl6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-03cz8wl6,Up Close with Cathy Unruh,00:00:05;24,00:00:13;12,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-04rjdg2h.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-04rjdg2h.tsv deleted file mode 100644 index 0e4483f5..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-04rjdg2h.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-04rjdg2h,Sun Coast Business Forum,00:00:05;11,00:00:08;10,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-074tmqt8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-074tmqt8.tsv deleted file mode 100644 index 09b66b58..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-074tmqt8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-074tmqt8,Up Close with Cathy Unruh,00:00:05;01,00:00:12;29,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-11xd26h5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-11xd26h5.tsv deleted file mode 100644 index 0020269a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-11xd26h5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-11xd26h5,Up Close with Cathy Unruh,00:00:15;15,00:00:25;14,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-13lw6ngj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-13lw6ngj.tsv deleted file mode 100644 index 9bf413d7..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-13lw6ngj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-13lw6ngj,Up Close with Cathy Unruh,00:00:05;16,00:00:13;15,typed,digital,free text,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-24jm66h7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-24jm66h7.tsv deleted file mode 100644 index f05b1d19..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-24jm66h7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-24jm66h7,Up Close with Cathy Unruh,00:00:05;03,00:00:13;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-28ncjx9j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-28ncjx9j.tsv deleted file mode 100644 index ba361e05..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-28ncjx9j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-28ncjx9j,Up Close with Cathy Unruh,00:00:12;17,00:00:17;21,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp4z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp4z.tsv deleted file mode 100644 index 20e5c038..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp4z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-29b5mp4z,Sun Coast Business Forum,00:00:05;17,00:00:13;16,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp5p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp5p.tsv deleted file mode 100644 index d8bc5ad6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mp5p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-29b5mp5p,Sun Coast Business Forum,00:00:04;26,00:00:12;24,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mpzb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mpzb.tsv deleted file mode 100644 index 2b087134..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-29b5mpzb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-29b5mpzb,Up Close with Cathy Unruh,00:00:25;00,00:00:32;28,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-300zpfvm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-300zpfvm.tsv deleted file mode 100644 index 147c513f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-300zpfvm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-300zpfvm,Sun Coast Business Forum,00:00:10;24,00:00:18;22,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx5z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx5z.tsv deleted file mode 100644 index 0979e327..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx5z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-31qftx5z,Sun Coast Business Forum,00:00:05;09,00:00:13;17,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx7d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx7d.tsv deleted file mode 100644 index e9a21b2d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-31qftx7d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-31qftx7d,Sun Coast Business Forum,00:00:06;04,00:00:14;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zgm4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zgm4.tsv deleted file mode 100644 index b61fe13f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zgm4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-3331zgm4,Sun Coast Business Forum,00:00:05;15,00:00:13;14,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zh3z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zh3z.tsv deleted file mode 100644 index 12dcb48a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3331zh3z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-3331zh3z,Up Close with Cathy Unruh,00:00:09;07,00:00:14;06,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-343r25h9.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-343r25h9.tsv deleted file mode 100644 index 8c8fea7f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-343r25h9.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-343r25h9,Up Close with Cathy Unruh,00:00:10;14,00:00:15;13,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-36tx99km.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-36tx99km.tsv deleted file mode 100644 index d461b2ef..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-36tx99km.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-36tx99km,Up Close with Cathy Unruh,00:00:05;03,00:00:13;02,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjwj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjwj.tsv deleted file mode 100644 index bf58d4b4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjwj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-3976hjwj,Up Close with Cathy Unruh,00:00:06;23,00:00:14;22,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjz0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjz0.tsv deleted file mode 100644 index 153057e1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-3976hjz0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-3976hjz0,Up Close with Cathy Unruh,00:00:15;09,00:00:25;08,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-43nvx4bk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-43nvx4bk.tsv deleted file mode 100644 index 0800650d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-43nvx4bk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-43nvx4bk,Sun Coast Business Forum,00:00:25;05,00:00:33;03,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-48ffbldb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-48ffbldb.tsv deleted file mode 100644 index 3963fa0d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-48ffbldb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-48ffbldb,Up Close with Cathy Unruh,00:00:05;04,00:00:13;03,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-52w3r6lw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-52w3r6lw.tsv deleted file mode 100644 index 049d1577..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-52w3r6lw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-52w3r6lw,Up Close with Cathy Unruh,00:00:09;15,00:00:14;14,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55l90bhr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55l90bhr.tsv deleted file mode 100644 index 7862b2f0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55l90bhr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-55l90bhr,Up Close with Cathy Unruh,00:00:19;17,00:00:29;16,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55m90c8c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55m90c8c.tsv deleted file mode 100644 index 01bb08cb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-55m90c8c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-55m90c8c,Up Close with Cathy Unruh,00:00:04;17,00:00:12;15,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-569324rj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-569324rj.tsv deleted file mode 100644 index 8c6d74bb..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-569324rj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-569324rj,Up Close with Cathy Unruh,00:00:05;03,00:00:13;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd1l.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd1l.tsv deleted file mode 100644 index 7abed3b3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd1l.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-61rfjd1l,Up Close with Cathy Unruh,00:00:05;12,00:00:13;11,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd9d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd9d.tsv deleted file mode 100644 index 277ce50b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-61rfjd9d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-61rfjd9d,Up Close with Cathy Unruh,00:00:15;04,00:00:25;03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n2mj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n2mj.tsv deleted file mode 100644 index f7ff18ca..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n2mj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-62s4n2mj,Sun Coast Business Forum,00:00:05;03,00:00:13;02,typed,digital,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n3bf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n3bf.tsv deleted file mode 100644 index fd02f943..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-62s4n3bf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-62s4n3bf,Up Close with Cathy Unruh,00:00:09;27,00:00:19;26,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-65h9w7mn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-65h9w7mn.tsv deleted file mode 100644 index d8ea706c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-65h9w7mn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-65h9w7mn,Up Close with Cathy Unruh,00:00:15;03,00:00:25;02,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-719kdcsm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-719kdcsm.tsv deleted file mode 100644 index e0680941..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-719kdcsm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-719kdcsm,Up Close with Cathy Unruh,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-720cg4wt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-720cg4wt.tsv deleted file mode 100644 index 3fa06861..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-720cg4wt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-720cg4wt,Sun Coast Business Forum,00:00:05;08,00:00:15;09,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-72b8h1rh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-72b8h1rh.tsv deleted file mode 100644 index 565d3d4f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-72b8h1rh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-72b8h1rh,Sun Coast Business Forum,00:00:30;13,00:00:33;14,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-73bzkqbw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-73bzkqbw.tsv deleted file mode 100644 index f06b208b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-73bzkqbw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-73bzkqbw,Sun Coast Business Forum,00:00:05;23,00:00:08;20,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-7634tvj7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-7634tvj7.tsv deleted file mode 100644 index e88b0ac1..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-7634tvj7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-7634tvj7,Sun Coast Business Forum,00:00:25;02,00:00:33;01,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-76f1vrn0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-76f1vrn0.tsv deleted file mode 100644 index 73aa35b8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-76f1vrn0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-76f1vrn0,Up Close with Cathy Unruh,00:00:15;10,00:00:25;09,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-784j1746.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-784j1746.tsv deleted file mode 100644 index e53ca588..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-784j1746.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-784j1746,Up Close with Cathy Unruh,00:00:04;16,00:00:19;15,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-78gf23pp.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-78gf23pp.tsv deleted file mode 100644 index 35b18aad..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-78gf23pp.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-78gf23pp,Up Close with Cathy Unruh,00:00:15;17,00:00:25;16,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg7z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg7z.tsv deleted file mode 100644 index 5ca5cb37..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg7z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-83kwhg7z,Sun Coast Business Forum,00:00:04;13,00:00:12;12,typed,digital,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg8p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg8p.tsv deleted file mode 100644 index ef203939..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83kwhg8p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-83kwhg8p,Sun Coast Business Forum,00:00:04;18,00:00:12;17,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83xsjcn7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83xsjcn7.tsv deleted file mode 100644 index d7d8b66e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-83xsjcn7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-83xsjcn7,Up Close with Cathy Unruh,00:00:15;04,00:00:25;03,typed,digital,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-89d51ncg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-89d51ncg.tsv deleted file mode 100644 index 0d7b0efa..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-89d51ncg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-89d51ncg,Up Close with Cathy Unruh,00:00:05;06,00:00:13;05,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-924b8scw.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-924b8scw.tsv deleted file mode 100644 index 96f66a2d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-924b8scw.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-924b8scw,Sun Coast Business Forum,00:00:05;06,00:00:13;05,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-92t4bjgj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-92t4bjgj.tsv deleted file mode 100644 index da9392fc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-92t4bjgj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-92t4bjgj,Sun Coast Business Forum,00:00:24;28,00:00:32;27,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-93ttf72k.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-93ttf72k.tsv deleted file mode 100644 index d2e27bff..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-93ttf72k.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-93ttf72k,Sun Coast Business Forum,00:00:06;03,00:00:14;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-95w6mkvh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-95w6mkvh.tsv deleted file mode 100644 index 88bef2a4..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-95w6mkvh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-95w6mkvh,Up Close with Cathy Unruh,00:00:06;28,00:00:14;28,typed,digital,key-value pairs,background animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-9673ng3q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-9673ng3q.tsv deleted file mode 100644 index e51d263f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-9673ng3q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-9673ng3q,Sun Coast Business Forum,00:00:05;14,00:00:13;17,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-98mcvqxc.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-98mcvqxc.tsv deleted file mode 100644 index 19c7f46a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-322-98mcvqxc.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-322-98mcvqxc,Sun Coast Business Forum,00:00:05;18,00:00:13;17,typed,digital,key-value pairs,countdown; animation diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-0322868j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-0322868j.tsv deleted file mode 100644 index 8397523d..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-0322868j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-0322868j,Wall Street Week,00:00:37;00,00:00:51;02,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-150gbd75.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-150gbd75.tsv deleted file mode 100644 index 0d51fb31..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-150gbd75.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-150gbd75,Wall Street Week,00:00:11;00,00:00:29;09,typeed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-16pzgvnd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-16pzgvnd.tsv deleted file mode 100644 index 26058be0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-16pzgvnd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-16pzgvnd,Wall Street Week,00:00:20;20,00:00:32;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-20sqvk0z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-20sqvk0z.tsv deleted file mode 100644 index d9ea8f9c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-20sqvk0z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-20sqvk0z,Wall Street Week,00:00:25;01,00:00:42;10,typed,digital,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-25k99270.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-25k99270.tsv deleted file mode 100644 index f0a857c2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-25k99270.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-25k99270,Wall Street Week,00:00:16;08,00:00:33;09,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-28nck2pq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-28nck2pq.tsv deleted file mode 100644 index e34c8672..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-28nck2pq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-28nck2pq,Wall Street Week,00:00:20;16,00:00:32;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-30prrfj6.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-30prrfj6.tsv deleted file mode 100644 index 929e82bc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-30prrfj6.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-30prrfj6,Wall Street Week,00:00:20;08,00:00:30;29,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-34sj440v.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-34sj440v.tsv deleted file mode 100644 index e8b5ff05..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-34sj440v.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-34sj440v,Wall Street Week,00:00:20;18,00:00:32;26,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-35t76v43.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-35t76v43.tsv deleted file mode 100644 index aeba504b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-35t76v43.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-35t76v43,Wall Street Week,00:00:20;02,00:00:32;22,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-37hqc8bh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-37hqc8bh.tsv deleted file mode 100644 index 29c0746a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-37hqc8bh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-37hqc8bh,Wall Street Week,00:00:20;26,00:00:33;03,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-44pk10gn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-44pk10gn.tsv deleted file mode 100644 index 1d6dc2dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-44pk10gn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-44pk10gn,Wall Street Week,00:00:20;22,00:00:33;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-57np5x9q.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-57np5x9q.tsv deleted file mode 100644 index 67b34641..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-57np5x9q.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-57np5x9q,Wall Street Week,00:00:20;03,00:00:32;10,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-59189f7b.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-59189f7b.tsv deleted file mode 100644 index 9d28d768..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-59189f7b.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-59189f7b,Wall Street Week,00:00:21;07,00:00:33;07,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-601zd3mb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-601zd3mb.tsv deleted file mode 100644 index 3ead0ef9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-601zd3mb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-601zd3mb,Wall Street Week,00:00:17;10,00:00:33;04,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-612ngsdn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-612ngsdn.tsv deleted file mode 100644 index 893917c6..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-612ngsdn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-612ngsdn,Wall Street Week,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-63fxq1nn.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-63fxq1nn.tsv deleted file mode 100644 index 2ba87bdc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-63fxq1nn.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-63fxq1nn,Wall Street Week,00:00:20;20,00:00:32;28,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-8605qwd7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-8605qwd7.tsv deleted file mode 100644 index 076c5eba..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-8605qwd7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-8605qwd7,Wall Street Week,00:00:20;20,00:00:32;21,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-881jx8bt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-881jx8bt.tsv deleted file mode 100644 index 7cfa2cee..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-881jx8bt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-881jx8bt,Wall Street Week,00:00:20;29,00:00:33;01,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-94hmh6pk.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-94hmh6pk.tsv deleted file mode 100644 index 51b3c909..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-94hmh6pk.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-94hmh6pk,Wall Street Week,00:00:15;10,00:00:27;23,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-9995xntg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-9995xntg.tsv deleted file mode 100644 index 4e298ab2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-394-9995xntg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-394-9995xntg,Wall Street Week,00:00:02;14,00:00:14;19,typed,digital,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-009w13fb.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-009w13fb.tsv deleted file mode 100644 index 95549e09..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-009w13fb.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-009w13fb,Art's the Thing,00:00:06;11,00:00:24;04,typed,digital?,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-074tmwc8.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-074tmwc8.tsv deleted file mode 100644 index afcbd171..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-074tmwc8.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-074tmwc8,Art's the Thing,00:00:41;03,00:01:05;15,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-10wpzpt5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-10wpzpt5.tsv deleted file mode 100644 index 33887f2a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-10wpzpt5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-10wpzpt5,Art's the Thing,00:00:40;14,00:01:07;03,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-13zs7qh0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-13zs7qh0.tsv deleted file mode 100644 index 700bb068..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-13zs7qh0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-13zs7qh0,Art's the Thing,00:00:40;27,00:01:17;18,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-14nk9bkf.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-14nk9bkf.tsv deleted file mode 100644 index 89d33528..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-14nk9bkf.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-14nk9bkf,Carolina Journal,00:00:04;22,00:00:47;23,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-16pzgq2f.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-16pzgq2f.tsv deleted file mode 100644 index ff4b44a0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-16pzgq2f.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-16pzgq2f,Carolina Journal,00:00:05;02,00:00:28;25,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-171vhkmr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-171vhkmr.tsv deleted file mode 100644 index 27d6cf2f..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-171vhkmr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-171vhkmr,Carolina Journal,00:00:05;01,00:00:29;00,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-17qnkc9c.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-17qnkc9c.tsv deleted file mode 100644 index 46b57d14..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-17qnkc9c.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-17qnkc9c,Carolina Journal,00:00:05;07,00:00:32;24,typed,digital?,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-214mwjjg.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-214mwjjg.tsv deleted file mode 100644 index 910d132b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-214mwjjg.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-214mwjjg,Art's the Thing,00:00:04;25,00:00:30;18,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21ghx61z.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21ghx61z.tsv deleted file mode 100644 index ecb8eea9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21ghx61z.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-21ghx61z,Carolina Journal,00:00:05;25,00:00:35;23,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21tdz99t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21tdz99t.tsv deleted file mode 100644 index 730a5f78..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-21tdz99t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-21tdz99t,Art's the Thing,00:00:06;04,00:00:40;17,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-33dz0cwr.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-33dz0cwr.tsv deleted file mode 100644 index c839d27c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-33dz0cwr.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-33dz0cwr,Carolina Journal,00:00:04;29,00:00:32;22,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-34fn32g7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-34fn32g7.tsv deleted file mode 100644 index 3d52e5cc..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-34fn32g7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-34fn32g7,Carolina Journal,00:00:00;00,00:00:14;28,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-35gb5r1d.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-35gb5r1d.tsv deleted file mode 100644 index c37256c0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-35gb5r1d.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-35gb5r1d,Carolina Journal,00:00:05;03,00:00:29;04,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-39k3jfhm.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-39k3jfhm.tsv deleted file mode 100644 index 6cf56ea9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-39k3jfhm.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-39k3jfhm,Carolina Journal,00:00:06;01,00:00:33;13,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-48sbchtd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-48sbchtd.tsv deleted file mode 100644 index e52e1266..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-48sbchtd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-48sbchtd,Carolina Journal,00:00:06;19,00:00:37;22,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-569324rv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-569324rv.tsv deleted file mode 100644 index beba1e83..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-569324rv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-569324rv,Carolina Journal,00:00:06;17,00:00:29;15,typed,digital?,key-value pairs,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-579s4tcv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-579s4tcv.tsv deleted file mode 100644 index 6e53ac42..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-579s4tcv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-579s4tcv,Carolina Journal,00:00:05;01,00:00:35;21,typed,digital?,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrngt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrngt.tsv deleted file mode 100644 index 4ac98128..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrngt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-644qrngt,Carolina Journal,00:00:04;28,00:00:24;08,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrnhh.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrnhh.tsv deleted file mode 100644 index a29d1d48..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-644qrnhh.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-644qrnhh,Carolina Journal,00:00:04;28,00:00:27;08,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-655dvb4p.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-655dvb4p.tsv deleted file mode 100644 index cb86e3b8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-655dvb4p.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-655dvb4p,Carolina Journal,00:00:05;06,00:00:28;13,typed,digital?,free text,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-708w9q63.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-708w9q63.tsv deleted file mode 100644 index b2850e6e..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-708w9q63.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-708w9q63,Carolina Journal,00:00:05;25,00:00:29;16,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-7634tvxz.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-7634tvxz.tsv deleted file mode 100644 index 7f26d495..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-7634tvxz.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-7634tvxz,Carolina Journal,00:00:05;07,00:00:33;24,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-78tb30hd.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-78tb30hd.tsv deleted file mode 100644 index 354fd1f9..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-78tb30hd.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-78tb30hd,Carolina Journal,00:00:05;25,00:00:34;01,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-816m97tj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-816m97tj.tsv deleted file mode 100644 index cd36bcb2..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-816m97tj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-816m97tj,Carolina Journal,00:00:05;15,00:00:32;20,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-84mkm5br.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-84mkm5br.tsv deleted file mode 100644 index 990ce390..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-84mkm5br.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-84mkm5br,Carolina Journal,00:00:05;07,00:00:32;28,typed,digital?,free text,countdown diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-881jx339.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-881jx339.tsv deleted file mode 100644 index 659271ef..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-41-881jx339.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-41-881jx339,Carolina Journal,no slate,no slate,,,, diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-032281c4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-032281c4.tsv deleted file mode 100644 index 6d3e5136..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-032281c4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-032281c4,Woman,00:00:05;08,00:00:19;08,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-11xd26xt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-11xd26xt.tsv deleted file mode 100644 index cfa9d35a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-11xd26xt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-11xd26xt,Woman,00:00:05;10,00:00:11;27,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-19f4qtzt.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-19f4qtzt.tsv deleted file mode 100644 index 91190c45..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-19f4qtzt.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-19f4qtzt,Woman,00:00:04;25,00:00:20;00,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-23hx3j34.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-23hx3j34.tsv deleted file mode 100644 index 37361d85..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-23hx3j34.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-23hx3j34,Woman,00:00:06;04,00:00:23;20,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-2683bnv7.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-2683bnv7.tsv deleted file mode 100644 index 3fa95e48..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-2683bnv7.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-2683bnv7,Woman,00:00:05;25,00:00:15;00,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-30bvqccj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-30bvqccj.tsv deleted file mode 100644 index ef301548..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-30bvqccj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-30bvqccj,Woman,00:00:05;15,00:00:14;09,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-34fn32xq.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-34fn32xq.tsv deleted file mode 100644 index 8f08e355..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-34fn32xq.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-34fn32xq,Woman,00:00:05;09,00:00:15;12,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-37vmd08g.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-37vmd08g.tsv deleted file mode 100644 index 29a18528..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-37vmd08g.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-37vmd08g,Woman,00:00:05;02,00:00:21;01,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-48sbchx0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-48sbchx0.tsv deleted file mode 100644 index 12ee66dd..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-48sbchx0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-48sbchx0,Woman,00:00:05;12,00:00:16;03,fixed,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49g4f9z1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49g4f9z1.tsv deleted file mode 100644 index 3287eab0..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49g4f9z1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-49g4f9z1,Woman,00:00:06;11,00:00:15;18,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49t1g6kv.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49t1g6kv.tsv deleted file mode 100644 index 1ad8000c..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-49t1g6kv.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-49t1g6kv,Woman,00:00:05;08,00:00:15;09,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-558czgg5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-558czgg5.tsv deleted file mode 100644 index 7778343a..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-558czgg5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-558czgg5,Woman,00:00:04;29,00:00:20;16,handwriting,recorded,boxes to fill in,background movement diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-65v6x4b5.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-65v6x4b5.tsv deleted file mode 100644 index 0fba1906..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-65v6x4b5.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-65v6x4b5,Woman,00:00:05;16,00:00:14;26,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-708w9q47.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-708w9q47.tsv deleted file mode 100644 index b2b19423..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-708w9q47.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-708w9q47,Woman,00:00:05;11,00:00:14;27,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74cnpdn4.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74cnpdn4.tsv deleted file mode 100644 index 2a7924f8..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74cnpdn4.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-74cnpdn4,Woman,00:00:05;15,00:00:19;18,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74qjq9nj.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74qjq9nj.tsv deleted file mode 100644 index bce0fbb3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-74qjq9nj.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-74qjq9nj,Woman,00:00:05;13,00:00:13;21,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-881jx33t.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-881jx33t.tsv deleted file mode 100644 index 167afd29..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-881jx33t.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-881jx33t,Woman,00:00:00;00,00:00:05;04,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-902z3f9j.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-902z3f9j.tsv deleted file mode 100644 index 311b6957..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-902z3f9j.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-902z3f9j,Woman,00:00:05;25,00:00:16;13,handwriting,recorded (and very out of focus),key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-90dv4bd1.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-90dv4bd1.tsv deleted file mode 100644 index 4b9135b3..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-90dv4bd1.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-90dv4bd1,Woman,00:00:05;12,00:00:15;27,handwriting,recorded,key-value pairs,no diff --git a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-988gttr0.tsv b/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-988gttr0.tsv deleted file mode 100644 index ffa91e6b..00000000 --- a/january-slates/golds/aapb-collaboration-7/cpb-aacip-81-988gttr0.tsv +++ /dev/null @@ -1,2 +0,0 @@ -GUID,Series/Group,Slate Start,Slate End,Writing Types,Recorded/Digital,format of most of the information,Anything moving on screen during slate? -cpb-aacip-81-988gttr0,Woman,00:00:05;10,00:00:15;14,handwriting,recorded,boxes to fill in,no diff --git a/january-slates/golds/cpb-aacip-129-000003cx.tsv b/january-slates/golds/cpb-aacip-129-000003cx.tsv new file mode 100644 index 00000000..d4d74d3a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-000003cx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-000003cx North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-000003dn.tsv b/january-slates/golds/cpb-aacip-129-000003dn.tsv new file mode 100644 index 00000000..d203af89 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-000003dn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-000003dn North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-009w0zrj.tsv b/january-slates/golds/cpb-aacip-129-009w0zrj.tsv new file mode 100644 index 00000000..20d60e64 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-009w0zrj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-009w0zrj North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-009w108r.tsv b/january-slates/golds/cpb-aacip-129-009w108r.tsv new file mode 100644 index 00000000..30fe2341 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-009w108r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-009w108r North Carolina Now 00:00:05.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-009w109g.tsv b/january-slates/golds/cpb-aacip-129-009w109g.tsv new file mode 100644 index 00000000..77f10ca9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-009w109g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-009w109g North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-00ns1w7z.tsv b/january-slates/golds/cpb-aacip-129-00ns1w7z.tsv new file mode 100644 index 00000000..16314fed --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-00ns1w7z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-00ns1w7z North Carolina Now 00:00:05.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-00ns1w8p.tsv b/january-slates/golds/cpb-aacip-129-00ns1w8p.tsv new file mode 100644 index 00000000..6b5a8e43 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-00ns1w8p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-00ns1w8p North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-00ns1w9d.tsv b/january-slates/golds/cpb-aacip-129-00ns1w9d.tsv new file mode 100644 index 00000000..f773d0ec --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-00ns1w9d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-00ns1w9d North Carolina Now 00:00:06.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-010p2rqj.tsv b/january-slates/golds/cpb-aacip-129-010p2rqj.tsv new file mode 100644 index 00000000..de147726 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-010p2rqj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-010p2rqj North Carolina Now 00:00:04.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-010p2s01.tsv b/january-slates/golds/cpb-aacip-129-010p2s01.tsv new file mode 100644 index 00000000..d606ed09 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-010p2s01.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-010p2s01 North Carolina Now 00:00:06.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-010p2s1r.tsv b/january-slates/golds/cpb-aacip-129-010p2s1r.tsv new file mode 100644 index 00000000..c79ac911 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-010p2s1r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-010p2s1r North Carolina Now 00:00:03.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-01bk3p94.tsv b/january-slates/golds/cpb-aacip-129-01bk3p94.tsv new file mode 100644 index 00000000..8b4b2c6b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01bk3p94.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01bk3p94 North Carolina Now 00:00:08.000 00:00:40.000 t True boxes to fill in yes animation diff --git a/january-slates/golds/cpb-aacip-129-01bk3pck.tsv b/january-slates/golds/cpb-aacip-129-01bk3pck.tsv new file mode 100644 index 00000000..b516d289 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01bk3pck.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01bk3pck North Carolina Now 00:00:04.000 00:00:08.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-01bk3pd9.tsv b/january-slates/golds/cpb-aacip-129-01bk3pd9.tsv new file mode 100644 index 00000000..564ddc85 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01bk3pd9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01bk3pd9 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-01bk3pf1.tsv b/january-slates/golds/cpb-aacip-129-01bk3pf1.tsv new file mode 100644 index 00000000..00ec4074 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01bk3pf1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01bk3pf1 North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-01pg4jn8.tsv b/january-slates/golds/cpb-aacip-129-01pg4jn8.tsv new file mode 100644 index 00000000..3cbc52b5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01pg4jn8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01pg4jn8 North Carolina Now 00:00:04.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-01pg4jp0.tsv b/january-slates/golds/cpb-aacip-129-01pg4jp0.tsv new file mode 100644 index 00000000..c1b7c552 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-01pg4jp0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-01pg4jp0 North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-021c5drw.tsv b/january-slates/golds/cpb-aacip-129-021c5drw.tsv new file mode 100644 index 00000000..1b37688e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-021c5drw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-021c5drw North Carolina Now 00:00:08.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86b5v.tsv b/january-slates/golds/cpb-aacip-129-02c86b5v.tsv new file mode 100644 index 00000000..8515a6d0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86b5v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86b5v North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86b6k.tsv b/january-slates/golds/cpb-aacip-129-02c86b6k.tsv new file mode 100644 index 00000000..c222b704 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86b6k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86b6k North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86b79.tsv b/january-slates/golds/cpb-aacip-129-02c86b79.tsv new file mode 100644 index 00000000..c3ba40df --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86b79.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86b79 North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86bpq.tsv b/january-slates/golds/cpb-aacip-129-02c86bpq.tsv new file mode 100644 index 00000000..35e23ac4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86bpq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86bpq North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86bqf.tsv b/january-slates/golds/cpb-aacip-129-02c86bqf.tsv new file mode 100644 index 00000000..eb23c252 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86bqf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86bqf North Carolina Now 00:00:04.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86br5.tsv b/january-slates/golds/cpb-aacip-129-02c86br5.tsv new file mode 100644 index 00000000..a22441fe --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86br5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86br5 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02c86bsw.tsv b/january-slates/golds/cpb-aacip-129-02c86bsw.tsv new file mode 100644 index 00000000..1e376a0e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02c86bsw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02c86bsw North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02q57728.tsv b/january-slates/golds/cpb-aacip-129-02q57728.tsv new file mode 100644 index 00000000..657422d6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02q57728.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02q57728 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02q577f7.tsv b/january-slates/golds/cpb-aacip-129-02q577f7.tsv new file mode 100644 index 00000000..b44b88d7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02q577f7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02q577f7 North Carolina Now 00:00:07.000 00:00:27.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-02q577gz.tsv b/january-slates/golds/cpb-aacip-129-02q577gz.tsv new file mode 100644 index 00000000..63e38eb0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-02q577gz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-02q577gz North Carolina Now 00:00:05.000 00:00:29.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0322848r.tsv b/january-slates/golds/cpb-aacip-129-0322848r.tsv new file mode 100644 index 00000000..d334424a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0322848r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0322848r North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0322849g.tsv b/january-slates/golds/cpb-aacip-129-0322849g.tsv new file mode 100644 index 00000000..6e8cab45 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0322849g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0322849g North Carolina Now 00:00:05.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-032284b6.tsv b/january-slates/golds/cpb-aacip-129-032284b6.tsv new file mode 100644 index 00000000..257a73b2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-032284b6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-032284b6 North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-032284cx.tsv b/january-slates/golds/cpb-aacip-129-032284cx.tsv new file mode 100644 index 00000000..8a996d5c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-032284cx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-032284cx North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-032284dn.tsv b/january-slates/golds/cpb-aacip-129-032284dn.tsv new file mode 100644 index 00000000..5007cbdd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-032284dn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-032284dn North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-032284fc.tsv b/january-slates/golds/cpb-aacip-129-032284fc.tsv new file mode 100644 index 00000000..e6d58bfd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-032284fc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-032284fc North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03cz91m0.tsv b/january-slates/golds/cpb-aacip-129-03cz91m0.tsv new file mode 100644 index 00000000..aa35d356 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03cz91m0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03cz91m0 North Carolina Now 00:00:04.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03cz91nq.tsv b/january-slates/golds/cpb-aacip-129-03cz91nq.tsv new file mode 100644 index 00000000..2cd2c39e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03cz91nq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03cz91nq North Carolina Now 00:00:06.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03cz91pf.tsv b/january-slates/golds/cpb-aacip-129-03cz91pf.tsv new file mode 100644 index 00000000..c282cb0c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03cz91pf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03cz91pf North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03qv9w9q.tsv b/january-slates/golds/cpb-aacip-129-03qv9w9q.tsv new file mode 100644 index 00000000..cd986b72 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03qv9w9q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03qv9w9q North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03qv9wbf.tsv b/january-slates/golds/cpb-aacip-129-03qv9wbf.tsv new file mode 100644 index 00000000..a30206bd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03qv9wbf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03qv9wbf North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-03qv9wc5.tsv b/january-slates/golds/cpb-aacip-129-03qv9wc5.tsv new file mode 100644 index 00000000..95e3ebc3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-03qv9wc5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-03qv9wc5 North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-042rbs7d.tsv b/january-slates/golds/cpb-aacip-129-042rbs7d.tsv new file mode 100644 index 00000000..ecaa9d05 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-042rbs7d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-042rbs7d North Carolina Now 00:00:05.170 00:00:12.050 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-042rbs84.tsv b/january-slates/golds/cpb-aacip-129-042rbs84.tsv new file mode 100644 index 00000000..0950bb3d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-042rbs84.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-042rbs84 North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-042rbsvf.tsv b/january-slates/golds/cpb-aacip-129-042rbsvf.tsv new file mode 100644 index 00000000..286b9956 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-042rbsvf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-042rbsvf North Carolina Now 00:00:06.000 00:00:39.000 t True boxes to fill in no features disappears from slate at 00:00:31 mark diff --git a/january-slates/golds/cpb-aacip-129-042rbsw5.tsv b/january-slates/golds/cpb-aacip-129-042rbsw5.tsv new file mode 100644 index 00000000..a115d056 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-042rbsw5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-042rbsw5 North Carolina Now 00:00:06.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-042rbsxw.tsv b/january-slates/golds/cpb-aacip-129-042rbsxw.tsv new file mode 100644 index 00000000..ea5ca808 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-042rbsxw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-042rbsxw North Carolina Now 00:00:06.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04dncnzh.tsv b/january-slates/golds/cpb-aacip-129-04dncnzh.tsv new file mode 100644 index 00000000..fd18be34 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04dncnzh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04dncnzh North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04dncpfb.tsv b/january-slates/golds/cpb-aacip-129-04dncpfb.tsv new file mode 100644 index 00000000..1b9cdee2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04dncpfb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04dncpfb North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk17.tsv b/january-slates/golds/cpb-aacip-129-04rjdk17.tsv new file mode 100644 index 00000000..3df3cbe7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk17.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk17 North Carolina Now 00:00:23.000 00:00:54.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk2z.tsv b/january-slates/golds/cpb-aacip-129-04rjdk2z.tsv new file mode 100644 index 00000000..f2e326a5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk2z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk2z North Carolina Now 00:00:03.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk3p.tsv b/january-slates/golds/cpb-aacip-129-04rjdk3p.tsv new file mode 100644 index 00000000..57e65884 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk3p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk3p North Carolina Now 00:00:06.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk4d.tsv b/january-slates/golds/cpb-aacip-129-04rjdk4d.tsv new file mode 100644 index 00000000..37ced3de --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk4d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk4d North Carolina Now 00:00:06.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk54.tsv b/january-slates/golds/cpb-aacip-129-04rjdk54.tsv new file mode 100644 index 00000000..b23aa03b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk54.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk54 North Carolina Now 00:00:03.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-04rjdk6v.tsv b/january-slates/golds/cpb-aacip-129-04rjdk6v.tsv new file mode 100644 index 00000000..64933d32 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-04rjdk6v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-04rjdk6v North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-053ffgdb.tsv b/january-slates/golds/cpb-aacip-129-053ffgdb.tsv new file mode 100644 index 00000000..f6e1741f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-053ffgdb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-053ffgdb North Carolina Now 00:00:05.000 00:00:27.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-053ffgrk.tsv b/january-slates/golds/cpb-aacip-129-053ffgrk.tsv new file mode 100644 index 00000000..c9983906 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-053ffgrk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-053ffgrk North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-053ffgs9.tsv b/january-slates/golds/cpb-aacip-129-053ffgs9.tsv new file mode 100644 index 00000000..0401567b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-053ffgs9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-053ffgs9 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-053ffgt1.tsv b/january-slates/golds/cpb-aacip-129-053ffgt1.tsv new file mode 100644 index 00000000..648e98f6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-053ffgt1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-053ffgt1 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05fbgbzt.tsv b/january-slates/golds/cpb-aacip-129-05fbgbzt.tsv new file mode 100644 index 00000000..2e306c94 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05fbgbzt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05fbgbzt North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05fbgcbg.tsv b/january-slates/golds/cpb-aacip-129-05fbgcbg.tsv new file mode 100644 index 00000000..d760d2e3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05fbgcbg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05fbgcbg North Carolina Now 00:00:05.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05fbgcc6.tsv b/january-slates/golds/cpb-aacip-129-05fbgcc6.tsv new file mode 100644 index 00000000..478de94d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05fbgcc6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05fbgcc6 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05fbgcdx.tsv b/january-slates/golds/cpb-aacip-129-05fbgcdx.tsv new file mode 100644 index 00000000..30728471 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05fbgcdx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05fbgcdx North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05s7h80t.tsv b/january-slates/golds/cpb-aacip-129-05s7h80t.tsv new file mode 100644 index 00000000..1c6d74e6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05s7h80t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05s7h80t North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05s7h81j.tsv b/january-slates/golds/cpb-aacip-129-05s7h81j.tsv new file mode 100644 index 00000000..63899948 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05s7h81j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05s7h81j North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-05s7h828.tsv b/january-slates/golds/cpb-aacip-129-05s7h828.tsv new file mode 100644 index 00000000..55ac742e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-05s7h828.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-05s7h828 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0644j42q.tsv b/january-slates/golds/cpb-aacip-129-0644j42q.tsv new file mode 100644 index 00000000..0844267f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0644j42q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0644j42q North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0644j4kk.tsv b/january-slates/golds/cpb-aacip-129-0644j4kk.tsv new file mode 100644 index 00000000..27a384c8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0644j4kk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0644j4kk North Carolina Now 00:00:03.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06g1k1vz.tsv b/january-slates/golds/cpb-aacip-129-06g1k1vz.tsv new file mode 100644 index 00000000..34b0845e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06g1k1vz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06g1k1vz North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06g1k28b.tsv b/january-slates/golds/cpb-aacip-129-06g1k28b.tsv new file mode 100644 index 00000000..2ab90297 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06g1k28b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06g1k28b North Carolina Now 00:00:04.000 00:00:24.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06g1k292.tsv b/january-slates/golds/cpb-aacip-129-06g1k292.tsv new file mode 100644 index 00000000..5c073d1d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06g1k292.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06g1k292 North Carolina Now 00:00:07.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06g1k2bs.tsv b/january-slates/golds/cpb-aacip-129-06g1k2bs.tsv new file mode 100644 index 00000000..84805013 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06g1k2bs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06g1k2bs North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06g1k2ch.tsv b/january-slates/golds/cpb-aacip-129-06g1k2ch.tsv new file mode 100644 index 00000000..7961a1f9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06g1k2ch.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06g1k2ch North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkwx2.tsv b/january-slates/golds/cpb-aacip-129-06sxkwx2.tsv new file mode 100644 index 00000000..0d4f0bb9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkwx2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkwx2 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkwzs.tsv b/january-slates/golds/cpb-aacip-129-06sxkwzs.tsv new file mode 100644 index 00000000..1af7a3f4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkwzs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkwzs North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkxdw.tsv b/january-slates/golds/cpb-aacip-129-06sxkxdw.tsv new file mode 100644 index 00000000..cdfbb0c6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkxdw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkxdw North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkxfm.tsv b/january-slates/golds/cpb-aacip-129-06sxkxfm.tsv new file mode 100644 index 00000000..fb9d0e2d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkxfm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkxfm North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkxgb.tsv b/january-slates/golds/cpb-aacip-129-06sxkxgb.tsv new file mode 100644 index 00000000..61b2634d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkxgb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkxgb North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in part of video featured for a few moments diff --git a/january-slates/golds/cpb-aacip-129-06sxkxh2.tsv b/january-slates/golds/cpb-aacip-129-06sxkxh2.tsv new file mode 100644 index 00000000..2b824ff7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkxh2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkxh2 North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-06sxkxjs.tsv b/january-slates/golds/cpb-aacip-129-06sxkxjs.tsv new file mode 100644 index 00000000..3dd0371a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-06sxkxjs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-06sxkxjs North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmv5n.tsv b/january-slates/golds/cpb-aacip-129-074tmv5n.tsv new file mode 100644 index 00000000..469da5cd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmv5n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmv5n North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmv6c.tsv b/january-slates/golds/cpb-aacip-129-074tmv6c.tsv new file mode 100644 index 00000000..e3bd9228 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmv6c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmv6c North Carolina Now 00:00:02.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmv73.tsv b/january-slates/golds/cpb-aacip-129-074tmv73.tsv new file mode 100644 index 00000000..9f73bd57 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmv73.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmv73 North Carolina Now 00:00:05.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmv8t.tsv b/january-slates/golds/cpb-aacip-129-074tmv8t.tsv new file mode 100644 index 00000000..c6e5aa1a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmv8t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmv8t North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmv9j.tsv b/january-slates/golds/cpb-aacip-129-074tmv9j.tsv new file mode 100644 index 00000000..501bcc0e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmv9j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmv9j North Carolina Now 00:00:04.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmvb8.tsv b/january-slates/golds/cpb-aacip-129-074tmvb8.tsv new file mode 100644 index 00000000..df4747c7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmvb8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmvb8 North Carolina Now 00:00:03.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-074tmvc0.tsv b/january-slates/golds/cpb-aacip-129-074tmvc0.tsv new file mode 100644 index 00000000..7ef6e93e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-074tmvc0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-074tmvc0 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07gqnr7p.tsv b/january-slates/golds/cpb-aacip-129-07gqnr7p.tsv new file mode 100644 index 00000000..f0de24b9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07gqnr7p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07gqnr7p North Carolina Now 00:00:08.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07gqnr8d.tsv b/january-slates/golds/cpb-aacip-129-07gqnr8d.tsv new file mode 100644 index 00000000..3fdce7d1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07gqnr8d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07gqnr8d North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07tmpmmj.tsv b/january-slates/golds/cpb-aacip-129-07tmpmmj.tsv new file mode 100644 index 00000000..e7e57f42 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07tmpmmj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07tmpmmj North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07tmpmn8.tsv b/january-slates/golds/cpb-aacip-129-07tmpmn8.tsv new file mode 100644 index 00000000..7eb2597a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07tmpmn8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07tmpmn8 North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07tmpmp0.tsv b/january-slates/golds/cpb-aacip-129-07tmpmp0.tsv new file mode 100644 index 00000000..5c33169e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07tmpmp0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07tmpmp0 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-07tmpmqq.tsv b/january-slates/golds/cpb-aacip-129-07tmpmqq.tsv new file mode 100644 index 00000000..6221fc84 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-07tmpmqq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-07tmpmqq North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-085hqhbw.tsv b/january-slates/golds/cpb-aacip-129-085hqhbw.tsv new file mode 100644 index 00000000..f73ba84f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-085hqhbw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-085hqhbw North Carolina Now 00:00:04.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-085hqhcm.tsv b/january-slates/golds/cpb-aacip-129-085hqhcm.tsv new file mode 100644 index 00000000..2a3d121b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-085hqhcm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-085hqhcm North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-085hqhdb.tsv b/january-slates/golds/cpb-aacip-129-085hqhdb.tsv new file mode 100644 index 00000000..a96b359f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-085hqhdb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-085hqhdb North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-085hqhf2.tsv b/january-slates/golds/cpb-aacip-129-085hqhf2.tsv new file mode 100644 index 00000000..7addaf65 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-085hqhf2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-085hqhf2 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrc8b.tsv b/january-slates/golds/cpb-aacip-129-08hdrc8b.tsv new file mode 100644 index 00000000..514deadd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrc8b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrc8b North Carolina Now 00:00:04.140 00:00:29.050 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrcn9.tsv b/january-slates/golds/cpb-aacip-129-08hdrcn9.tsv new file mode 100644 index 00000000..ce7c8225 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrcn9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrcn9 North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrcp1.tsv b/january-slates/golds/cpb-aacip-129-08hdrcp1.tsv new file mode 100644 index 00000000..64bd8e67 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrcp1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrcp1 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrcqr.tsv b/january-slates/golds/cpb-aacip-129-08hdrcqr.tsv new file mode 100644 index 00000000..1dfd10fe --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrcqr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrcqr North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrcrg.tsv b/january-slates/golds/cpb-aacip-129-08hdrcrg.tsv new file mode 100644 index 00000000..03df1bc5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrcrg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrcrg North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrctx.tsv b/january-slates/golds/cpb-aacip-129-08hdrctx.tsv new file mode 100644 index 00000000..c4f415b5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrctx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrctx North Carolina Now 00:00:05.000 00:00:35.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08hdrcvn.tsv b/january-slates/golds/cpb-aacip-129-08hdrcvn.tsv new file mode 100644 index 00000000..af585fe7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08hdrcvn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08hdrcvn North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s8dt.tsv b/january-slates/golds/cpb-aacip-129-08v9s8dt.tsv new file mode 100644 index 00000000..aa8e9a60 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s8dt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s8dt North Carolina Now 00:00:04.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s91j.tsv b/january-slates/golds/cpb-aacip-129-08v9s91j.tsv new file mode 100644 index 00000000..4e320694 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s91j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s91j North Carolina Now 00:00:04.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s928.tsv b/january-slates/golds/cpb-aacip-129-08v9s928.tsv new file mode 100644 index 00000000..d606bc0e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s928.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s928 North Carolina Now 00:00:06.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s930.tsv b/january-slates/golds/cpb-aacip-129-08v9s930.tsv new file mode 100644 index 00000000..b1b91be5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s930.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s930 North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s94q.tsv b/january-slates/golds/cpb-aacip-129-08v9s94q.tsv new file mode 100644 index 00000000..a74b0d5b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s94q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s94q North Carolina Now 00:00:07.000 00:00:24.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-08v9s95f.tsv b/january-slates/golds/cpb-aacip-129-08v9s95f.tsv new file mode 100644 index 00000000..af45ef26 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-08v9s95f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-08v9s95f North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t5qg.tsv b/january-slates/golds/cpb-aacip-129-0966t5qg.tsv new file mode 100644 index 00000000..003f0ce6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t5qg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t5qg North Carolina Now 00:00:04.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t64v.tsv b/january-slates/golds/cpb-aacip-129-0966t64v.tsv new file mode 100644 index 00000000..4ae67de4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t64v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t64v North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t65k.tsv b/january-slates/golds/cpb-aacip-129-0966t65k.tsv new file mode 100644 index 00000000..eea7c853 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t65k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t65k North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t669.tsv b/january-slates/golds/cpb-aacip-129-0966t669.tsv new file mode 100644 index 00000000..856add37 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t669.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t669 North Carolina Now 00:00:01.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t671.tsv b/january-slates/golds/cpb-aacip-129-0966t671.tsv new file mode 100644 index 00000000..9ba3e526 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t671.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t671 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-0966t68r.tsv b/january-slates/golds/cpb-aacip-129-0966t68r.tsv new file mode 100644 index 00000000..b51721db --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-0966t68r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-0966t68r North Carolina Now 00:00:04.000 00:00:23.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09j3v318.tsv b/january-slates/golds/cpb-aacip-129-09j3v318.tsv new file mode 100644 index 00000000..84f71d08 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09j3v318.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09j3v318 North Carolina Now NO NO t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09j3v320.tsv b/january-slates/golds/cpb-aacip-129-09j3v320.tsv new file mode 100644 index 00000000..0d594b12 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09j3v320.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09j3v320 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09j3v33q.tsv b/january-slates/golds/cpb-aacip-129-09j3v33q.tsv new file mode 100644 index 00000000..86a2cea5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09j3v33q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09j3v33q North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09j3v34f.tsv b/january-slates/golds/cpb-aacip-129-09j3v34f.tsv new file mode 100644 index 00000000..6eac020c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09j3v34f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09j3v34f North Carolina Now 00:00:05.000 00:00:29.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09w0vzcr.tsv b/january-slates/golds/cpb-aacip-129-09w0vzcr.tsv new file mode 100644 index 00000000..b1507666 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09w0vzcr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09w0vzcr North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-09w0vzdg.tsv b/january-slates/golds/cpb-aacip-129-09w0vzdg.tsv new file mode 100644 index 00000000..2a3c7e56 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-09w0vzdg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-09w0vzdg North Carolina Now 00:00:00.000 00:00:08.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-106wwvmc.tsv b/january-slates/golds/cpb-aacip-129-106wwvmc.tsv new file mode 100644 index 00000000..bff2edf7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-106wwvmc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-106wwvmc North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-106wwvn3.tsv b/january-slates/golds/cpb-aacip-129-106wwvn3.tsv new file mode 100644 index 00000000..626d8981 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-106wwvn3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-106wwvn3 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-106wwvpt.tsv b/january-slates/golds/cpb-aacip-129-106wwvpt.tsv new file mode 100644 index 00000000..d43e186c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-106wwvpt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-106wwvpt North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10jsxqr5.tsv b/january-slates/golds/cpb-aacip-129-10jsxqr5.tsv new file mode 100644 index 00000000..e8382031 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10jsxqr5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10jsxqr5 North Carolina Now 00:00:06.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10wpzmxc.tsv b/january-slates/golds/cpb-aacip-129-10wpzmxc.tsv new file mode 100644 index 00000000..df8db3a4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10wpzmxc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10wpzmxc North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10wpzmz3.tsv b/january-slates/golds/cpb-aacip-129-10wpzmz3.tsv new file mode 100644 index 00000000..e9d76be8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10wpzmz3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10wpzmz3 North Carolina Now 00:00:03.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10wpznbr.tsv b/january-slates/golds/cpb-aacip-129-10wpznbr.tsv new file mode 100644 index 00000000..75f9cfb2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10wpznbr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10wpznbr North Carolina Now 00:00:04.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10wpzncg.tsv b/january-slates/golds/cpb-aacip-129-10wpzncg.tsv new file mode 100644 index 00000000..aab80cb3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10wpzncg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10wpzncg North Carolina Now 00:00:04.210 00:00:13.160 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-10wpznd6.tsv b/january-slates/golds/cpb-aacip-129-10wpznd6.tsv new file mode 100644 index 00000000..82d5a131 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-10wpznd6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-10wpznd6 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-117m0hmm.tsv b/january-slates/golds/cpb-aacip-129-117m0hmm.tsv new file mode 100644 index 00000000..ebe58b1e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-117m0hmm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-117m0hmm North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-117m0hnb.tsv b/january-slates/golds/cpb-aacip-129-117m0hnb.tsv new file mode 100644 index 00000000..6a5e83c5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-117m0hnb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-117m0hnb North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-117m0hp2.tsv b/january-slates/golds/cpb-aacip-129-117m0hp2.tsv new file mode 100644 index 00000000..2dcf5a11 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-117m0hp2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-117m0hp2 North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11kh1dst.tsv b/january-slates/golds/cpb-aacip-129-11kh1dst.tsv new file mode 100644 index 00000000..58dadf34 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11kh1dst.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11kh1dst North Carolina Now 00:00:05.000 00:00:26.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11kh1dtj.tsv b/january-slates/golds/cpb-aacip-129-11kh1dtj.tsv new file mode 100644 index 00000000..c1419940 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11kh1dtj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11kh1dtj North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd29f5.tsv b/january-slates/golds/cpb-aacip-129-11xd29f5.tsv new file mode 100644 index 00000000..87f7ee21 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd29f5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd29f5 North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd29x9.tsv b/january-slates/golds/cpb-aacip-129-11xd29x9.tsv new file mode 100644 index 00000000..35898926 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd29x9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd29x9 North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd29z1.tsv b/january-slates/golds/cpb-aacip-129-11xd29z1.tsv new file mode 100644 index 00000000..6fe25e58 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd29z1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd29z1 North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd2b0f.tsv b/january-slates/golds/cpb-aacip-129-11xd2b0f.tsv new file mode 100644 index 00000000..84fe3cf9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd2b0f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd2b0f North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd2b15.tsv b/january-slates/golds/cpb-aacip-129-11xd2b15.tsv new file mode 100644 index 00000000..eb687266 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd2b15.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd2b15 North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in yes part of video in smaller box diff --git a/january-slates/golds/cpb-aacip-129-11xd2b2w.tsv b/january-slates/golds/cpb-aacip-129-11xd2b2w.tsv new file mode 100644 index 00000000..0d4ef45f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd2b2w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd2b2w North Carolina Now 00:00:04.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-11xd2b3m.tsv b/january-slates/golds/cpb-aacip-129-11xd2b3m.tsv new file mode 100644 index 00000000..6c9bfc7a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-11xd2b3m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-11xd2b3m North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936f9.tsv b/january-slates/golds/cpb-aacip-129-128936f9.tsv new file mode 100644 index 00000000..18e4ce1d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936f9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936f9 North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936g1.tsv b/january-slates/golds/cpb-aacip-129-128936g1.tsv new file mode 100644 index 00000000..c601c602 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936g1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936g1 North Carolina Now 00:00:04.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936hr.tsv b/january-slates/golds/cpb-aacip-129-128936hr.tsv new file mode 100644 index 00000000..86f04ca8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936hr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936hr North Carolina Now 00:00:04.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936jg.tsv b/january-slates/golds/cpb-aacip-129-128936jg.tsv new file mode 100644 index 00000000..75765bbc --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936jg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936jg North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936k6.tsv b/january-slates/golds/cpb-aacip-129-128936k6.tsv new file mode 100644 index 00000000..1436769c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936k6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936k6 North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-128936mx.tsv b/january-slates/golds/cpb-aacip-129-128936mx.tsv new file mode 100644 index 00000000..8ede7ce0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936mx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936mx North Carolina Now 00:00:05.000 00:00:09.000 t True boxes to fill in slight tape jog (movement) diff --git a/january-slates/golds/cpb-aacip-129-128936nn.tsv b/january-slates/golds/cpb-aacip-129-128936nn.tsv new file mode 100644 index 00000000..f7e81047 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-128936nn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-128936nn North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12m6433n.tsv b/january-slates/golds/cpb-aacip-129-12m6433n.tsv new file mode 100644 index 00000000..9a5e8bcb --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12m6433n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12m6433n North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12m6434c.tsv b/january-slates/golds/cpb-aacip-129-12m6434c.tsv new file mode 100644 index 00000000..1e2d16b7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12m6434c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12m6434c North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12m64353.tsv b/january-slates/golds/cpb-aacip-129-12m64353.tsv new file mode 100644 index 00000000..1d4b9d4c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12m64353.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12m64353 North Carolina Now 00:00:06.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12z35074.tsv b/january-slates/golds/cpb-aacip-129-12z35074.tsv new file mode 100644 index 00000000..3eada681 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12z35074.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12z35074 North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12z3508v.tsv b/january-slates/golds/cpb-aacip-129-12z3508v.tsv new file mode 100644 index 00000000..e2a950e8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12z3508v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12z3508v North Carolina Now 00:00:22.000 00:00:35.000 t True boxes to fill in some video before slate diff --git a/january-slates/golds/cpb-aacip-129-12z3509k.tsv b/january-slates/golds/cpb-aacip-129-12z3509k.tsv new file mode 100644 index 00000000..6cecd65d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12z3509k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12z3509k North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-12z350b9.tsv b/january-slates/golds/cpb-aacip-129-12z350b9.tsv new file mode 100644 index 00000000..31acd5ea --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-12z350b9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-12z350b9 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905vnm.tsv b/january-slates/golds/cpb-aacip-129-13905vnm.tsv new file mode 100644 index 00000000..5614eeed --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905vnm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905vnm North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905vpb.tsv b/january-slates/golds/cpb-aacip-129-13905vpb.tsv new file mode 100644 index 00000000..9f40a15f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905vpb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905vpb North Carolina Now 00:00:04.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905w20.tsv b/january-slates/golds/cpb-aacip-129-13905w20.tsv new file mode 100644 index 00000000..a684e5e8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905w20.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905w20 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905w3q.tsv b/january-slates/golds/cpb-aacip-129-13905w3q.tsv new file mode 100644 index 00000000..df7f8d7d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905w3q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905w3q North Carolina Now 00:00:06.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905w4f.tsv b/january-slates/golds/cpb-aacip-129-13905w4f.tsv new file mode 100644 index 00000000..926d2d37 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905w4f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905w4f North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13905w55.tsv b/january-slates/golds/cpb-aacip-129-13905w55.tsv new file mode 100644 index 00000000..a54ba894 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13905w55.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13905w55 North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13mw6rz4.tsv b/january-slates/golds/cpb-aacip-129-13mw6rz4.tsv new file mode 100644 index 00000000..1b641157 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13mw6rz4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13mw6rz4 North Carolina Now 00:00:04.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13mw6s0j.tsv b/january-slates/golds/cpb-aacip-129-13mw6s0j.tsv new file mode 100644 index 00000000..a01e464d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13mw6s0j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13mw6s0j North Carolina Now 00:00:05.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13mw6s18.tsv b/january-slates/golds/cpb-aacip-129-13mw6s18.tsv new file mode 100644 index 00000000..84bd6834 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13mw6s18.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13mw6s18 North Carolina Now 00:00:07.000 00:00:21.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13mw6s20.tsv b/january-slates/golds/cpb-aacip-129-13mw6s20.tsv new file mode 100644 index 00000000..24c40d30 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13mw6s20.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13mw6s20 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13mw6s3q.tsv b/january-slates/golds/cpb-aacip-129-13mw6s3q.tsv new file mode 100644 index 00000000..083df7b6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13mw6s3q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13mw6s3q North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-13zs7nrc.tsv b/january-slates/golds/cpb-aacip-129-13zs7nrc.tsv new file mode 100644 index 00000000..5c390d93 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-13zs7nrc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-13zs7nrc North Carolina Now 00:00:04.000 00:00:23.000 t True boxes to fill in yes animation (blinking 2) diff --git a/january-slates/golds/cpb-aacip-129-149p8j6x.tsv b/january-slates/golds/cpb-aacip-129-149p8j6x.tsv new file mode 100644 index 00000000..b24a1005 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8j6x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8j6x North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8jp2.tsv b/january-slates/golds/cpb-aacip-129-149p8jp2.tsv new file mode 100644 index 00000000..3f7737a9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8jp2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8jp2 North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8jqs.tsv b/january-slates/golds/cpb-aacip-129-149p8jqs.tsv new file mode 100644 index 00000000..b32c0de3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8jqs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8jqs North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8jrh.tsv b/january-slates/golds/cpb-aacip-129-149p8jrh.tsv new file mode 100644 index 00000000..ad680d8e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8jrh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8jrh North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8js7.tsv b/january-slates/golds/cpb-aacip-129-149p8js7.tsv new file mode 100644 index 00000000..8fbcfbee --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8js7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8js7 North Carolina Now 00:00:04.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8jtz.tsv b/january-slates/golds/cpb-aacip-129-149p8jtz.tsv new file mode 100644 index 00000000..f8008e00 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8jtz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8jtz North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-149p8jvp.tsv b/january-slates/golds/cpb-aacip-129-149p8jvp.tsv new file mode 100644 index 00000000..33a92e56 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-149p8jvp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-149p8jvp North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-150gbb9t.tsv b/january-slates/golds/cpb-aacip-129-150gbb9t.tsv new file mode 100644 index 00000000..ea2dc41b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-150gbb9t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-150gbb9t North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-15bcc6xr.tsv b/january-slates/golds/cpb-aacip-129-15bcc6xr.tsv new file mode 100644 index 00000000..fc4acd6d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-15bcc6xr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-15bcc6xr North Carolina Now 00:00:06.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-15p8d3jc.tsv b/january-slates/golds/cpb-aacip-129-15p8d3jc.tsv new file mode 100644 index 00000000..2adf48b7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-15p8d3jc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-15p8d3jc North Carolina Now 00:00:04.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-15p8d3vw.tsv b/january-slates/golds/cpb-aacip-129-15p8d3vw.tsv new file mode 100644 index 00000000..9b925023 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-15p8d3vw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-15p8d3vw North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1615f209.tsv b/january-slates/golds/cpb-aacip-129-1615f209.tsv new file mode 100644 index 00000000..fcc6e675 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1615f209.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1615f209 North Carolina Now 00:00:05.000 00:00:23.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1615f211.tsv b/january-slates/golds/cpb-aacip-129-1615f211.tsv new file mode 100644 index 00000000..1379f543 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1615f211.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1615f211 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1615f22r.tsv b/january-slates/golds/cpb-aacip-129-1615f22r.tsv new file mode 100644 index 00000000..d636cae7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1615f22r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1615f22r North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-16pzgsmw.tsv b/january-slates/golds/cpb-aacip-129-16pzgsmw.tsv new file mode 100644 index 00000000..9bfc594d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-16pzgsmw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-16pzgsmw North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhpcz.tsv b/january-slates/golds/cpb-aacip-129-171vhpcz.tsv new file mode 100644 index 00000000..316f7f56 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhpcz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhpcz North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhpz8.tsv b/january-slates/golds/cpb-aacip-129-171vhpz8.tsv new file mode 100644 index 00000000..d816703e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhpz8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhpz8 North Carolina Now 00:00:04.000 00:00:24.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhq0p.tsv b/january-slates/golds/cpb-aacip-129-171vhq0p.tsv new file mode 100644 index 00000000..17763a7e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhq0p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhq0p North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhq1d.tsv b/january-slates/golds/cpb-aacip-129-171vhq1d.tsv new file mode 100644 index 00000000..9268fbee --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhq1d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhq1d North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhq24.tsv b/january-slates/golds/cpb-aacip-129-171vhq24.tsv new file mode 100644 index 00000000..575175e0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhq24.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhq24 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-171vhq3v.tsv b/january-slates/golds/cpb-aacip-129-171vhq3v.tsv new file mode 100644 index 00000000..926b48f5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-171vhq3v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-171vhq3v North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17crjk7n.tsv b/january-slates/golds/cpb-aacip-129-17crjk7n.tsv new file mode 100644 index 00000000..98b22db7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17crjk7n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17crjk7n North Carolina Now 00:00:04.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17crjk8c.tsv b/january-slates/golds/cpb-aacip-129-17crjk8c.tsv new file mode 100644 index 00000000..723c21f1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17crjk8c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17crjk8c North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17crjk93.tsv b/january-slates/golds/cpb-aacip-129-17crjk93.tsv new file mode 100644 index 00000000..d29ad8a2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17crjk93.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17crjk93 North Carolina Now 00:00:05.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17crjkbt.tsv b/january-slates/golds/cpb-aacip-129-17crjkbt.tsv new file mode 100644 index 00000000..47999d3d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17crjkbt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17crjkbt North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17qnkgg9.tsv b/january-slates/golds/cpb-aacip-129-17qnkgg9.tsv new file mode 100644 index 00000000..d025bb92 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17qnkgg9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17qnkgg9 North Carolina Now 00:00:07.000 00:00:26.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17qnkgh1.tsv b/january-slates/golds/cpb-aacip-129-17qnkgh1.tsv new file mode 100644 index 00000000..34ee795d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17qnkgh1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17qnkgh1 North Carolina Now 00:00:06.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-17qnkgjr.tsv b/january-slates/golds/cpb-aacip-129-17qnkgjr.tsv new file mode 100644 index 00000000..eb7188a7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-17qnkgjr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-17qnkgjr North Carolina Now 00:00:06.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-182jmc2r.tsv b/january-slates/golds/cpb-aacip-129-182jmc2r.tsv new file mode 100644 index 00000000..51f338fe --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-182jmc2r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-182jmc2r North Carolina Now 00:00:05.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-182jmc3g.tsv b/january-slates/golds/cpb-aacip-129-182jmc3g.tsv new file mode 100644 index 00000000..1e528a4c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-182jmc3g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-182jmc3g North Carolina Now 00:00:00.000 00:00:02.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-182jmc46.tsv b/january-slates/golds/cpb-aacip-129-182jmc46.tsv new file mode 100644 index 00000000..4d0669a0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-182jmc46.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-182jmc46 North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-182jmc5x.tsv b/january-slates/golds/cpb-aacip-129-182jmc5x.tsv new file mode 100644 index 00000000..0ce61f95 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-182jmc5x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-182jmc5x North Carolina Now 00:00:00.000 00:00:05.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-18dfn8g1.tsv b/january-slates/golds/cpb-aacip-129-18dfn8g1.tsv new file mode 100644 index 00000000..f546407c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-18dfn8g1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-18dfn8g1 North Carolina Now 00:00:04.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-18rbp4wm.tsv b/january-slates/golds/cpb-aacip-129-18rbp4wm.tsv new file mode 100644 index 00000000..f6948ef3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-18rbp4wm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-18rbp4wm North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-18rbp4xb.tsv b/january-slates/golds/cpb-aacip-129-18rbp4xb.tsv new file mode 100644 index 00000000..4fb1d95a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-18rbp4xb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-18rbp4xb North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-18rbp4z2.tsv b/january-slates/golds/cpb-aacip-129-18rbp4z2.tsv new file mode 100644 index 00000000..1e0b8135 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-18rbp4z2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-18rbp4z2 North Carolina Now 00:00:05.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-18rbp50g.tsv b/january-slates/golds/cpb-aacip-129-18rbp50g.tsv new file mode 100644 index 00000000..390b4ca0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-18rbp50g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-18rbp50g North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1937q1sk.tsv b/january-slates/golds/cpb-aacip-129-1937q1sk.tsv new file mode 100644 index 00000000..2162aec9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1937q1sk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1937q1sk North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1937q1t9.tsv b/january-slates/golds/cpb-aacip-129-1937q1t9.tsv new file mode 100644 index 00000000..59c016ac --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1937q1t9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1937q1t9 North Carolina Now 00:00:06.000 00:00:39.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1937q1v1.tsv b/january-slates/golds/cpb-aacip-129-1937q1v1.tsv new file mode 100644 index 00000000..54c7073b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1937q1v1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1937q1v1 North Carolina Now 00:00:06.000 00:00:29.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1937q1wr.tsv b/january-slates/golds/cpb-aacip-129-1937q1wr.tsv new file mode 100644 index 00000000..dff8f50a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1937q1wr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1937q1wr North Carolina Now 00:00:04.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-1937q1xg.tsv b/january-slates/golds/cpb-aacip-129-1937q1xg.tsv new file mode 100644 index 00000000..80f41f6b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-1937q1xg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-1937q1xg North Carolina Now 00:00:04.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qxsh.tsv b/january-slates/golds/cpb-aacip-129-19f4qxsh.tsv new file mode 100644 index 00000000..923b497d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qxsh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qxsh North Carolina Now 00:00:04.000 00:00:26.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz20.tsv b/january-slates/golds/cpb-aacip-129-19f4qz20.tsv new file mode 100644 index 00000000..f84a1b04 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz20.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz20 North Carolina Now 00:00:04.000 00:00:28.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz3q.tsv b/january-slates/golds/cpb-aacip-129-19f4qz3q.tsv new file mode 100644 index 00000000..015aa9d4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz3q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz3q North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz4f.tsv b/january-slates/golds/cpb-aacip-129-19f4qz4f.tsv new file mode 100644 index 00000000..cf06b9f5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz4f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz4f North Carolina Now 00:00:04.290 00:00:14.030 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz55.tsv b/january-slates/golds/cpb-aacip-129-19f4qz55.tsv new file mode 100644 index 00000000..6d7894c2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz55.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz55 North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz6w.tsv b/january-slates/golds/cpb-aacip-129-19f4qz6w.tsv new file mode 100644 index 00000000..62a2d714 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz6w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz6w North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19f4qz7m.tsv b/january-slates/golds/cpb-aacip-129-19f4qz7m.tsv new file mode 100644 index 00000000..d754ef5a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19f4qz7m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19f4qz7m North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in yes animation (floating witch) diff --git a/january-slates/golds/cpb-aacip-129-19s1rtd4.tsv b/january-slates/golds/cpb-aacip-129-19s1rtd4.tsv new file mode 100644 index 00000000..02920c72 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19s1rtd4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19s1rtd4 North Carolina Now 00:00:05.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-19s1rtfv.tsv b/january-slates/golds/cpb-aacip-129-19s1rtfv.tsv new file mode 100644 index 00000000..cb4847e6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-19s1rtfv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-19s1rtfv North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqcz.tsv b/january-slates/golds/cpb-aacip-129-203xsqcz.tsv new file mode 100644 index 00000000..f5c630bf --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqcz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqcz North Carolina Now 00:00:04.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqdp.tsv b/january-slates/golds/cpb-aacip-129-203xsqdp.tsv new file mode 100644 index 00000000..31cc5b42 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqdp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqdp North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqfd.tsv b/january-slates/golds/cpb-aacip-129-203xsqfd.tsv new file mode 100644 index 00000000..99493a6c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqfd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqfd North Carolina Now 00:00:04.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqg4.tsv b/january-slates/golds/cpb-aacip-129-203xsqg4.tsv new file mode 100644 index 00000000..4ea8e3c3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqg4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqg4 North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqhv.tsv b/january-slates/golds/cpb-aacip-129-203xsqhv.tsv new file mode 100644 index 00000000..3cf5f9c6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqhv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqhv North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqjk.tsv b/january-slates/golds/cpb-aacip-129-203xsqjk.tsv new file mode 100644 index 00000000..1f3894f1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqjk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqjk North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-203xsqk9.tsv b/january-slates/golds/cpb-aacip-129-203xsqk9.tsv new file mode 100644 index 00000000..f34933ab --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-203xsqk9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-203xsqk9 North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-20fttm6x.tsv b/january-slates/golds/cpb-aacip-129-20fttm6x.tsv new file mode 100644 index 00000000..2a6eaf34 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-20fttm6x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-20fttm6x North Carolina Now 00:00:04.000 00:00:21.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-20fttm7n.tsv b/january-slates/golds/cpb-aacip-129-20fttm7n.tsv new file mode 100644 index 00000000..a869e251 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-20fttm7n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-20fttm7n North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-20fttm8c.tsv b/january-slates/golds/cpb-aacip-129-20fttm8c.tsv new file mode 100644 index 00000000..8336619c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-20fttm8c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-20fttm8c North Carolina Now 00:00:08.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-20fttm93.tsv b/january-slates/golds/cpb-aacip-129-20fttm93.tsv new file mode 100644 index 00000000..5d651637 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-20fttm93.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-20fttm93 North Carolina Now 00:00:05.000 00:00:24.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-20fttmbt.tsv b/january-slates/golds/cpb-aacip-129-20fttmbt.tsv new file mode 100644 index 00000000..8b95dae1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-20fttmbt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-20fttmbt North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-214mwcnc.tsv b/january-slates/golds/cpb-aacip-129-214mwcnc.tsv new file mode 100644 index 00000000..19acef28 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-214mwcnc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-214mwcnc North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-214mwcp3.tsv b/january-slates/golds/cpb-aacip-129-214mwcp3.tsv new file mode 100644 index 00000000..c6ecfe72 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-214mwcp3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-214mwcp3 North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-214mwcqt.tsv b/january-slates/golds/cpb-aacip-129-214mwcqt.tsv new file mode 100644 index 00000000..ebb0d21c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-214mwcqt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-214mwcqt North Carolina Now 00:00:04.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-214mwd7c.tsv b/january-slates/golds/cpb-aacip-129-214mwd7c.tsv new file mode 100644 index 00000000..42e78521 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-214mwd7c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-214mwd7c North Carolina Now 00:00:04.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-214mwd83.tsv b/january-slates/golds/cpb-aacip-129-214mwd83.tsv new file mode 100644 index 00000000..eff9a3f2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-214mwd83.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-214mwd83 North Carolina Now 00:00:05.290 00:00:14.280 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-21ghx8qd.tsv b/january-slates/golds/cpb-aacip-129-21ghx8qd.tsv new file mode 100644 index 00000000..bdcd11f7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-21ghx8qd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-21ghx8qd North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-21ghx967.tsv b/january-slates/golds/cpb-aacip-129-21ghx967.tsv new file mode 100644 index 00000000..789d8b40 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-21ghx967.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-21ghx967 North Carolina Now 00:00:08.000 00:00:27.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-21ghx97z.tsv b/january-slates/golds/cpb-aacip-129-21ghx97z.tsv new file mode 100644 index 00000000..5d70858f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-21ghx97z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-21ghx97z North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-21ghx98p.tsv b/january-slates/golds/cpb-aacip-129-21ghx98p.tsv new file mode 100644 index 00000000..03746728 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-21ghx98p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-21ghx98p North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-21tdz599.tsv b/january-slates/golds/cpb-aacip-129-21tdz599.tsv new file mode 100644 index 00000000..3da07b24 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-21tdz599.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-21tdz599 North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-225b02ch.tsv b/january-slates/golds/cpb-aacip-129-225b02ch.tsv new file mode 100644 index 00000000..d6947b3b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-225b02ch.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-225b02ch North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-225b02vn.tsv b/january-slates/golds/cpb-aacip-129-225b02vn.tsv new file mode 100644 index 00000000..38a5535d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-225b02vn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-225b02vn North Carolina Now 00:00:05.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22h70x8k.tsv b/january-slates/golds/cpb-aacip-129-22h70x8k.tsv new file mode 100644 index 00000000..1f1911fb --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22h70x8k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22h70x8k North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22h70xwm.tsv b/january-slates/golds/cpb-aacip-129-22h70xwm.tsv new file mode 100644 index 00000000..b6494dc1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22h70xwm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22h70xwm North Carolina Now 00:00:00.000 00:00:07.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22h70xxb.tsv b/january-slates/golds/cpb-aacip-129-22h70xxb.tsv new file mode 100644 index 00000000..320ad46e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22h70xxb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22h70xxb North Carolina Now 00:00:00.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22h70xz2.tsv b/january-slates/golds/cpb-aacip-129-22h70xz2.tsv new file mode 100644 index 00000000..cf3543de --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22h70xz2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22h70xz2 North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22h70z0g.tsv b/january-slates/golds/cpb-aacip-129-22h70z0g.tsv new file mode 100644 index 00000000..e5aeca51 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22h70z0g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22h70z0g North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22v41v37.tsv b/january-slates/golds/cpb-aacip-129-22v41v37.tsv new file mode 100644 index 00000000..bbed453c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22v41v37.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22v41v37 North Carolina Now 00:00:04.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-22v41vkc.tsv b/january-slates/golds/cpb-aacip-129-22v41vkc.tsv new file mode 100644 index 00000000..b4b03218 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22v41vkc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22v41vkc North Carolina Now 00:00:15.000 00:00:32.000 t True boxes to fill in no but slate fades out and back in (tape error?) diff --git a/january-slates/golds/cpb-aacip-129-22v41vm3.tsv b/january-slates/golds/cpb-aacip-129-22v41vm3.tsv new file mode 100644 index 00000000..b0abbb8d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-22v41vm3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-22v41vm3 North Carolina Now 00:00:05.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23612r2n.tsv b/january-slates/golds/cpb-aacip-129-23612r2n.tsv new file mode 100644 index 00000000..c04aa266 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23612r2n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23612r2n North Carolina Now 00:00:04.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23612r3c.tsv b/january-slates/golds/cpb-aacip-129-23612r3c.tsv new file mode 100644 index 00000000..5d4af6f1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23612r3c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23612r3c North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23612r43.tsv b/january-slates/golds/cpb-aacip-129-23612r43.tsv new file mode 100644 index 00000000..4b10fd6b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23612r43.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23612r43 North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23612r5t.tsv b/january-slates/golds/cpb-aacip-129-23612r5t.tsv new file mode 100644 index 00000000..2e041284 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23612r5t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23612r5t North Carolina Now 00:00:06.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23612r6j.tsv b/january-slates/golds/cpb-aacip-129-23612r6j.tsv new file mode 100644 index 00000000..2a623a28 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23612r6j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23612r6j North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23hx3ngb.tsv b/january-slates/golds/cpb-aacip-129-23hx3ngb.tsv new file mode 100644 index 00000000..a0efda1b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23hx3ngb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23hx3ngb North Carolina Now 00:00:04.000 00:00:07.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23vt4j3z.tsv b/january-slates/golds/cpb-aacip-129-23vt4j3z.tsv new file mode 100644 index 00000000..d3d77c7b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23vt4j3z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23vt4j3z North Carolina Now 00:00:07.000 00:00:45.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-23vt4j4p.tsv b/january-slates/golds/cpb-aacip-129-23vt4j4p.tsv new file mode 100644 index 00000000..84992d3c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-23vt4j4p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-23vt4j4p North Carolina Now 00:00:04.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24jm6b6v.tsv b/january-slates/golds/cpb-aacip-129-24jm6b6v.tsv new file mode 100644 index 00000000..c4651e2a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24jm6b6v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24jm6b6v North Carolina Now 00:00:01.000 00:00:08.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24jm6b7k.tsv b/january-slates/golds/cpb-aacip-129-24jm6b7k.tsv new file mode 100644 index 00000000..b522e5ce --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24jm6b7k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24jm6b7k North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24jm6b89.tsv b/january-slates/golds/cpb-aacip-129-24jm6b89.tsv new file mode 100644 index 00000000..4ba1cbdc --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24jm6b89.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24jm6b89 North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24wh75mr.tsv b/january-slates/golds/cpb-aacip-129-24wh75mr.tsv new file mode 100644 index 00000000..5e73fd3f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24wh75mr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24wh75mr North Carolina Now 00:00:05.000 00:00:08.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24wh75z0.tsv b/january-slates/golds/cpb-aacip-129-24wh75z0.tsv new file mode 100644 index 00000000..476cf4d0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24wh75z0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24wh75z0 North Carolina Now 00:00:05.000 00:00:24.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-24wh760d.tsv b/january-slates/golds/cpb-aacip-129-24wh760d.tsv new file mode 100644 index 00000000..55a2823d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-24wh760d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-24wh760d North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-257d82mw.tsv b/january-slates/golds/cpb-aacip-129-257d82mw.tsv new file mode 100644 index 00000000..392c3900 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-257d82mw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-257d82mw North Carolina Now 00:00:04.000 00:00:23.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-257d830j.tsv b/january-slates/golds/cpb-aacip-129-257d830j.tsv new file mode 100644 index 00000000..a6a463ab --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-257d830j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-257d830j North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-257d8318.tsv b/january-slates/golds/cpb-aacip-129-257d8318.tsv new file mode 100644 index 00000000..7e537163 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-257d8318.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-257d8318 North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no slate dissolves in after color bars diff --git a/january-slates/golds/cpb-aacip-129-25k9905r.tsv b/january-slates/golds/cpb-aacip-129-25k9905r.tsv new file mode 100644 index 00000000..9ceb929f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25k9905r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25k9905r North Carolina Now 00:00:07.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25k990kf.tsv b/january-slates/golds/cpb-aacip-129-25k990kf.tsv new file mode 100644 index 00000000..8bb2d9b3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25k990kf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25k990kf North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25k990m5.tsv b/january-slates/golds/cpb-aacip-129-25k990m5.tsv new file mode 100644 index 00000000..92c1ddaf --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25k990m5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25k990m5 North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25x69w02.tsv b/january-slates/golds/cpb-aacip-129-25x69w02.tsv new file mode 100644 index 00000000..e4323559 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25x69w02.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25x69w02 North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25x69w1s.tsv b/january-slates/golds/cpb-aacip-129-25x69w1s.tsv new file mode 100644 index 00000000..e3672a21 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25x69w1s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25x69w1s North Carolina Now 00:00:05.000 00:00:18.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25x69w2h.tsv b/january-slates/golds/cpb-aacip-129-25x69w2h.tsv new file mode 100644 index 00000000..5731a588 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25x69w2h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25x69w2h North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-25x69w37.tsv b/january-slates/golds/cpb-aacip-129-25x69w37.tsv new file mode 100644 index 00000000..300a537b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25x69w37.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25x69w37 North Carolina Now 00:00:06.000 00:00:22.000 t True boxes to fill in no but slate fades out and back in (tape error?) diff --git a/january-slates/golds/cpb-aacip-129-25x69w4z.tsv b/january-slates/golds/cpb-aacip-129-25x69w4z.tsv new file mode 100644 index 00000000..e1c42bce --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-25x69w4z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-25x69w4z North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2683brfx.tsv b/january-slates/golds/cpb-aacip-129-2683brfx.tsv new file mode 100644 index 00000000..f424c303 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2683brfx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2683brfx North Carolina Now 00:00:05.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2683brgn.tsv b/january-slates/golds/cpb-aacip-129-2683brgn.tsv new file mode 100644 index 00000000..c96ff73d --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2683brgn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2683brgn North Carolina Now 00:00:05.040 00:00:19.230 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2683brhc.tsv b/january-slates/golds/cpb-aacip-129-2683brhc.tsv new file mode 100644 index 00000000..fd10db11 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2683brhc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2683brhc North Carolina Now 00:00:05.100 00:00:20.180 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnq9.tsv b/january-slates/golds/cpb-aacip-129-26m0cnq9.tsv new file mode 100644 index 00000000..99c6cfa1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnq9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnq9 North Carolina Now 00:00:05.000 00:00:38.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnr1.tsv b/january-slates/golds/cpb-aacip-129-26m0cnr1.tsv new file mode 100644 index 00000000..c806441b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnr1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnr1 North Carolina Now 00:00:09.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnsr.tsv b/january-slates/golds/cpb-aacip-129-26m0cnsr.tsv new file mode 100644 index 00000000..672825d9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnsr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnsr North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cntg.tsv b/january-slates/golds/cpb-aacip-129-26m0cntg.tsv new file mode 100644 index 00000000..f6c7a058 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cntg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cntg North Carolina Now 00:00:04.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnv6.tsv b/january-slates/golds/cpb-aacip-129-26m0cnv6.tsv new file mode 100644 index 00000000..5c72bdfe --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnv6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnv6 North Carolina Now 00:00:06.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnwx.tsv b/january-slates/golds/cpb-aacip-129-26m0cnwx.tsv new file mode 100644 index 00000000..8060e85c --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnwx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnwx North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnxn.tsv b/january-slates/golds/cpb-aacip-129-26m0cnxn.tsv new file mode 100644 index 00000000..3bf13388 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnxn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnxn North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26m0cnzc.tsv b/january-slates/golds/cpb-aacip-129-26m0cnzc.tsv new file mode 100644 index 00000000..5a2dba5b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26m0cnzc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26m0cnzc North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26xwdj6f.tsv b/january-slates/golds/cpb-aacip-129-26xwdj6f.tsv new file mode 100644 index 00000000..702b90e3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26xwdj6f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26xwdj6f North Carolina Now 00:00:08.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26xwdj75.tsv b/january-slates/golds/cpb-aacip-129-26xwdj75.tsv new file mode 100644 index 00000000..85f8b3d6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26xwdj75.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26xwdj75 North Carolina Now 00:00:04.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-26xwdj8w.tsv b/january-slates/golds/cpb-aacip-129-26xwdj8w.tsv new file mode 100644 index 00000000..5d1e7dd1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-26xwdj8w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-26xwdj8w North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-278sfd92.tsv b/january-slates/golds/cpb-aacip-129-278sfd92.tsv new file mode 100644 index 00000000..06b7093a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-278sfd92.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-278sfd92 North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-278sfdn9.tsv b/january-slates/golds/cpb-aacip-129-278sfdn9.tsv new file mode 100644 index 00000000..9d0c7060 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-278sfdn9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-278sfdn9 North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-278sfdp1.tsv b/january-slates/golds/cpb-aacip-129-278sfdp1.tsv new file mode 100644 index 00000000..7ba59df2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-278sfdp1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-278sfdp1 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-278sfdqr.tsv b/january-slates/golds/cpb-aacip-129-278sfdqr.tsv new file mode 100644 index 00000000..3ed95e69 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-278sfdqr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-278sfdqr North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgb30.tsv b/january-slates/golds/cpb-aacip-129-27mpgb30.tsv new file mode 100644 index 00000000..e0dd55c4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgb30.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgb30 North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgb4q.tsv b/january-slates/golds/cpb-aacip-129-27mpgb4q.tsv new file mode 100644 index 00000000..2ecd2f7e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgb4q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgb4q North Carolina Now 00:00:04.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgb5f.tsv b/january-slates/golds/cpb-aacip-129-27mpgb5f.tsv new file mode 100644 index 00000000..7eae4f19 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgb5f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgb5f North Carolina Now 00:00:05.000 00:00:23.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgb65.tsv b/january-slates/golds/cpb-aacip-129-27mpgb65.tsv new file mode 100644 index 00000000..8170eb5e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgb65.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgb65 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgbmv.tsv b/january-slates/golds/cpb-aacip-129-27mpgbmv.tsv new file mode 100644 index 00000000..c50b45c4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgbmv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgbmv North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27mpgbnk.tsv b/january-slates/golds/cpb-aacip-129-27mpgbnk.tsv new file mode 100644 index 00000000..8a715ca6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27mpgbnk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27mpgbnk North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27zkh64m.tsv b/january-slates/golds/cpb-aacip-129-27zkh64m.tsv new file mode 100644 index 00000000..ac89d57a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27zkh64m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27zkh64m North Carolina Now 00:00:04.000 00:00:19.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27zkh6k1.tsv b/january-slates/golds/cpb-aacip-129-27zkh6k1.tsv new file mode 100644 index 00000000..5c61e560 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27zkh6k1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27zkh6k1 North Carolina Now 00:00:05.000 00:00:22.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-27zkh6mr.tsv b/january-slates/golds/cpb-aacip-129-27zkh6mr.tsv new file mode 100644 index 00000000..e4af801a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-27zkh6mr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-27zkh6mr North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-289gj39c.tsv b/january-slates/golds/cpb-aacip-129-289gj39c.tsv new file mode 100644 index 00000000..c3f5f26f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-289gj39c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-289gj39c North Carolina Now 00:00:04.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-289gj3pb.tsv b/january-slates/golds/cpb-aacip-129-289gj3pb.tsv new file mode 100644 index 00000000..073f3bcc --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-289gj3pb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-289gj3pb North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-28nck0px.tsv b/january-slates/golds/cpb-aacip-129-28nck0px.tsv new file mode 100644 index 00000000..40cb1f13 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-28nck0px.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-28nck0px North Carolina Now 00:00:05.000 00:00:10.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-28nck0qn.tsv b/january-slates/golds/cpb-aacip-129-28nck0qn.tsv new file mode 100644 index 00000000..78746e43 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-28nck0qn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-28nck0qn North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-28nck11v.tsv b/january-slates/golds/cpb-aacip-129-28nck11v.tsv new file mode 100644 index 00000000..d6b9e22b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-28nck11v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-28nck11v North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-28nck12k.tsv b/january-slates/golds/cpb-aacip-129-28nck12k.tsv new file mode 100644 index 00000000..3d312510 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-28nck12k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-28nck12k North Carolina Now 00:00:05.000 00:00:12.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-28nck139.tsv b/january-slates/golds/cpb-aacip-129-28nck139.tsv new file mode 100644 index 00000000..39a79af8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-28nck139.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-28nck139 North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwcw.tsv b/january-slates/golds/cpb-aacip-129-2908kwcw.tsv new file mode 100644 index 00000000..1dfcddfe --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwcw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwcw North Carolina Now 00:00:04.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwdm.tsv b/january-slates/golds/cpb-aacip-129-2908kwdm.tsv new file mode 100644 index 00000000..41dd89a0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwdm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwdm North Carolina Now 00:00:05.000 00:00:09.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwfb.tsv b/january-slates/golds/cpb-aacip-129-2908kwfb.tsv new file mode 100644 index 00000000..6d42f5bf --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwfb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwfb North Carolina Now 00:00:05.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwg2.tsv b/january-slates/golds/cpb-aacip-129-2908kwg2.tsv new file mode 100644 index 00000000..0e177bf6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwg2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwg2 North Carolina Now 00:00:05.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwhs.tsv b/january-slates/golds/cpb-aacip-129-2908kwhs.tsv new file mode 100644 index 00000000..0c01875e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwhs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwhs North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwjh.tsv b/january-slates/golds/cpb-aacip-129-2908kwjh.tsv new file mode 100644 index 00000000..0bdb7437 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwjh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwjh North Carolina Now 00:00:05.000 00:00:06.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-2908kwk7.tsv b/january-slates/golds/cpb-aacip-129-2908kwk7.tsv new file mode 100644 index 00000000..fec88c5e --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-2908kwk7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-2908kwk7 North Carolina Now 00:00:04.000 00:00:17.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5mscg.tsv b/january-slates/golds/cpb-aacip-129-29b5mscg.tsv new file mode 100644 index 00000000..f4ac35dd --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5mscg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5mscg North Carolina Now 00:00:05.000 00:00:16.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5msd6.tsv b/january-slates/golds/cpb-aacip-129-29b5msd6.tsv new file mode 100644 index 00000000..4fcb53a5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5msd6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5msd6 North Carolina Now 00:00:04.000 00:00:15.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5msfx.tsv b/january-slates/golds/cpb-aacip-129-29b5msfx.tsv new file mode 100644 index 00000000..77cce307 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5msfx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5msfx North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5mswb.tsv b/january-slates/golds/cpb-aacip-129-29b5mswb.tsv new file mode 100644 index 00000000..5022f659 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5mswb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5mswb North Carolina Now 00:00:04.000 00:00:25.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5msx2.tsv b/january-slates/golds/cpb-aacip-129-29b5msx2.tsv new file mode 100644 index 00000000..8bea54d8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5msx2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5msx2 North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29b5mszs.tsv b/january-slates/golds/cpb-aacip-129-29b5mszs.tsv new file mode 100644 index 00000000..150c6d81 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29b5mszs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29b5mszs North Carolina Now 00:00:04.000 00:00:14.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29p2nnzp.tsv b/january-slates/golds/cpb-aacip-129-29p2nnzp.tsv new file mode 100644 index 00000000..5a3ccf62 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29p2nnzp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29p2nnzp North Carolina Now 00:00:05.000 00:00:20.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29p2npc2.tsv b/january-slates/golds/cpb-aacip-129-29p2npc2.tsv new file mode 100644 index 00000000..1d3aa2e5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29p2npc2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29p2npc2 North Carolina Now 00:00:05.000 00:00:11.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-29p2npds.tsv b/january-slates/golds/cpb-aacip-129-29p2npds.tsv new file mode 100644 index 00000000..9a6ace87 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-29p2npds.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-29p2npds North Carolina Now 00:00:05.000 00:00:13.000 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-34sj422h.tsv b/january-slates/golds/cpb-aacip-129-34sj422h.tsv new file mode 100644 index 00000000..788ede5a --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-34sj422h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-34sj422h North Carolina Now 00:00:05.120 00:00:17.040 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-4947dhdh.tsv b/january-slates/golds/cpb-aacip-129-4947dhdh.tsv new file mode 100644 index 00000000..ce1b2182 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-4947dhdh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-4947dhdh North Carolina Now 00:00:04.180 00:00:07.250 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-60qrfv0q.tsv b/january-slates/golds/cpb-aacip-129-60qrfv0q.tsv new file mode 100644 index 00000000..3864bffb --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-60qrfv0q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-60qrfv0q North Carolina Now 00:00:05.070 00:00:27.110 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-66j1009t.tsv b/january-slates/golds/cpb-aacip-129-66j1009t.tsv new file mode 100644 index 00000000..ab33dc24 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-66j1009t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-66j1009t North Carolina Now 00:00:05.100 00:00:22.020 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-69z08wkv.tsv b/january-slates/golds/cpb-aacip-129-69z08wkv.tsv new file mode 100644 index 00000000..6f779c91 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-69z08wkv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-69z08wkv North Carolina Now 00:00:05.080 00:00:17.260 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-76f1vvrm.tsv b/january-slates/golds/cpb-aacip-129-76f1vvrm.tsv new file mode 100644 index 00000000..2bd13d92 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-76f1vvrm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-76f1vvrm North Carolina Now 00:00:05.130 00:00:09.240 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-76rxwqnr.tsv b/january-slates/golds/cpb-aacip-129-76rxwqnr.tsv new file mode 100644 index 00000000..13f65ba0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-76rxwqnr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-76rxwqnr North Carolina Now 00:00:04.290 00:00:13.140 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-78gf26qv.tsv b/january-slates/golds/cpb-aacip-129-78gf26qv.tsv new file mode 100644 index 00000000..063375f9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-78gf26qv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-78gf26qv North Carolina Now 00:00:05.170 00:00:17.140 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-83xsjgjh.tsv b/january-slates/golds/cpb-aacip-129-83xsjgjh.tsv new file mode 100644 index 00000000..88f49149 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-83xsjgjh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-83xsjgjh North Carolina Now 00:00:07.010 00:00:14.080 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-8605qtdf.tsv b/january-slates/golds/cpb-aacip-129-8605qtdf.tsv new file mode 100644 index 00000000..3b199ba2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-8605qtdf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-8605qtdf North Carolina Now 00:00:05.120 00:00:16.190 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-87pnw91c.tsv b/january-slates/golds/cpb-aacip-129-87pnw91c.tsv new file mode 100644 index 00000000..e600304f --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-87pnw91c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-87pnw91c North Carolina Now 00:00:05.100 00:00:17.280 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-89280vgh.tsv b/january-slates/golds/cpb-aacip-129-89280vgh.tsv new file mode 100644 index 00000000..5cc46d4b --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-89280vgh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-89280vgh North Carolina Now 00:00:04.120 00:00:13.060 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-129-91fj72nc.tsv b/january-slates/golds/cpb-aacip-129-91fj72nc.tsv new file mode 100644 index 00000000..8d3f97a0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-129-91fj72nc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-129-91fj72nc North Carolina Now 00:00:05.220 00:00:21.220 t True boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-131-0000003w.tsv b/january-slates/golds/cpb-aacip-131-0000003w.tsv new file mode 100644 index 00000000..be17d30e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-0000003w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-0000003w New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-00ns1s0n.tsv b/january-slates/golds/cpb-aacip-131-00ns1s0n.tsv new file mode 100644 index 00000000..0b92a3cb --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-00ns1s0n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-00ns1s0n New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-00ns1s1c.tsv b/january-slates/golds/cpb-aacip-131-00ns1s1c.tsv new file mode 100644 index 00000000..1914d272 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-00ns1s1c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-00ns1s1c New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-010p2ntg.tsv b/january-slates/golds/cpb-aacip-131-010p2ntg.tsv new file mode 100644 index 00000000..5bc711ea --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-010p2ntg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-010p2ntg New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-01bk3jj8.tsv b/january-slates/golds/cpb-aacip-131-01bk3jj8.tsv new file mode 100644 index 00000000..9238a0ac --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-01bk3jj8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-01bk3jj8 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-01bk3jk0.tsv b/january-slates/golds/cpb-aacip-131-01bk3jk0.tsv new file mode 100644 index 00000000..c111d96e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-01bk3jk0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-01bk3jk0 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-021c5bgj.tsv b/january-slates/golds/cpb-aacip-131-021c5bgj.tsv new file mode 100644 index 00000000..5108f4b0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-021c5bgj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-021c5bgj New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-02c8676b.tsv b/january-slates/golds/cpb-aacip-131-02c8676b.tsv new file mode 100644 index 00000000..b0b6b890 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-02c8676b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-02c8676b New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-02c86772.tsv b/january-slates/golds/cpb-aacip-131-02c86772.tsv new file mode 100644 index 00000000..b5899c59 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-02c86772.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-02c86772 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-032280xk.tsv b/january-slates/golds/cpb-aacip-131-032280xk.tsv new file mode 100644 index 00000000..8fc4614f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-032280xk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-032280xk New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-032280z9.tsv b/january-slates/golds/cpb-aacip-131-032280z9.tsv new file mode 100644 index 00000000..d0f40e93 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-032280z9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-032280z9 New York Now 00:00:00.000 00:00:04.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-03cz8wvg.tsv b/january-slates/golds/cpb-aacip-131-03cz8wvg.tsv new file mode 100644 index 00000000..3c0d45f9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-03cz8wvg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-03cz8wvg New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-03cz8ww6.tsv b/january-slates/golds/cpb-aacip-131-03cz8ww6.tsv new file mode 100644 index 00000000..054456ee --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-03cz8ww6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-03cz8ww6 New York Now 00:00:00.000 00:00:07.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-03cz8wxx.tsv b/january-slates/golds/cpb-aacip-131-03cz8wxx.tsv new file mode 100644 index 00000000..88dfef53 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-03cz8wxx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-03cz8wxx New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-06sxktcx.tsv b/january-slates/golds/cpb-aacip-131-06sxktcx.tsv new file mode 100644 index 00000000..fcac4f34 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-06sxktcx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-06sxktcx New York Now 00:00:00.000 00:00:04.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-06sxktdn.tsv b/january-slates/golds/cpb-aacip-131-06sxktdn.tsv new file mode 100644 index 00000000..6da90fef --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-06sxktdn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-06sxktdn New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-06sxktfc.tsv b/january-slates/golds/cpb-aacip-131-06sxktfc.tsv new file mode 100644 index 00000000..4c9f3aaf --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-06sxktfc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-06sxktfc New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-08v9s5g1.tsv b/january-slates/golds/cpb-aacip-131-08v9s5g1.tsv new file mode 100644 index 00000000..7b409c4b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-08v9s5g1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-08v9s5g1 New York Now 00:00:00.000 00:00:06.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-0966t2hw.tsv b/january-slates/golds/cpb-aacip-131-0966t2hw.tsv new file mode 100644 index 00000000..b1d806b0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-0966t2hw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-0966t2hw New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-11kh19k7.tsv b/january-slates/golds/cpb-aacip-131-11kh19k7.tsv new file mode 100644 index 00000000..184f6a2a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-11kh19k7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-11kh19k7 New York Now 00:00:26.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-11kh19mz.tsv b/january-slates/golds/cpb-aacip-131-11kh19mz.tsv new file mode 100644 index 00000000..c80d3051 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-11kh19mz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-11kh19mz New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-11xd2691.tsv b/january-slates/golds/cpb-aacip-131-11xd2691.tsv new file mode 100644 index 00000000..704d5ac3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-11xd2691.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-11xd2691 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12893358.tsv b/january-slates/golds/cpb-aacip-131-12893358.tsv new file mode 100644 index 00000000..31a29d9e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12893358.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12893358 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12m6403d.tsv b/january-slates/golds/cpb-aacip-131-12m6403d.tsv new file mode 100644 index 00000000..715f3a15 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12m6403d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12m6403d New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12m64044.tsv b/january-slates/golds/cpb-aacip-131-12m64044.tsv new file mode 100644 index 00000000..ecd6bb91 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12m64044.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12m64044 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12z34w2m.tsv b/january-slates/golds/cpb-aacip-131-12z34w2m.tsv new file mode 100644 index 00000000..400ba5c7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12z34w2m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12z34w2m New York Now 00:00:26.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12z34w3b.tsv b/january-slates/golds/cpb-aacip-131-12z34w3b.tsv new file mode 100644 index 00000000..9ed786ba --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12z34w3b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12z34w3b New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-12z34w42.tsv b/january-slates/golds/cpb-aacip-131-12z34w42.tsv new file mode 100644 index 00000000..c96e69c7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-12z34w42.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-12z34w42 New York Now 00:00:17.000 00:00:27.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-13mw6nqt.tsv b/january-slates/golds/cpb-aacip-131-13mw6nqt.tsv new file mode 100644 index 00000000..38cf3238 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-13mw6nqt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-13mw6nqt New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-150gb6zn.tsv b/january-slates/golds/cpb-aacip-131-150gb6zn.tsv new file mode 100644 index 00000000..d27b83c1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-150gb6zn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-150gb6zn New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-1615dwph.tsv b/january-slates/golds/cpb-aacip-131-1615dwph.tsv new file mode 100644 index 00000000..e429219d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-1615dwph.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-1615dwph New York Now 00:00:09.000 00:00:19.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-16pzgphg.tsv b/january-slates/golds/cpb-aacip-131-16pzgphg.tsv new file mode 100644 index 00000000..5b43943e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-16pzgphg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-16pzgphg New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-16pzgpj6.tsv b/january-slates/golds/cpb-aacip-131-16pzgpj6.tsv new file mode 100644 index 00000000..45adaceb --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-16pzgpj6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-16pzgpj6 New York Now 00:00:00.000 00:00:07.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-16pzgpkx.tsv b/january-slates/golds/cpb-aacip-131-16pzgpkx.tsv new file mode 100644 index 00000000..7f505c37 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-16pzgpkx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-16pzgpkx New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-18rbp1gp.tsv b/january-slates/golds/cpb-aacip-131-18rbp1gp.tsv new file mode 100644 index 00000000..6c307dba --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-18rbp1gp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-18rbp1gp New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-18rbp1hd.tsv b/january-slates/golds/cpb-aacip-131-18rbp1hd.tsv new file mode 100644 index 00000000..c12e68be --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-18rbp1hd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-18rbp1hd New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-19f4qtck.tsv b/january-slates/golds/cpb-aacip-131-19f4qtck.tsv new file mode 100644 index 00000000..4191d218 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-19f4qtck.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-19f4qtck New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-19f4qtd9.tsv b/january-slates/golds/cpb-aacip-131-19f4qtd9.tsv new file mode 100644 index 00000000..cc3fd26e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-19f4qtd9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-19f4qtd9 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-19s1rq6j.tsv b/january-slates/golds/cpb-aacip-131-19s1rq6j.tsv new file mode 100644 index 00000000..1ed9bd1e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-19s1rq6j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-19s1rq6j New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-203xsm4n.tsv b/january-slates/golds/cpb-aacip-131-203xsm4n.tsv new file mode 100644 index 00000000..b4430fb7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-203xsm4n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-203xsm4n New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-20fttgwg.tsv b/january-slates/golds/cpb-aacip-131-20fttgwg.tsv new file mode 100644 index 00000000..55b89da3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-20fttgwg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-20fttgwg New York Now 00:00:26.000 00:00:34.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-20fttgx6.tsv b/january-slates/golds/cpb-aacip-131-20fttgx6.tsv new file mode 100644 index 00000000..addddfa8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-20fttgx6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-20fttgx6 New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-20sqvcqf.tsv b/january-slates/golds/cpb-aacip-131-20sqvcqf.tsv new file mode 100644 index 00000000..d252b315 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-20sqvcqf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-20sqvcqf New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-214mw8h7.tsv b/january-slates/golds/cpb-aacip-131-214mw8h7.tsv new file mode 100644 index 00000000..5807848c --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-214mw8h7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-214mw8h7 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-22h70v81.tsv b/january-slates/golds/cpb-aacip-131-22h70v81.tsv new file mode 100644 index 00000000..14ceea01 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-22h70v81.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-22h70v81 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-22v41qzd.tsv b/january-slates/golds/cpb-aacip-131-22v41qzd.tsv new file mode 100644 index 00000000..cfc6c8f3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-22v41qzd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-22v41qzd New York Now 00:00:05.000 00:00:12.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-24wh7377.tsv b/january-slates/golds/cpb-aacip-131-24wh7377.tsv new file mode 100644 index 00000000..e78e0453 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-24wh7377.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-24wh7377 New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-25x69rnw.tsv b/january-slates/golds/cpb-aacip-131-25x69rnw.tsv new file mode 100644 index 00000000..bf184e10 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-25x69rnw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-25x69rnw New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-2683bnjv.tsv b/january-slates/golds/cpb-aacip-131-2683bnjv.tsv new file mode 100644 index 00000000..b661718b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-2683bnjv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-2683bnjv New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-2683bnkk.tsv b/january-slates/golds/cpb-aacip-131-2683bnkk.tsv new file mode 100644 index 00000000..7f71a375 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-2683bnkk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-2683bnkk New York Now 00:00:11.000 00:00:19.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-278sfb1q.tsv b/january-slates/golds/cpb-aacip-131-278sfb1q.tsv new file mode 100644 index 00000000..3eb9bcd8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-278sfb1q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-278sfb1q New York Now 00:00:17.000 00:00:27.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-27mpg719.tsv b/january-slates/golds/cpb-aacip-131-27mpg719.tsv new file mode 100644 index 00000000..c75741ac --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-27mpg719.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-27mpg719 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-28ncjwhd.tsv b/january-slates/golds/cpb-aacip-131-28ncjwhd.tsv new file mode 100644 index 00000000..cdbe57a3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-28ncjwhd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-28ncjwhd New York Now 00:00:12.000 00:00:18.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-29b5mpdz.tsv b/january-slates/golds/cpb-aacip-131-29b5mpdz.tsv new file mode 100644 index 00000000..da791103 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-29b5mpdz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-29b5mpdz New York Now 00:00:15.180 00:00:25.170 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-29b5mpfp.tsv b/january-slates/golds/cpb-aacip-131-29b5mpfp.tsv new file mode 100644 index 00000000..3d4bf26d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-29b5mpfp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-29b5mpfp New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-30bvqbxv.tsv b/january-slates/golds/cpb-aacip-131-30bvqbxv.tsv new file mode 100644 index 00000000..3fe29b84 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-30bvqbxv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-30bvqbxv New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-30prr7rt.tsv b/january-slates/golds/cpb-aacip-131-30prr7rt.tsv new file mode 100644 index 00000000..a3f24523 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-30prr7rt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-30prr7rt New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-311ns4m2.tsv b/january-slates/golds/cpb-aacip-131-311ns4m2.tsv new file mode 100644 index 00000000..52f6167d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-311ns4m2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-311ns4m2 New York Now 00:00:26.140 00:00:34.140 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-311ns4ns.tsv b/january-slates/golds/cpb-aacip-131-311ns4ns.tsv new file mode 100644 index 00000000..92482451 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-311ns4ns.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-311ns4ns New York Now 00:00:25.060 00:00:33.050 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-31cjt1mn.tsv b/january-slates/golds/cpb-aacip-131-31cjt1mn.tsv new file mode 100644 index 00000000..40361e6a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-31cjt1mn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-31cjt1mn New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-32d7wq3f.tsv b/january-slates/golds/cpb-aacip-131-32d7wq3f.tsv new file mode 100644 index 00000000..4a84042a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-32d7wq3f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-32d7wq3f New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-32d7wq45.tsv b/january-slates/golds/cpb-aacip-131-32d7wq45.tsv new file mode 100644 index 00000000..113e74be --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-32d7wq45.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-32d7wq45 New York Now 00:00:14.250 00:00:24.240 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-33dz0cpd.tsv b/january-slates/golds/cpb-aacip-131-33dz0cpd.tsv new file mode 100644 index 00000000..3d655e48 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-33dz0cpd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-33dz0cpd New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-33dz0cq4.tsv b/january-slates/golds/cpb-aacip-131-33dz0cq4.tsv new file mode 100644 index 00000000..a7dc5133 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-33dz0cq4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-33dz0cq4 New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-33dz0crv.tsv b/january-slates/golds/cpb-aacip-131-33dz0crv.tsv new file mode 100644 index 00000000..efaa684b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-33dz0crv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-33dz0crv New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-343r25bw.tsv b/january-slates/golds/cpb-aacip-131-343r25bw.tsv new file mode 100644 index 00000000..066b9964 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-343r25bw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-343r25bw New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-34sj3z42.tsv b/january-slates/golds/cpb-aacip-131-34sj3z42.tsv new file mode 100644 index 00000000..c84b21ff --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-34sj3z42.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-34sj3z42 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-34sj3z5s.tsv b/january-slates/golds/cpb-aacip-131-34sj3z5s.tsv new file mode 100644 index 00000000..da63f9be --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-34sj3z5s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-34sj3z5s New York Now 00:00:00.000 00:00:05.030 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-35t76mk3.tsv b/january-slates/golds/cpb-aacip-131-35t76mk3.tsv new file mode 100644 index 00000000..6f4ed012 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-35t76mk3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-35t76mk3 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-375tb64j.tsv b/january-slates/golds/cpb-aacip-131-375tb64j.tsv new file mode 100644 index 00000000..36d46471 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-375tb64j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-375tb64j New York Now 00:00:16.020 00:00:26.010 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-38w9gndg.tsv b/january-slates/golds/cpb-aacip-131-38w9gndg.tsv new file mode 100644 index 00000000..876ec290 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-38w9gndg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-38w9gndg New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-3976hj9f.tsv b/january-slates/golds/cpb-aacip-131-3976hj9f.tsv new file mode 100644 index 00000000..ccb57094 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-3976hj9f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-3976hj9f New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-40xpp0pm.tsv b/january-slates/golds/cpb-aacip-131-40xpp0pm.tsv new file mode 100644 index 00000000..eff0cc41 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-40xpp0pm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-40xpp0pm New York Now 00:00:04.000 00:00:12.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-40xpp0qb.tsv b/january-slates/golds/cpb-aacip-131-40xpp0qb.tsv new file mode 100644 index 00000000..7b0a5e2b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-40xpp0qb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-40xpp0qb New York Now 00:00:00.000 00:00:07.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-41mgqsfm.tsv b/january-slates/golds/cpb-aacip-131-41mgqsfm.tsv new file mode 100644 index 00000000..a386599c --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-41mgqsfm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-41mgqsfm New York Now 00:00:25.150 00:00:33.150 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-4298sk0x.tsv b/january-slates/golds/cpb-aacip-131-4298sk0x.tsv new file mode 100644 index 00000000..9e75bc1f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-4298sk0x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-4298sk0x New York Now 00:00:05.000 00:00:12.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-439zw7nq.tsv b/january-slates/golds/cpb-aacip-131-439zw7nq.tsv new file mode 100644 index 00000000..7989724d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-439zw7nq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-439zw7nq New York Now 00:00:14.280 00:00:24.280 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-44bnzx7p.tsv b/january-slates/golds/cpb-aacip-131-44bnzx7p.tsv new file mode 100644 index 00000000..7b9a7a34 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-44bnzx7p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-44bnzx7p New York Now 00:00:00.000 00:00:03.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-44pk0t0t.tsv b/january-slates/golds/cpb-aacip-131-44pk0t0t.tsv new file mode 100644 index 00000000..46ea8c7b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-44pk0t0t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-44pk0t0t New York Now 00:00:10.000 00:00:16.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-45q83gmg.tsv b/january-slates/golds/cpb-aacip-131-45q83gmg.tsv new file mode 100644 index 00000000..1983bc46 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-45q83gmg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-45q83gmg New York Now 00:00:26.000 00:00:34.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-45q83gn6.tsv b/january-slates/golds/cpb-aacip-131-45q83gn6.tsv new file mode 100644 index 00000000..bcabeda0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-45q83gn6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-45q83gn6 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-46254cmm.tsv b/january-slates/golds/cpb-aacip-131-46254cmm.tsv new file mode 100644 index 00000000..a7797254 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-46254cmm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-46254cmm New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-46d258bd.tsv b/january-slates/golds/cpb-aacip-131-46d258bd.tsv new file mode 100644 index 00000000..b7ffa814 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-46d258bd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-46d258bd New York Now 00:00:25.150 00:00:33.140 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-46qz653b.tsv b/january-slates/golds/cpb-aacip-131-46qz653b.tsv new file mode 100644 index 00000000..f48ade96 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-46qz653b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-46qz653b New York Now 00:00:00.000 00:00:03.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-472v7246.tsv b/january-slates/golds/cpb-aacip-131-472v7246.tsv new file mode 100644 index 00000000..62a1d067 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-472v7246.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-472v7246 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-47dr7xzt.tsv b/january-slates/golds/cpb-aacip-131-47dr7xzt.tsv new file mode 100644 index 00000000..24de147f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-47dr7xzt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-47dr7xzt New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-48ffbmhq.tsv b/january-slates/golds/cpb-aacip-131-48ffbmhq.tsv new file mode 100644 index 00000000..cebcb732 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-48ffbmhq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-48ffbmhq New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-48sbchfv.tsv b/january-slates/golds/cpb-aacip-131-48sbchfv.tsv new file mode 100644 index 00000000..607c9baa --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-48sbchfv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-48sbchfv New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-48sbchgk.tsv b/january-slates/golds/cpb-aacip-131-48sbchgk.tsv new file mode 100644 index 00000000..fd5c5b0a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-48sbchgk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-48sbchgk New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-48sbchh9.tsv b/january-slates/golds/cpb-aacip-131-48sbchh9.tsv new file mode 100644 index 00000000..4b1cfc21 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-48sbchh9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-48sbchh9 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-48sbchj1.tsv b/january-slates/golds/cpb-aacip-131-48sbchj1.tsv new file mode 100644 index 00000000..73041d84 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-48sbchj1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-48sbchj1 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-4947ddbt.tsv b/january-slates/golds/cpb-aacip-131-4947ddbt.tsv new file mode 100644 index 00000000..7f49b245 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-4947ddbt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-4947ddbt New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-4947ddcj.tsv b/january-slates/golds/cpb-aacip-131-4947ddcj.tsv new file mode 100644 index 00000000..cd31674a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-4947ddcj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-4947ddcj New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-4947ddd8.tsv b/january-slates/golds/cpb-aacip-131-4947ddd8.tsv new file mode 100644 index 00000000..193c2c41 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-4947ddd8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-4947ddd8 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-4947ddf0.tsv b/january-slates/golds/cpb-aacip-131-4947ddf0.tsv new file mode 100644 index 00000000..7efe8eed --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-4947ddf0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-4947ddf0 New York Now 00:00:00.000 00:00:07.000 t True free text yes countdown diff --git a/january-slates/golds/cpb-aacip-131-49g4f942.tsv b/january-slates/golds/cpb-aacip-131-49g4f942.tsv new file mode 100644 index 00000000..b4c9de21 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-49g4f942.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-49g4f942 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-49g4f95s.tsv b/january-slates/golds/cpb-aacip-131-49g4f95s.tsv new file mode 100644 index 00000000..b2fb14dd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-49g4f95s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-49g4f95s New York Now 00:00:16.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-504xh2wf.tsv b/january-slates/golds/cpb-aacip-131-504xh2wf.tsv new file mode 100644 index 00000000..d089fd36 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-504xh2wf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-504xh2wf New York Now 00:00:00.000 00:00:04.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-50gthzrg.tsv b/january-slates/golds/cpb-aacip-131-50gthzrg.tsv new file mode 100644 index 00000000..79f075f7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-50gthzrg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-50gthzrg New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-50tqjvkf.tsv b/january-slates/golds/cpb-aacip-131-50tqjvkf.tsv new file mode 100644 index 00000000..eecfeee3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-50tqjvkf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-50tqjvkf New York Now 00:00:27.000 00:00:34.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-51hhmnct.tsv b/january-slates/golds/cpb-aacip-131-51hhmnct.tsv new file mode 100644 index 00000000..c0ffa6fd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-51hhmnct.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-51hhmnct New York Now 00:00:13.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-5269pf21.tsv b/january-slates/golds/cpb-aacip-131-5269pf21.tsv new file mode 100644 index 00000000..7447fb98 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-5269pf21.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-5269pf21 New York Now 00:00:25.000 00:00:32.290 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-5370s3kh.tsv b/january-slates/golds/cpb-aacip-131-5370s3kh.tsv new file mode 100644 index 00000000..4a8078c3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-5370s3kh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-5370s3kh New York Now 00:00:06.000 00:00:27.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-53jwt0gb.tsv b/january-slates/golds/cpb-aacip-131-53jwt0gb.tsv new file mode 100644 index 00000000..15e599d7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-53jwt0gb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-53jwt0gb New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-53jwt0h2.tsv b/january-slates/golds/cpb-aacip-131-53jwt0h2.tsv new file mode 100644 index 00000000..a62853af --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-53jwt0h2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-53jwt0h2 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-53jwt0js.tsv b/january-slates/golds/cpb-aacip-131-53jwt0js.tsv new file mode 100644 index 00000000..0cd14127 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-53jwt0js.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-53jwt0js New York Now 00:00:00.000 00:00:04.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-54kkwp29.tsv b/january-slates/golds/cpb-aacip-131-54kkwp29.tsv new file mode 100644 index 00000000..29ffd867 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-54kkwp29.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-54kkwp29 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-54xgxk15.tsv b/january-slates/golds/cpb-aacip-131-54xgxk15.tsv new file mode 100644 index 00000000..e13acfe2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-54xgxk15.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-54xgxk15 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-55m90bv6.tsv b/january-slates/golds/cpb-aacip-131-55m90bv6.tsv new file mode 100644 index 00000000..ee99faf8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-55m90bv6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-55m90bv6 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-569324f7.tsv b/january-slates/golds/cpb-aacip-131-569324f7.tsv new file mode 100644 index 00000000..4073ab6f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-569324f7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-569324f7 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-569324gz.tsv b/january-slates/golds/cpb-aacip-131-569324gz.tsv new file mode 100644 index 00000000..b9e9ba7e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-569324gz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-569324gz New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-56n031d3.tsv b/january-slates/golds/cpb-aacip-131-56n031d3.tsv new file mode 100644 index 00000000..882a8cc5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-56n031d3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-56n031d3 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-56n031ft.tsv b/january-slates/golds/cpb-aacip-131-56n031ft.tsv new file mode 100644 index 00000000..d2ee3ee1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-56n031ft.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-56n031ft New York Now 00:00:10.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-58bg7grf.tsv b/january-slates/golds/cpb-aacip-131-58bg7grf.tsv new file mode 100644 index 00000000..c4eb9750 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-58bg7grf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-58bg7grf New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-58pc8cg7.tsv b/january-slates/golds/cpb-aacip-131-58pc8cg7.tsv new file mode 100644 index 00000000..ad939d0f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-58pc8cg7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-58pc8cg7 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-59q2c22v.tsv b/january-slates/golds/cpb-aacip-131-59q2c22v.tsv new file mode 100644 index 00000000..90f8a5c2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-59q2c22v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-59q2c22v New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-59q2c23k.tsv b/january-slates/golds/cpb-aacip-131-59q2c23k.tsv new file mode 100644 index 00000000..4399231f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-59q2c23k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-59q2c23k New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-612ngmjh.tsv b/january-slates/golds/cpb-aacip-131-612ngmjh.tsv new file mode 100644 index 00000000..608f9a8b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-612ngmjh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-612ngmjh New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-612ngmk7.tsv b/january-slates/golds/cpb-aacip-131-612ngmk7.tsv new file mode 100644 index 00000000..a7e8f750 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-612ngmk7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-612ngmk7 New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-61djhh89.tsv b/january-slates/golds/cpb-aacip-131-61djhh89.tsv new file mode 100644 index 00000000..4df64e70 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-61djhh89.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-61djhh89 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-61rfjd9m.tsv b/january-slates/golds/cpb-aacip-131-61rfjd9m.tsv new file mode 100644 index 00000000..c15b51ea --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-61rfjd9m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-61rfjd9m New York Now 00:00:09.000 00:00:22.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-623bk95v.tsv b/january-slates/golds/cpb-aacip-131-623bk95v.tsv new file mode 100644 index 00000000..704151dd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-623bk95v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-623bk95v New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-623bk96k.tsv b/january-slates/golds/cpb-aacip-131-623bk96k.tsv new file mode 100644 index 00000000..a1ed163f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-623bk96k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-623bk96k New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-6341nzsv.tsv b/january-slates/golds/cpb-aacip-131-6341nzsv.tsv new file mode 100644 index 00000000..6378f06e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-6341nzsv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-6341nzsv New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-64thtf1t.tsv b/january-slates/golds/cpb-aacip-131-64thtf1t.tsv new file mode 100644 index 00000000..0d183652 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-64thtf1t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-64thtf1t New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-65h9w6jq.tsv b/january-slates/golds/cpb-aacip-131-65h9w6jq.tsv new file mode 100644 index 00000000..1e968198 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-65h9w6jq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-65h9w6jq New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-68kd57gw.tsv b/january-slates/golds/cpb-aacip-131-68kd57gw.tsv new file mode 100644 index 00000000..6fc6e4c8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-68kd57gw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-68kd57gw New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-68kd57hm.tsv b/january-slates/golds/cpb-aacip-131-68kd57hm.tsv new file mode 100644 index 00000000..236d4d68 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-68kd57hm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-68kd57hm New York Now 00:00:00.000 00:00:03.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-6986713n.tsv b/january-slates/golds/cpb-aacip-131-6986713n.tsv new file mode 100644 index 00000000..6df2316d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-6986713n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-6986713n New York Now 00:00:01.000 00:00:11.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-69z08svd.tsv b/january-slates/golds/cpb-aacip-131-69z08svd.tsv new file mode 100644 index 00000000..41d7b2f9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-69z08svd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-69z08svd New York Now 00:00:26.000 00:00:34.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-69z08sw4.tsv b/january-slates/golds/cpb-aacip-131-69z08sw4.tsv new file mode 100644 index 00000000..1db1148b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-69z08sw4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-69z08sw4 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-719kdcc4.tsv b/january-slates/golds/cpb-aacip-131-719kdcc4.tsv new file mode 100644 index 00000000..616240eb --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-719kdcc4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-719kdcc4 New York Now 00:00:21.000 00:00:30.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-720cg52b.tsv b/january-slates/golds/cpb-aacip-131-720cg52b.tsv new file mode 100644 index 00000000..41240632 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-720cg52b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-720cg52b New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-720cg532.tsv b/january-slates/golds/cpb-aacip-131-720cg532.tsv new file mode 100644 index 00000000..1b0e6fc9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-720cg532.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-720cg532 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-720cg54s.tsv b/january-slates/golds/cpb-aacip-131-720cg54s.tsv new file mode 100644 index 00000000..43438ca2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-720cg54s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-720cg54s New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-72b8h1wm.tsv b/january-slates/golds/cpb-aacip-131-72b8h1wm.tsv new file mode 100644 index 00000000..149401ce --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-72b8h1wm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-72b8h1wm New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-72b8h1xb.tsv b/january-slates/golds/cpb-aacip-131-72b8h1xb.tsv new file mode 100644 index 00000000..37b98a31 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-72b8h1xb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-72b8h1xb New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-7312jthq.tsv b/january-slates/golds/cpb-aacip-131-7312jthq.tsv new file mode 100644 index 00000000..a4fd0b62 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-7312jthq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-7312jthq New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-7312jtjf.tsv b/january-slates/golds/cpb-aacip-131-7312jtjf.tsv new file mode 100644 index 00000000..cfb73e43 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-7312jtjf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-7312jtjf New York Now 00:00:00.000 00:00:05.170 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-7312jtk5.tsv b/january-slates/golds/cpb-aacip-131-7312jtk5.tsv new file mode 100644 index 00000000..6e46efe4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-7312jtk5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-7312jtk5 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-7312jtmw.tsv b/january-slates/golds/cpb-aacip-131-7312jtmw.tsv new file mode 100644 index 00000000..2d592cfd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-7312jtmw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-7312jtmw New York Now 00:00:15.050 00:00:25.040 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-73bzkqhq.tsv b/january-slates/golds/cpb-aacip-131-73bzkqhq.tsv new file mode 100644 index 00000000..3388b78a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-73bzkqhq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-73bzkqhq New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-75r7szf4.tsv b/january-slates/golds/cpb-aacip-131-75r7szf4.tsv new file mode 100644 index 00000000..9fefc643 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-75r7szf4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-75r7szf4 New York Now 00:00:00.000 00:00:03.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-75r7szgv.tsv b/january-slates/golds/cpb-aacip-131-75r7szgv.tsv new file mode 100644 index 00000000..26bb1186 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-75r7szgv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-75r7szgv New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-773txj7n.tsv b/january-slates/golds/cpb-aacip-131-773txj7n.tsv new file mode 100644 index 00000000..4654980f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-773txj7n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-773txj7n New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-805x6js5.tsv b/january-slates/golds/cpb-aacip-131-805x6js5.tsv new file mode 100644 index 00000000..0ca43a38 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-805x6js5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-805x6js5 New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-80vq8bgt.tsv b/january-slates/golds/cpb-aacip-131-80vq8bgt.tsv new file mode 100644 index 00000000..2a023a35 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-80vq8bgt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-80vq8bgt New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-81jhb4bn.tsv b/january-slates/golds/cpb-aacip-131-81jhb4bn.tsv new file mode 100644 index 00000000..bd6e9b1b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-81jhb4bn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-81jhb4bn New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-82k6dstr.tsv b/january-slates/golds/cpb-aacip-131-82k6dstr.tsv new file mode 100644 index 00000000..f52e4e6c --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-82k6dstr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-82k6dstr New York Now 00:00:04.000 00:00:12.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-82k6dsvg.tsv b/january-slates/golds/cpb-aacip-131-82k6dsvg.tsv new file mode 100644 index 00000000..91df397d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-82k6dsvg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-82k6dsvg New York Now 00:00:11.000 00:00:22.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-82k6dsw6.tsv b/january-slates/golds/cpb-aacip-131-82k6dsw6.tsv new file mode 100644 index 00000000..12d8a47f --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-82k6dsw6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-82k6dsw6 New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-82x3fpnq.tsv b/january-slates/golds/cpb-aacip-131-82x3fpnq.tsv new file mode 100644 index 00000000..314853b0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-82x3fpnq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-82x3fpnq New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-82x3fppf.tsv b/january-slates/golds/cpb-aacip-131-82x3fppf.tsv new file mode 100644 index 00000000..3be66722 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-82x3fppf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-82x3fppf New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-848pk81j.tsv b/january-slates/golds/cpb-aacip-131-848pk81j.tsv new file mode 100644 index 00000000..3143325b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-848pk81j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-848pk81j New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-848pk828.tsv b/january-slates/golds/cpb-aacip-131-848pk828.tsv new file mode 100644 index 00000000..590aad30 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-848pk828.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-848pk828 New York Now 00:00:15.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-85n8ptfs.tsv b/january-slates/golds/cpb-aacip-131-85n8ptfs.tsv new file mode 100644 index 00000000..091da37b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-85n8ptfs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-85n8ptfs New York Now 00:00:44.260 00:00:52.250 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-8605qqd6.tsv b/january-slates/golds/cpb-aacip-131-8605qqd6.tsv new file mode 100644 index 00000000..5877ec98 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-8605qqd6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-8605qqd6 New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-86b2rm75.tsv b/january-slates/golds/cpb-aacip-131-86b2rm75.tsv new file mode 100644 index 00000000..b8df54d9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-86b2rm75.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-86b2rm75 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-86b2rm8w.tsv b/january-slates/golds/cpb-aacip-131-86b2rm8w.tsv new file mode 100644 index 00000000..634ce9f8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-86b2rm8w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-86b2rm8w New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-86nzsh6f.tsv b/january-slates/golds/cpb-aacip-131-86nzsh6f.tsv new file mode 100644 index 00000000..3fecc42a --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-86nzsh6f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-86nzsh6f New York Now 00:00:26.180 00:00:34.180 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-86nzsh75.tsv b/january-slates/golds/cpb-aacip-131-86nzsh75.tsv new file mode 100644 index 00000000..d8b38d7e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-86nzsh75.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-86nzsh75 New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-87brv8th.tsv b/january-slates/golds/cpb-aacip-131-87brv8th.tsv new file mode 100644 index 00000000..3e63bb04 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-87brv8th.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-87brv8th New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-87brv8v7.tsv b/january-slates/golds/cpb-aacip-131-87brv8v7.tsv new file mode 100644 index 00000000..45ff747d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-87brv8v7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-87brv8v7 New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-87brv8wz.tsv b/january-slates/golds/cpb-aacip-131-87brv8wz.tsv new file mode 100644 index 00000000..871e656c --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-87brv8wz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-87brv8wz New York Now 00:00:17.000 00:00:27.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-87pnw5p6.tsv b/january-slates/golds/cpb-aacip-131-87pnw5p6.tsv new file mode 100644 index 00000000..88a4eadd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-87pnw5p6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-87pnw5p6 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-88qbzv7f.tsv b/january-slates/golds/cpb-aacip-131-88qbzv7f.tsv new file mode 100644 index 00000000..be7f6baa --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-88qbzv7f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-88qbzv7f New York Now 00:00:15.080 00:00:25.070 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-89280r2k.tsv b/january-slates/golds/cpb-aacip-131-89280r2k.tsv new file mode 100644 index 00000000..586a1403 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-89280r2k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-89280r2k New York Now 00:00:00.000 00:00:02.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-89280r39.tsv b/january-slates/golds/cpb-aacip-131-89280r39.tsv new file mode 100644 index 00000000..ef36f986 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-89280r39.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-89280r39 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-89r22hvq.tsv b/january-slates/golds/cpb-aacip-131-89r22hvq.tsv new file mode 100644 index 00000000..f7eb5f57 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-89r22hvq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-89r22hvq New York Now 00:00:15.000 00:00:25.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-902z3dtj.tsv b/january-slates/golds/cpb-aacip-131-902z3dtj.tsv new file mode 100644 index 00000000..f6bf15f7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-902z3dtj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-902z3dtj New York Now 00:00:00.000 00:00:05.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-91fj709k.tsv b/january-slates/golds/cpb-aacip-131-91fj709k.tsv new file mode 100644 index 00000000..1454d8eb --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-91fj709k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-91fj709k New York Now 00:00:25.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-91fj70b9.tsv b/january-slates/golds/cpb-aacip-131-91fj70b9.tsv new file mode 100644 index 00000000..6d05a053 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-91fj70b9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-91fj70b9 New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-91fj70c1.tsv b/january-slates/golds/cpb-aacip-131-91fj70c1.tsv new file mode 100644 index 00000000..29496fdb --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-91fj70c1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-91fj70c1 New York Now 00:00:00.000 00:00:04.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-91sf7w4w.tsv b/january-slates/golds/cpb-aacip-131-91sf7w4w.tsv new file mode 100644 index 00000000..6ff181f2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-91sf7w4w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-91sf7w4w New York Now 00:00:25.100 00:00:33.090 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-924b8rtt.tsv b/january-slates/golds/cpb-aacip-131-924b8rtt.tsv new file mode 100644 index 00000000..f0ebde1b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-924b8rtt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-924b8rtt New York Now 00:00:26.000 00:00:33.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-92g79nwv.tsv b/january-slates/golds/cpb-aacip-131-92g79nwv.tsv new file mode 100644 index 00000000..5b00b4ad --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-92g79nwv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-92g79nwv New York Now 00:00:24.210 00:00:32.200 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-9351cfms.tsv b/january-slates/golds/cpb-aacip-131-9351cfms.tsv new file mode 100644 index 00000000..a7c787fd --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-9351cfms.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-9351cfms New York Now 00:00:00.000 00:00:04.270 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-9351cfnh.tsv b/january-slates/golds/cpb-aacip-131-9351cfnh.tsv new file mode 100644 index 00000000..727e0092 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-9351cfnh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-9351cfnh New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-945qg46t.tsv b/january-slates/golds/cpb-aacip-131-945qg46t.tsv new file mode 100644 index 00000000..bfaca59e --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-945qg46t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-945qg46t New York Now 00:00:14.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-95j9kpkb.tsv b/january-slates/golds/cpb-aacip-131-95j9kpkb.tsv new file mode 100644 index 00000000..251380e1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-95j9kpkb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-95j9kpkb New York Now 00:00:00.000 00:00:05.210 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-9673ng7t.tsv b/january-slates/golds/cpb-aacip-131-9673ng7t.tsv new file mode 100644 index 00000000..35cd4674 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-9673ng7t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-9673ng7t New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-988gttbp.tsv b/january-slates/golds/cpb-aacip-131-988gttbp.tsv new file mode 100644 index 00000000..5e85552d --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-988gttbp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-988gttbp New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-988gttcd.tsv b/january-slates/golds/cpb-aacip-131-988gttcd.tsv new file mode 100644 index 00000000..e69563cc --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-988gttcd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-988gttcd New York Now 00:00:05.000 00:00:12.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-988gttd4.tsv b/january-slates/golds/cpb-aacip-131-988gttd4.tsv new file mode 100644 index 00000000..f1256668 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-988gttd4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-988gttd4 New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-98z8wm7p.tsv b/january-slates/golds/cpb-aacip-131-98z8wm7p.tsv new file mode 100644 index 00000000..c96f7910 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-98z8wm7p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-98z8wm7p New York Now 00:00:00.000 00:00:05.000 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-131-9995xh0r.tsv b/january-slates/golds/cpb-aacip-131-9995xh0r.tsv new file mode 100644 index 00000000..4d03f88b --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-9995xh0r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-9995xh0r New York Now 00:00:25.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-131-9995xh1g.tsv b/january-slates/golds/cpb-aacip-131-9995xh1g.tsv new file mode 100644 index 00000000..5fc8dbb4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-131-9995xh1g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-131-9995xh1g New York Now 00:00:24.000 00:00:32.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-000002z3.tsv b/january-slates/golds/cpb-aacip-153-000002z3.tsv new file mode 100644 index 00000000..ad905d36 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-000002z3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-000002z3 Front Street Weekly 00:00:00.000 00:00:01.000 t True free text slate/camera info over color bars diff --git a/january-slates/golds/cpb-aacip-153-009w0wcr.tsv b/january-slates/golds/cpb-aacip-153-009w0wcr.tsv new file mode 100644 index 00000000..d6a12051 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-009w0wcr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-009w0wcr Front Street Weekly 00:00:09.000 00:00:19.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-032281kr.tsv b/january-slates/golds/cpb-aacip-153-032281kr.tsv new file mode 100644 index 00000000..a985bed6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-032281kr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-032281kr Front Street Weekly 00:00:01.000 00:00:04.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-03cz8xgx.tsv b/january-slates/golds/cpb-aacip-153-03cz8xgx.tsv new file mode 100644 index 00000000..1131eeef --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-03cz8xgx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-03cz8xgx Front Street Weekly 00:00:08.000 00:00:11.000 t True free text slate over image diff --git a/january-slates/golds/cpb-aacip-153-042rbpt6.tsv b/january-slates/golds/cpb-aacip-153-042rbpt6.tsv new file mode 100644 index 00000000..7d31c3ca --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-042rbpt6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-042rbpt6 Front Street Weekly 00:00:06.000 00:00:25.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-04dnckw7.tsv b/january-slates/golds/cpb-aacip-153-04dnckw7.tsv new file mode 100644 index 00000000..17cb3f51 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-04dnckw7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-04dnckw7 Front Street Weekly 00:00:05.000 00:00:25.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-05s7h55x.tsv b/january-slates/golds/cpb-aacip-153-05s7h55x.tsv new file mode 100644 index 00000000..60fa1202 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-05s7h55x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-05s7h55x Front Street Weekly 00:00:02.000 00:00:21.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-07gqnmcc.tsv b/january-slates/golds/cpb-aacip-153-07gqnmcc.tsv new file mode 100644 index 00000000..2e63551a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-07gqnmcc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-07gqnmcc Front Street Weekly 00:00:00.000 00:00:04.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-07gqnmd3.tsv b/january-slates/golds/cpb-aacip-153-07gqnmd3.tsv new file mode 100644 index 00000000..e676d9b1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-07gqnmd3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-07gqnmd3 Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-085hqddt.tsv b/january-slates/golds/cpb-aacip-153-085hqddt.tsv new file mode 100644 index 00000000..512a32b7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-085hqddt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-085hqddt Front Street Weekly 00:00:01.000 00:00:04.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-09j3tzvs.tsv b/january-slates/golds/cpb-aacip-153-09j3tzvs.tsv new file mode 100644 index 00000000..b8f5e146 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-09j3tzvs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-09j3tzvs Front Street Weekly 00:00:04.000 00:00:24.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-106wwrgz.tsv b/january-slates/golds/cpb-aacip-153-106wwrgz.tsv new file mode 100644 index 00000000..016a16c4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-106wwrgz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-106wwrgz Front Street Weekly 00:00:05.000 00:00:16.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-117m0f63.tsv b/january-slates/golds/cpb-aacip-153-117m0f63.tsv new file mode 100644 index 00000000..b014c83a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-117m0f63.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-117m0f63 Front Street Weekly 00:00:08.000 00:00:19.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-128933r9.tsv b/january-slates/golds/cpb-aacip-153-128933r9.tsv new file mode 100644 index 00000000..e8f62516 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-128933r9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-128933r9 Front Street Weekly 00:00:20.000 00:00:19.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-128933s1.tsv b/january-slates/golds/cpb-aacip-153-128933s1.tsv new file mode 100644 index 00000000..b40dba9a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-128933s1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-128933s1 Front Street Weekly 00:00:20.000 00:00:34.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-14nk9bs9.tsv b/january-slates/golds/cpb-aacip-153-14nk9bs9.tsv new file mode 100644 index 00000000..e1f5c7e3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-14nk9bs9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-14nk9bs9 Front Street Weekly 00:00:00.000 00:00:02.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-16c2fszm.tsv b/january-slates/golds/cpb-aacip-153-16c2fszm.tsv new file mode 100644 index 00000000..88de2bd7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-16c2fszm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-16c2fszm Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-16c2ft2g.tsv b/january-slates/golds/cpb-aacip-153-16c2ft2g.tsv new file mode 100644 index 00000000..eaa66d35 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-16c2ft2g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-16c2ft2g Front Street Weekly 00:00:03.000 00:00:09.000 t True free text no diff --git a/january-slates/golds/cpb-aacip-153-16pzgptq.tsv b/january-slates/golds/cpb-aacip-153-16pzgptq.tsv new file mode 100644 index 00000000..d41d7a98 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-16pzgptq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-16pzgptq Front Street Weekly 00:00:05.000 00:00:24.000 t True free text moving image behind slate animation words countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-17qnkc3t.tsv b/january-slates/golds/cpb-aacip-153-17qnkc3t.tsv new file mode 100644 index 00000000..7880b522 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-17qnkc3t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-17qnkc3t Front Street Weekly 00:00:00.000 00:00:04.000 t True free text slate over color bars only title diff --git a/january-slates/golds/cpb-aacip-153-19f4qtn3.tsv b/january-slates/golds/cpb-aacip-153-19f4qtn3.tsv new file mode 100644 index 00000000..d9b0b557 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-19f4qtn3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-19f4qtn3 Front Street Weekly 00:00:05.000 00:00:14.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-19f4qtr8.tsv b/january-slates/golds/cpb-aacip-153-19f4qtr8.tsv new file mode 100644 index 00000000..9e20a4a7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-19f4qtr8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-19f4qtr8 Front Street Weekly 00:00:03.000 00:00:23.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-20sqvf3h.tsv b/january-slates/golds/cpb-aacip-153-20sqvf3h.tsv new file mode 100644 index 00000000..a6ce5b0a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-20sqvf3h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-20sqvf3h Front Street Weekly 00:00:13.000 00:00:22.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-21ghx5sb.tsv b/january-slates/golds/cpb-aacip-153-21ghx5sb.tsv new file mode 100644 index 00000000..2ed7d284 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-21ghx5sb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-21ghx5sb Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-22h70vg3.tsv b/january-slates/golds/cpb-aacip-153-22h70vg3.tsv new file mode 100644 index 00000000..6157b666 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-22h70vg3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-22h70vg3 Front Street Weekly 00:00:04.000 00:00:23.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-22h70vht.tsv b/january-slates/golds/cpb-aacip-153-22h70vht.tsv new file mode 100644 index 00000000..b5c3e00f --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-22h70vht.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-22h70vht Front Street Weekly 00:00:10.000 00:00:19.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-23612n24.tsv b/january-slates/golds/cpb-aacip-153-23612n24.tsv new file mode 100644 index 00000000..18fe4081 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-23612n24.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-23612n24 Front Street Weekly 00:00:05.000 00:00:24.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-23hx3hwt.tsv b/january-slates/golds/cpb-aacip-153-23hx3hwt.tsv new file mode 100644 index 00000000..1cf8e31c --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-23hx3hwt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-23hx3hwt Front Street Weekly 00:00:05.000 00:00:20.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-246q59t3.tsv b/january-slates/golds/cpb-aacip-153-246q59t3.tsv new file mode 100644 index 00000000..0e02a9a9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-246q59t3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-246q59t3 Front Street Weekly 00:00:04.000 00:00:23.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-257d80kb.tsv b/january-slates/golds/cpb-aacip-153-257d80kb.tsv new file mode 100644 index 00000000..dd486e82 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-257d80kb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-257d80kb Front Street Weekly 00:00:05.000 00:00:24.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-25x69s18.tsv b/january-slates/golds/cpb-aacip-153-25x69s18.tsv new file mode 100644 index 00000000..8dc541d8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-25x69s18.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-25x69s18 Front Street Weekly 00:00:17.000 00:00:23.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-26m0cjqs.tsv b/january-slates/golds/cpb-aacip-153-26m0cjqs.tsv new file mode 100644 index 00000000..fd6fc81a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-26m0cjqs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-26m0cjqs Front Street Weekly 00:00:01.000 00:00:11.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-26xwdfzv.tsv b/january-slates/golds/cpb-aacip-153-26xwdfzv.tsv new file mode 100644 index 00000000..af743d67 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-26xwdfzv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-26xwdfzv Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-278sfbrn.tsv b/january-slates/golds/cpb-aacip-153-278sfbrn.tsv new file mode 100644 index 00000000..b3d7a0ef --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-278sfbrn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-278sfbrn Front Street Weekly 00:00:00.000 00:00:04.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-28ncjx34.tsv b/january-slates/golds/cpb-aacip-153-28ncjx34.tsv new file mode 100644 index 00000000..9b29b802 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-28ncjx34.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-28ncjx34 Front Street Weekly 00:00:04.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-28ncjx8r.tsv b/january-slates/golds/cpb-aacip-153-28ncjx8r.tsv new file mode 100644 index 00000000..988da6b0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-28ncjx8r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-28ncjx8r Front Street Weekly 00:00:17.000 00:00:26.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-29b5mpnr.tsv b/january-slates/golds/cpb-aacip-153-29b5mpnr.tsv new file mode 100644 index 00000000..c4859c73 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-29b5mpnr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-29b5mpnr Front Street Weekly 00:00:15.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-300zpjd6.tsv b/january-slates/golds/cpb-aacip-153-300zpjd6.tsv new file mode 100644 index 00000000..29be3277 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-300zpjd6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-300zpjd6 Front Street Weekly 00:00:23.000 00:00:28.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-30prr83g.tsv b/january-slates/golds/cpb-aacip-153-30prr83g.tsv new file mode 100644 index 00000000..b0c82f88 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-30prr83g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-30prr83g Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-311ns4vv.tsv b/january-slates/golds/cpb-aacip-153-311ns4vv.tsv new file mode 100644 index 00000000..0c193587 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-311ns4vv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-311ns4vv Front Street Weekly 00:00:03.000 00:00:23.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-311ns4wk.tsv b/january-slates/golds/cpb-aacip-153-311ns4wk.tsv new file mode 100644 index 00000000..c491aea0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-311ns4wk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-311ns4wk Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars font color change diff --git a/january-slates/golds/cpb-aacip-153-311ns5s3.tsv b/january-slates/golds/cpb-aacip-153-311ns5s3.tsv new file mode 100644 index 00000000..843a6c48 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-311ns5s3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-311ns5s3 Front Street Weekly 00:00:00.000 00:00:04.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-31cjt1tq.tsv b/january-slates/golds/cpb-aacip-153-31cjt1tq.tsv new file mode 100644 index 00000000..41017189 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-31cjt1tq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-31cjt1tq Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-31cjt1zm.tsv b/january-slates/golds/cpb-aacip-153-31cjt1zm.tsv new file mode 100644 index 00000000..4a363344 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-31cjt1zm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-31cjt1zm Front Street Weekly 00:00:04.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-31qftxvc.tsv b/january-slates/golds/cpb-aacip-153-31qftxvc.tsv new file mode 100644 index 00000000..6916be1a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-31qftxvc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-31qftxvc Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-322bvtrb.tsv b/january-slates/golds/cpb-aacip-153-322bvtrb.tsv new file mode 100644 index 00000000..058f8acb --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-322bvtrb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-322bvtrb Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-32d7wqdp.tsv b/january-slates/golds/cpb-aacip-153-32d7wqdp.tsv new file mode 100644 index 00000000..c5460ef6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-32d7wqdp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-32d7wqdp Front Street Weekly 00:00:15.000 00:00:22.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-33dz0d3h.tsv b/january-slates/golds/cpb-aacip-153-33dz0d3h.tsv new file mode 100644 index 00000000..88ca9cf5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-33dz0d3h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-33dz0d3h Front Street Weekly 00:00:06.000 00:00:25.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-33dz0d5z.tsv b/january-slates/golds/cpb-aacip-153-33dz0d5z.tsv new file mode 100644 index 00000000..e3a53135 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-33dz0d5z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-33dz0d5z Front Street Weekly 00:00:11.000 00:00:15.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-33dz0d6p.tsv b/january-slates/golds/cpb-aacip-153-33dz0d6p.tsv new file mode 100644 index 00000000..73c7f1cc --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-33dz0d6p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-33dz0d6p Front Street Weekly 00:00:00.000 00:00:03.000 t True free text slate over color bars only title diff --git a/january-slates/golds/cpb-aacip-153-33rv190x.tsv b/january-slates/golds/cpb-aacip-153-33rv190x.tsv new file mode 100644 index 00000000..e258bd0a --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-33rv190x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-33rv190x Front Street Weekly 00:00:04.000 00:00:14.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-34fn32g3.tsv b/january-slates/golds/cpb-aacip-153-34fn32g3.tsv new file mode 100644 index 00000000..3bef444b --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-34fn32g3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-34fn32g3 Front Street Weekly 00:00:11.000 00:00:13.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-35gb5rhg.tsv b/january-slates/golds/cpb-aacip-153-35gb5rhg.tsv new file mode 100644 index 00000000..ed588193 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-35gb5rhg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-35gb5rhg Front Street Weekly 00:00:02.000 00:00:20.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-36547j47.tsv b/january-slates/golds/cpb-aacip-153-36547j47.tsv new file mode 100644 index 00000000..74bcd6bd --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-36547j47.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-36547j47 Front Street Weekly 00:00:00.000 00:00:16.000 t True free text slate over color bars countdown slate after color bar slate diff --git a/january-slates/golds/cpb-aacip-153-375tb6kp.tsv b/january-slates/golds/cpb-aacip-153-375tb6kp.tsv new file mode 100644 index 00000000..aba0f6d7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-375tb6kp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-375tb6kp Front Street Weekly 00:00:09.000 00:00:19.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-386hdw5n.tsv b/january-slates/golds/cpb-aacip-153-386hdw5n.tsv new file mode 100644 index 00000000..3011bc0c --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-386hdw5n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-386hdw5n Front Street Weekly 00:00:00.000 00:00:03.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-386hdw6c.tsv b/january-slates/golds/cpb-aacip-153-386hdw6c.tsv new file mode 100644 index 00000000..dd07019c --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-386hdw6c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-386hdw6c Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-386hdz86.tsv b/january-slates/golds/cpb-aacip-153-386hdz86.tsv new file mode 100644 index 00000000..3451e69c --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-386hdz86.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-386hdz86 Front Street Weekly 00:00:00.000 00:00:03.000 t True free text slate over color bars only title diff --git a/january-slates/golds/cpb-aacip-153-38jdfrt9.tsv b/january-slates/golds/cpb-aacip-153-38jdfrt9.tsv new file mode 100644 index 00000000..e02af1dd --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-38jdfrt9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-38jdfrt9 Front Street Weekly 00:00:16.000 00:00:22.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-38w9gntw.tsv b/january-slates/golds/cpb-aacip-153-38w9gntw.tsv new file mode 100644 index 00000000..7996dd1e --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-38w9gntw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-38w9gntw Front Street Weekly 00:00:06.000 00:00:25.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-38w9gnx2.tsv b/january-slates/golds/cpb-aacip-153-38w9gnx2.tsv new file mode 100644 index 00000000..bd8c8518 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-38w9gnx2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-38w9gnx2 Front Street Weekly 00:00:03.000 00:00:22.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-40ksn45k.tsv b/january-slates/golds/cpb-aacip-153-40ksn45k.tsv new file mode 100644 index 00000000..ead91b57 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-40ksn45k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-40ksn45k Front Street Weekly 00:00:05.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-4298skkz.tsv b/january-slates/golds/cpb-aacip-153-4298skkz.tsv new file mode 100644 index 00000000..0c7d9bba --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-4298skkz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-4298skkz Front Street Weekly 00:00:10.000 00:00:19.000 t True key-value pairs no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-42n5tg81.tsv b/january-slates/golds/cpb-aacip-153-42n5tg81.tsv new file mode 100644 index 00000000..cc24b1d0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-42n5tg81.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-42n5tg81 Front Street Weekly 00:00:09.000 00:00:21.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-42n5tg9r.tsv b/january-slates/golds/cpb-aacip-153-42n5tg9r.tsv new file mode 100644 index 00000000..1602692b --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-42n5tg9r.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-42n5tg9r Front Street Weekly 00:00:04.000 00:00:20.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-42n5tgbg.tsv b/january-slates/golds/cpb-aacip-153-42n5tgbg.tsv new file mode 100644 index 00000000..22e049b7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-42n5tgbg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-42n5tgbg Front Street Weekly 00:00:00.000 00:00:14.000 t True free text countdown on slate diff --git a/january-slates/golds/cpb-aacip-153-44bnzxr8.tsv b/january-slates/golds/cpb-aacip-153-44bnzxr8.tsv new file mode 100644 index 00000000..a60541a6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-44bnzxr8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-44bnzxr8 Front Street Weekly 00:00:00.000 00:00:05.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-44bnzxs0.tsv b/january-slates/golds/cpb-aacip-153-44bnzxs0.tsv new file mode 100644 index 00000000..08c16921 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-44bnzxs0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-44bnzxs0 Front Street Weekly 00:00:09.000 00:00:19.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-46254cw4.tsv b/january-slates/golds/cpb-aacip-153-46254cw4.tsv new file mode 100644 index 00000000..3834a0ba --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-46254cw4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-46254cw4 Front Street Weekly 00:00:03.000 00:00:07.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-472v72b8.tsv b/january-slates/golds/cpb-aacip-153-472v72b8.tsv new file mode 100644 index 00000000..bad2dca8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-472v72b8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-472v72b8 Front Street Weekly 00:00:07.000 00:00:24.000 t True free text no countdown after slate diff --git a/january-slates/golds/cpb-aacip-153-48ffbpfc.tsv b/january-slates/golds/cpb-aacip-153-48ffbpfc.tsv new file mode 100644 index 00000000..f1e8553b --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-48ffbpfc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-48ffbpfc Front Street Weekly 00:00:00.000 00:00:06.000 t True free text slate over color bars diff --git a/january-slates/golds/cpb-aacip-153-48sbchpn.tsv b/january-slates/golds/cpb-aacip-153-48sbchpn.tsv new file mode 100644 index 00000000..5b02dadc --- /dev/null +++ b/january-slates/golds/cpb-aacip-153-48sbchpn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-153-48sbchpn Front Street Weekly 00:00:08.000 00:00:19.000 t True key-value pairs no pacman countdown after slate diff --git a/january-slates/golds/cpb-aacip-189-01pg4fmz.tsv b/january-slates/golds/cpb-aacip-189-01pg4fmz.tsv new file mode 100644 index 00000000..744b889e --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-01pg4fmz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-01pg4fmz Speaking of Rochester 00:00:25.000 00:00:32.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-042rbpjb.tsv b/january-slates/golds/cpb-aacip-189-042rbpjb.tsv new file mode 100644 index 00000000..f889d388 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-042rbpjb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-042rbpjb The Rochester I Know 00:00:23.110 00:00:32.090 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-07tmph2c.tsv b/january-slates/golds/cpb-aacip-189-07tmph2c.tsv new file mode 100644 index 00000000..b64271f8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-07tmph2c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-07tmph2c The Rochester I Know 00:00:08.200 00:00:23.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-08v9s5rg.tsv b/january-slates/golds/cpb-aacip-189-08v9s5rg.tsv new file mode 100644 index 00000000..9635b5a4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-08v9s5rg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-08v9s5rg Speaking of Rochester 00:00:25.140 00:00:33.110 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-09w0vv3c.tsv b/january-slates/golds/cpb-aacip-189-09w0vv3c.tsv new file mode 100644 index 00000000..f01075b6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-09w0vv3c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-09w0vv3c The Rochester I Know 00:00:08.010 00:00:36.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-12m64032.tsv b/january-slates/golds/cpb-aacip-189-12m64032.tsv new file mode 100644 index 00000000..b9cd4a46 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-12m64032.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-12m64032 The Rochester I Know 00:00:05.140 00:00:16.260 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-13zs7jf8.tsv b/january-slates/golds/cpb-aacip-189-13zs7jf8.tsv new file mode 100644 index 00000000..7a6ec3d6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-13zs7jf8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-13zs7jf8 Speaking of Rochester 00:00:29.160 00:00:37.070 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-20sqvcwq.tsv b/january-slates/golds/cpb-aacip-189-20sqvcwq.tsv new file mode 100644 index 00000000..96498034 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-20sqvcwq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-20sqvcwq Speaking of Rochester 00:00:25.140 00:00:33.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-27zkh41j.tsv b/january-slates/golds/cpb-aacip-189-27zkh41j.tsv new file mode 100644 index 00000000..6e47eaed --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-27zkh41j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-27zkh41j The Rochester I Know 00:00:05.040 00:00:56.040 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-2908kskn.tsv b/january-slates/golds/cpb-aacip-189-2908kskn.tsv new file mode 100644 index 00000000..c2a7f495 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-2908kskn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-2908kskn Speaking of Rochester 00:00:25.230 00:00:33.040 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-29b5mpdm.tsv b/january-slates/golds/cpb-aacip-189-29b5mpdm.tsv new file mode 100644 index 00000000..29d3f5de --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-29b5mpdm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-29b5mpdm Speaking of Rochester 00:00:25.020 00:00:33.010 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-189-31qftxfm.tsv b/january-slates/golds/cpb-aacip-189-31qftxfm.tsv new file mode 100644 index 00000000..7aba9193 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-31qftxfm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-31qftxfm Speaking of Rochester 00:00:25.110 00:00:26.300 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-36tx995s.tsv b/january-slates/golds/cpb-aacip-189-36tx995s.tsv new file mode 100644 index 00000000..a08e7642 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-36tx995s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-36tx995s Speaking of Rochester 00:00:42.110 00:00:49.090 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-38jdfrnm.tsv b/january-slates/golds/cpb-aacip-189-38jdfrnm.tsv new file mode 100644 index 00000000..36a7c397 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-38jdfrnm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-38jdfrnm Speaking of Rochester 00:00:24.170 00:00:32.160 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-189-38jdfrpb.tsv b/january-slates/golds/cpb-aacip-189-38jdfrpb.tsv new file mode 100644 index 00000000..d3491ebb --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-38jdfrpb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-38jdfrpb The Rochester I Know 00:00:11.020 00:00:24.270 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-39x0kb26.tsv b/january-slates/golds/cpb-aacip-189-39x0kb26.tsv new file mode 100644 index 00000000..b4bbf9d8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-39x0kb26.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-39x0kb26 The Rochester I Know 00:00:26.100 00:00:36.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-4298sk0k.tsv b/january-slates/golds/cpb-aacip-189-4298sk0k.tsv new file mode 100644 index 00000000..97065a94 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-4298sk0k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-4298sk0k The Rochester I Know 00:00:17.210 00:00:29.200 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-4298sk19.tsv b/january-slates/golds/cpb-aacip-189-4298sk19.tsv new file mode 100644 index 00000000..d05b7197 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-4298sk19.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-4298sk19 The Rochester I Know 00:00:15.220 00:00:19.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-53jwt0jf.tsv b/january-slates/golds/cpb-aacip-189-53jwt0jf.tsv new file mode 100644 index 00000000..a6354a67 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-53jwt0jf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-53jwt0jf The Rochester I Know 00:00:06.050 00:00:25.110 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-55z617r8.tsv b/january-slates/golds/cpb-aacip-189-55z617r8.tsv new file mode 100644 index 00000000..aaf88d17 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-55z617r8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-55z617r8 The Rochester I Know 00:00:18.070 00:00:37.240 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-580k6krh.tsv b/january-slates/golds/cpb-aacip-189-580k6krh.tsv new file mode 100644 index 00000000..36484fb4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-580k6krh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-580k6krh Speaking of Rochester 00:00:08.010 00:00:14.170 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-189-59c5b54c.tsv b/january-slates/golds/cpb-aacip-189-59c5b54c.tsv new file mode 100644 index 00000000..747d05f2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-59c5b54c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-59c5b54c The Rochester I Know 00:00:16.180 00:00:35.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-60qrfqqn.tsv b/january-slates/golds/cpb-aacip-189-60qrfqqn.tsv new file mode 100644 index 00000000..620e9659 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-60qrfqqn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-60qrfqqn Speaking of Rochester 00:00:27.280 00:00:35.060 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-63fxpvk5.tsv b/january-slates/golds/cpb-aacip-189-63fxpvk5.tsv new file mode 100644 index 00000000..68780351 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-63fxpvk5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-63fxpvk5 Speaking of Rochester 00:00:23.040 00:00:30.120 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-63fxpvmw.tsv b/january-slates/golds/cpb-aacip-189-63fxpvmw.tsv new file mode 100644 index 00000000..9985a04c --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-63fxpvmw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-63fxpvmw Speaking of Rochester 00:00:20.190 00:00:28.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-65h9w6k3.tsv b/january-slates/golds/cpb-aacip-189-65h9w6k3.tsv new file mode 100644 index 00000000..2507a08e --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-65h9w6k3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-65h9w6k3 The Rochester I Know 00:00:07.000 00:00:29.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-67jq2jzc.tsv b/january-slates/golds/cpb-aacip-189-67jq2jzc.tsv new file mode 100644 index 00000000..37591e0a --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-67jq2jzc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-67jq2jzc The Rochester I Know 00:00:06.000 00:00:20.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-68kd57j0.tsv b/january-slates/golds/cpb-aacip-189-68kd57j0.tsv new file mode 100644 index 00000000..da544d70 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-68kd57j0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-68kd57j0 The Rochester I Know 00:00:10.070 00:00:26.280 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-189-72p5hxzn.tsv b/january-slates/golds/cpb-aacip-189-72p5hxzn.tsv new file mode 100644 index 00000000..e10dabf3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-72p5hxzn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-72p5hxzn Speaking of Rochester 00:01:20.090 00:01:27.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-741rnh6k.tsv b/january-slates/golds/cpb-aacip-189-741rnh6k.tsv new file mode 100644 index 00000000..9abed088 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-741rnh6k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-741rnh6k Speaking of Rochester 00:00:21.220 00:00:29.210 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-784j16mh.tsv b/january-slates/golds/cpb-aacip-189-784j16mh.tsv new file mode 100644 index 00000000..5ebe2459 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-784j16mh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-784j16mh Speaking of Rochester 00:00:24.250 00:00:32.090 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-784j16n7.tsv b/january-slates/golds/cpb-aacip-189-784j16n7.tsv new file mode 100644 index 00000000..c35e8436 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-784j16n7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-784j16n7 Speaking of Rochester 00:00:24.260 00:00:32.250 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-80ht7fms.tsv b/january-slates/golds/cpb-aacip-189-80ht7fms.tsv new file mode 100644 index 00000000..4decbd83 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-80ht7fms.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-80ht7fms The Rochester I Know 00:00:08.070 00:00:34.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-80vq8bgg.tsv b/january-slates/golds/cpb-aacip-189-80vq8bgg.tsv new file mode 100644 index 00000000..8e11d191 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-80vq8bgg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-80vq8bgg The Rochester I Know 00:00:05.240 00:00:38.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-84zgn223.tsv b/january-slates/golds/cpb-aacip-189-84zgn223.tsv new file mode 100644 index 00000000..64c349b3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-84zgn223.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-84zgn223 Speaking of Rochester 00:00:24.160 00:00:32.150 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-86b2rmdf.tsv b/january-slates/golds/cpb-aacip-189-86b2rmdf.tsv new file mode 100644 index 00000000..0caf40d3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-86b2rmdf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-86b2rmdf The Rochester I Know 00:00:05.090 00:00:21.150 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-91fj707s.tsv b/january-slates/golds/cpb-aacip-189-91fj707s.tsv new file mode 100644 index 00000000..a62a8c76 --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-91fj707s.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-91fj707s The Rochester I Know 00:00:15.130 00:00:31.120 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-92t4bjtn.tsv b/january-slates/golds/cpb-aacip-189-92t4bjtn.tsv new file mode 100644 index 00000000..8212b91b --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-92t4bjtn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-92t4bjtn Speaking of Rochester 00:00:25.160 00:00:33.100 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-189-93ttf74w.tsv b/january-slates/golds/cpb-aacip-189-93ttf74w.tsv new file mode 100644 index 00000000..e593059d --- /dev/null +++ b/january-slates/golds/cpb-aacip-189-93ttf74w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-189-93ttf74w The Rochester I Know 00:00:09.080 00:00:19.130 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-074tmrfw.tsv b/january-slates/golds/cpb-aacip-200-074tmrfw.tsv new file mode 100644 index 00000000..9e278b8f --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-074tmrfw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-074tmrfw Across Indiana 00:00:10.140 00:00:23.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-1937pzw7.tsv b/january-slates/golds/cpb-aacip-200-1937pzw7.tsv new file mode 100644 index 00000000..d6a10052 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-1937pzw7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-1937pzw7 Across Indiana 00:00:10.280 00:00:24.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-225b008g.tsv b/january-slates/golds/cpb-aacip-200-225b008g.tsv new file mode 100644 index 00000000..3743d089 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-225b008g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-225b008g Across Indiana 00:00:11.090 00:00:24.060 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-27zkh4b3.tsv b/january-slates/golds/cpb-aacip-200-27zkh4b3.tsv new file mode 100644 index 00000000..12b37428 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-27zkh4b3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-27zkh4b3 Across Indiana 00:00:10.250 00:00:23.250 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-31qftz5j.tsv b/january-slates/golds/cpb-aacip-200-31qftz5j.tsv new file mode 100644 index 00000000..27b71645 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-31qftz5j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-31qftz5j Across Indiana 00:00:10.130 00:00:23.170 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-31qftz68.tsv b/january-slates/golds/cpb-aacip-200-31qftz68.tsv new file mode 100644 index 00000000..b84a7813 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-31qftz68.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-31qftz68 Across Indiana 00:00:10.210 00:00:23.250 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-34fn338d.tsv b/january-slates/golds/cpb-aacip-200-34fn338d.tsv new file mode 100644 index 00000000..b988f803 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-34fn338d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-34fn338d Across Indiana 00:00:10.260 00:00:24.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-36547jkm.tsv b/january-slates/golds/cpb-aacip-200-36547jkm.tsv new file mode 100644 index 00000000..207ae7a0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-36547jkm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-36547jkm Across Indiana 00:00:10.150 00:00:23.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-36tx9bnn.tsv b/january-slates/golds/cpb-aacip-200-36tx9bnn.tsv new file mode 100644 index 00000000..3c813976 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-36tx9bnn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-36tx9bnn Across Indiana 00:00:10.100 00:00:23.140 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-375tb736.tsv b/january-slates/golds/cpb-aacip-200-375tb736.tsv new file mode 100644 index 00000000..26b3877c --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-375tb736.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-375tb736 Across Indiana 00:00:10.170 00:00:23.210 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-386hdx1d.tsv b/january-slates/golds/cpb-aacip-200-386hdx1d.tsv new file mode 100644 index 00000000..dc526955 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-386hdx1d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-386hdx1d Across Indiana 00:00:10.270 00:00:24.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-43nvx5rv.tsv b/january-slates/golds/cpb-aacip-200-43nvx5rv.tsv new file mode 100644 index 00000000..100a4baa --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-43nvx5rv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-43nvx5rv Across Indiana 00:00:10.280 00:00:24.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-5269pg71.tsv b/january-slates/golds/cpb-aacip-200-5269pg71.tsv new file mode 100644 index 00000000..5d9375ab --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-5269pg71.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-5269pg71 Across Indiana 00:00:10.140 00:00:23.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-558czgn1.tsv b/january-slates/golds/cpb-aacip-200-558czgn1.tsv new file mode 100644 index 00000000..505e76c9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-558czgn1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-558czgn1 Across Indiana 00:00:10.280 00:00:24.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-58bg7hk6.tsv b/january-slates/golds/cpb-aacip-200-58bg7hk6.tsv new file mode 100644 index 00000000..4aa2e676 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-58bg7hk6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-58bg7hk6 Across Indiana 00:00:10.250 00:00:23.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-58bg7hmx.tsv b/january-slates/golds/cpb-aacip-200-58bg7hmx.tsv new file mode 100644 index 00000000..4294794c --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-58bg7hmx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-58bg7hmx Across Indiana 00:00:10.260 00:00:24.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-64thtfsf.tsv b/january-slates/golds/cpb-aacip-200-64thtfsf.tsv new file mode 100644 index 00000000..eedd2f82 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-64thtfsf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-64thtfsf Across Indiana 00:00:11.260 00:00:25.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-67jq2kz3.tsv b/january-slates/golds/cpb-aacip-200-67jq2kz3.tsv new file mode 100644 index 00000000..c4778af4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-67jq2kz3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-67jq2kz3 Across Indiana 00:00:10.280 00:00:24.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-708w9qpq.tsv b/january-slates/golds/cpb-aacip-200-708w9qpq.tsv new file mode 100644 index 00000000..423d90d1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-708w9qpq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-708w9qpq Across Indiana 00:00:10.080 00:00:23.120 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-7312jvbg.tsv b/january-slates/golds/cpb-aacip-200-7312jvbg.tsv new file mode 100644 index 00000000..baa98679 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-7312jvbg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-7312jvbg Across Indiana 00:00:10.140 00:00:23.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-74cnpf7m.tsv b/january-slates/golds/cpb-aacip-200-74cnpf7m.tsv new file mode 100644 index 00000000..7160726a --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-74cnpf7m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-74cnpf7m Across Indiana 00:00:10.280 00:00:24.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-805x6m6x.tsv b/january-slates/golds/cpb-aacip-200-805x6m6x.tsv new file mode 100644 index 00000000..80bad6b7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-805x6m6x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-805x6m6x Across Indiana 00:00:09.290 00:00:23.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-84zgn2vs.tsv b/january-slates/golds/cpb-aacip-200-84zgn2vs.tsv new file mode 100644 index 00000000..f888508b --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-84zgn2vs.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-84zgn2vs Across Indiana 00:00:11.000 00:00:24.040 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-86nzsjgm.tsv b/january-slates/golds/cpb-aacip-200-86nzsjgm.tsv new file mode 100644 index 00000000..1df50ab1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-86nzsjgm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-86nzsjgm Across Indiana 00:00:10.260 00:00:24.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-881jx3pq.tsv b/january-slates/golds/cpb-aacip-200-881jx3pq.tsv new file mode 100644 index 00000000..eb00f425 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-881jx3pq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-881jx3pq Across Indiana 00:00:10.290 00:00:24.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-902z3ftx.tsv b/january-slates/golds/cpb-aacip-200-902z3ftx.tsv new file mode 100644 index 00000000..13abd8cc --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-902z3ftx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-902z3ftx Across Indiana 00:00:10.210 00:00:23.250 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-90dv4br2.tsv b/january-slates/golds/cpb-aacip-200-90dv4br2.tsv new file mode 100644 index 00000000..a22dec31 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-90dv4br2.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-90dv4br2 Across Indiana 00:00:10.260 00:00:24.000 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-92g79pn5.tsv b/january-slates/golds/cpb-aacip-200-92g79pn5.tsv new file mode 100644 index 00000000..9cfb06fd --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-92g79pn5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-92g79pn5 Across Indiana 00:00:12.250 00:00:25.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-945qg5jf.tsv b/january-slates/golds/cpb-aacip-200-945qg5jf.tsv new file mode 100644 index 00000000..5ac18027 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-945qg5jf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-945qg5jf Across Indiana 00:00:10.140 00:00:23.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-200-96wwq9p6.tsv b/january-slates/golds/cpb-aacip-200-96wwq9p6.tsv new file mode 100644 index 00000000..3a6f6963 --- /dev/null +++ b/january-slates/golds/cpb-aacip-200-96wwq9p6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-200-96wwq9p6 Across Indiana 00:00:11.240 00:00:24.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-042rcjzf.tsv b/january-slates/golds/cpb-aacip-235-042rcjzf.tsv new file mode 100644 index 00000000..91759b04 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-042rcjzf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-042rcjzf Outlook 00:00:05.240 00:00:13.250 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-15bcd0gv.tsv b/january-slates/golds/cpb-aacip-235-15bcd0gv.tsv new file mode 100644 index 00000000..9e147a6c --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-15bcd0gv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-15bcd0gv Outlook 00:00:09.280 00:00:17.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-18dfp1rn.tsv b/january-slates/golds/cpb-aacip-235-18dfp1rn.tsv new file mode 100644 index 00000000..c8aecb28 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-18dfp1rn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-18dfp1rn Outlook 00:00:05.020 00:00:13.040 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-19f4rq7f.tsv b/january-slates/golds/cpb-aacip-235-19f4rq7f.tsv new file mode 100644 index 00000000..44c5ebeb --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-19f4rq7f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-19f4rq7f Outlook 00:00:05.160 00:00:13.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-20ftvbhk.tsv b/january-slates/golds/cpb-aacip-235-20ftvbhk.tsv new file mode 100644 index 00000000..f0d3ae14 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-20ftvbhk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-20ftvbhk Outlook 00:00:09.250 00:00:17.260 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-36548ck9.tsv b/january-slates/golds/cpb-aacip-235-36548ck9.tsv new file mode 100644 index 00000000..22c0af21 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-36548ck9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-36548ck9 Outlook 00:00:05.110 00:00:13.120 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-42n5v9dk.tsv b/january-slates/golds/cpb-aacip-235-42n5v9dk.tsv new file mode 100644 index 00000000..4f40e082 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-42n5v9dk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-42n5v9dk Outlook 00:00:06.080 00:00:14.110 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-47rn9r0k.tsv b/january-slates/golds/cpb-aacip-235-47rn9r0k.tsv new file mode 100644 index 00000000..820825c5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-47rn9r0k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-47rn9r0k Outlook 00:00:09.020 00:00:17.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-49t1h18x.tsv b/january-slates/golds/cpb-aacip-235-49t1h18x.tsv new file mode 100644 index 00000000..1f6c9983 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-49t1h18x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-49t1h18x Outlook 00:00:11.130 00:00:19.140 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-5370swqf.tsv b/january-slates/golds/cpb-aacip-235-5370swqf.tsv new file mode 100644 index 00000000..d46fdd5b --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-5370swqf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-5370swqf Outlook 00:00:10.270 00:00:18.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-580k7dqh.tsv b/january-slates/golds/cpb-aacip-235-580k7dqh.tsv new file mode 100644 index 00000000..56000beb --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-580k7dqh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-580k7dqh Outlook 00:00:05.180 00:00:13.200 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-67wm48rb.tsv b/january-slates/golds/cpb-aacip-235-67wm48rb.tsv new file mode 100644 index 00000000..4e73a4e4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-67wm48rb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-67wm48rb Outlook 00:00:05.080 00:00:13.100 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-69z09p02.tsv b/january-slates/golds/cpb-aacip-235-69z09p02.tsv new file mode 100644 index 00000000..4df0d92c --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-69z09p02.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-69z09p02 Outlook 00:00:21.120 00:00:30.200 t True free text no diff --git a/january-slates/golds/cpb-aacip-235-86b2sgc4.tsv b/january-slates/golds/cpb-aacip-235-86b2sgc4.tsv new file mode 100644 index 00000000..57c25a09 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-86b2sgc4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-86b2sgc4 Outlook 00:00:09.150 00:00:17.160 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-92g7bgts.tsv b/january-slates/golds/cpb-aacip-235-92g7bgts.tsv new file mode 100644 index 00000000..f6db9fb8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-92g7bgts.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-92g7bgts Outlook 00:00:04.260 00:00:12.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-92g7bgvh.tsv b/january-slates/golds/cpb-aacip-235-92g7bgvh.tsv new file mode 100644 index 00000000..087e57fe --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-92g7bgvh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-92g7bgvh Outlook 00:00:11.000 00:00:18.270 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-235-988gvq43.tsv b/january-slates/golds/cpb-aacip-235-988gvq43.tsv new file mode 100644 index 00000000..e12ed333 --- /dev/null +++ b/january-slates/golds/cpb-aacip-235-988gvq43.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-235-988gvq43 Outlook 00:00:05.119 00:00:13.220 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-29-01pg4g2x.tsv b/january-slates/golds/cpb-aacip-29-01pg4g2x.tsv new file mode 100644 index 00000000..5ac03478 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-01pg4g2x.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-01pg4g2x Prime Time Wisconsin 00:00:00.000 00:00:08.140 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-08v9s6dt.tsv b/january-slates/golds/cpb-aacip-29-08v9s6dt.tsv new file mode 100644 index 00000000..3751be9b --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-08v9s6dt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-08v9s6dt Prime Time Wisconsin 00:00:00.000 00:00:26.000 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-106wwrfp.tsv b/january-slates/golds/cpb-aacip-29-106wwrfp.tsv new file mode 100644 index 00000000..4175db9e --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-106wwrfp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-106wwrfp Prime Time Wisconsin 00:00:00.000 00:00:05.010 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-117m0f2f.tsv b/january-slates/golds/cpb-aacip-29-117m0f2f.tsv new file mode 100644 index 00000000..2551a423 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-117m0f2f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-117m0f2f Prime Time Wisconsin 00:00:00.000 00:00:04.200 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-11xd270w.tsv b/january-slates/golds/cpb-aacip-29-11xd270w.tsv new file mode 100644 index 00000000..62a4bbbc --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-11xd270w.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-11xd270w Prime Time Wisconsin 00:00:00.000 00:00:06.230 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-15bcc4sg.tsv b/january-slates/golds/cpb-aacip-29-15bcc4sg.tsv new file mode 100644 index 00000000..db63d5aa --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-15bcc4sg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-15bcc4sg Prime Time Wisconsin 00:00:27.230 00:00:37.000 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-22v41r8t.tsv b/january-slates/golds/cpb-aacip-29-22v41r8t.tsv new file mode 100644 index 00000000..fe6bb29a --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-22v41r8t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-22v41r8t Prime Time Wisconsin 00:00:00.000 00:00:06.070 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-24wh73nq.tsv b/january-slates/golds/cpb-aacip-29-24wh73nq.tsv new file mode 100644 index 00000000..d7a8f70d --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-24wh73nq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-24wh73nq Wisconsin Week 00:00:00.000 00:00:07.050 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-29p2nkpp.tsv b/january-slates/golds/cpb-aacip-29-29p2nkpp.tsv new file mode 100644 index 00000000..9276e3b5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-29p2nkpp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-29p2nkpp Wisconsin Week 00:00:04.280 00:00:44.190 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-35t76n4f.tsv b/january-slates/golds/cpb-aacip-29-35t76n4f.tsv new file mode 100644 index 00000000..5b8e690b --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-35t76n4f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-35t76n4f Wisconsin Week 00:00:04.200 00:00:39.210 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-3976hk2f.tsv b/january-slates/golds/cpb-aacip-29-3976hk2f.tsv new file mode 100644 index 00000000..be3d961f --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-3976hk2f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-3976hk2f Wisconsin Week 00:00:00.000 00:00:06.190 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-41mgqtx3.tsv b/january-slates/golds/cpb-aacip-29-41mgqtx3.tsv new file mode 100644 index 00000000..7be26f26 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-41mgqtx3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-41mgqtx3 Prime Time Wisconsin 00:00:05.060 00:00:15.050 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-440rz2bm.tsv b/january-slates/golds/cpb-aacip-29-440rz2bm.tsv new file mode 100644 index 00000000..f206cd78 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-440rz2bm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-440rz2bm Wisconsin Week 00:00:00.150 00:00:11.080 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-46254dmz.tsv b/january-slates/golds/cpb-aacip-29-46254dmz.tsv new file mode 100644 index 00000000..ebf8a3ee --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-46254dmz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-46254dmz Prime Time Wisconsin 00:00:07.020 00:00:17.010 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-48ffbnfm.tsv b/january-slates/golds/cpb-aacip-29-48ffbnfm.tsv new file mode 100644 index 00000000..6318f127 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-48ffbnfm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-48ffbnfm Prime Time Wisconsin 00:00:00.000 00:00:09.210 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-4947dfbw.tsv b/january-slates/golds/cpb-aacip-29-4947dfbw.tsv new file mode 100644 index 00000000..761cdf7e --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-4947dfbw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-4947dfbw Wisconsin Week 00:00:00.000 00:00:07.270 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-49g4f9wp.tsv b/january-slates/golds/cpb-aacip-29-49g4f9wp.tsv new file mode 100644 index 00000000..2c1896c1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-49g4f9wp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-49g4f9wp Wisconsin Week 00:00:00.000 00:00:18.210 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-50tqjw98.tsv b/january-slates/golds/cpb-aacip-29-50tqjw98.tsv new file mode 100644 index 00000000..fc459c3a --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-50tqjw98.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-50tqjw98 Wisconsin Week 00:00:05.190 00:00:40.120 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-515mks96.tsv b/january-slates/golds/cpb-aacip-29-515mks96.tsv new file mode 100644 index 00000000..75fa7e6f --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-515mks96.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-515mks96 Prime Time Wisconsin 00:00:00.000 00:00:06.190 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-5269pfn6.tsv b/january-slates/golds/cpb-aacip-29-5269pfn6.tsv new file mode 100644 index 00000000..5d02052b --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-5269pfn6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-5269pfn6 Wisconsin Week 00:00:00.000 00:00:04.120 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-57np5qmn.tsv b/january-slates/golds/cpb-aacip-29-57np5qmn.tsv new file mode 100644 index 00000000..fe218438 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-57np5qmn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-57np5qmn Wisconsin Week 00:00:05.260 00:00:20.230 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-61rfjdxq.tsv b/january-slates/golds/cpb-aacip-29-61rfjdxq.tsv new file mode 100644 index 00000000..22c24430 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-61rfjdxq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-61rfjdxq Wisconsin Week 00:00:00.000 00:00:06.040 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-66j0zx33.tsv b/january-slates/golds/cpb-aacip-29-66j0zx33.tsv new file mode 100644 index 00000000..1d2ae2cd --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-66j0zx33.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-66j0zx33 Wisconsin Week 00:00:00.000 00:00:05.110 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-66vx0sr0.tsv b/january-slates/golds/cpb-aacip-29-66vx0sr0.tsv new file mode 100644 index 00000000..fc0e3f13 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-66vx0sr0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-66vx0sr0 Wisconsin Week 00:00:00.000 00:00:12.140 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-687h4cjj.tsv b/january-slates/golds/cpb-aacip-29-687h4cjj.tsv new file mode 100644 index 00000000..c80f01f7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-687h4cjj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-687h4cjj Prime Time Wisconsin 00:00:00.000 00:00:13.070 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-68kd58pq.tsv b/january-slates/golds/cpb-aacip-29-68kd58pq.tsv new file mode 100644 index 00000000..bce85261 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-68kd58pq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-68kd58pq Prime Time Wisconsin 00:00:04.260 00:00:14.250 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-7312jv8m.tsv b/january-slates/golds/cpb-aacip-29-7312jv8m.tsv new file mode 100644 index 00000000..50336a4e --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-7312jv8m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-7312jv8m Prime Time Wisconsin 00:00:07.030 00:00:17.010 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-7634tw3m.tsv b/january-slates/golds/cpb-aacip-29-7634tw3m.tsv new file mode 100644 index 00000000..c1944fd7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-7634tw3m.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-7634tw3m Wisconsin Week 00:00:04.250 00:00:15.260 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-773txjgr.tsv b/january-slates/golds/cpb-aacip-29-773txjgr.tsv new file mode 100644 index 00000000..a8f10967 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-773txjgr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-773txjgr Wisconsin Week 00:00:00.000 00:00:05.110 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-784j17c1.tsv b/january-slates/golds/cpb-aacip-29-784j17c1.tsv new file mode 100644 index 00000000..28ea3dd2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-784j17c1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-784j17c1 Wisconsin Week 00:00:05.070 00:00:22.170 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-78tb30x7.tsv b/january-slates/golds/cpb-aacip-29-78tb30x7.tsv new file mode 100644 index 00000000..36d19a36 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-78tb30x7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-78tb30x7 Wisconsin Week 00:00:05.030 00:00:18.030 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-84mkm5rk.tsv b/january-slates/golds/cpb-aacip-29-84mkm5rk.tsv new file mode 100644 index 00000000..f251038a --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-84mkm5rk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-84mkm5rk Wisconsin Week 00:00:04.270 00:00:18.110 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-86nzshb0.tsv b/january-slates/golds/cpb-aacip-29-86nzshb0.tsv new file mode 100644 index 00000000..2767f41d --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-86nzshb0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-86nzshb0 Prime Time Wisconsin 00:00:00.000 00:00:04.210 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-89280s5z.tsv b/january-slates/golds/cpb-aacip-29-89280s5z.tsv new file mode 100644 index 00000000..fa75b817 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-89280s5z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-89280s5z Prime Time Wisconsin 00:00:04.220 00:00:23.250 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-902z3fdn.tsv b/january-slates/golds/cpb-aacip-29-902z3fdn.tsv new file mode 100644 index 00000000..0603dff9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-902z3fdn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-902z3fdn Prime Time Wisconsin 00:00:04.180 00:00:09.260 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-95w6mm5b.tsv b/january-slates/golds/cpb-aacip-29-95w6mm5b.tsv new file mode 100644 index 00000000..07b51adc --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-95w6mm5b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-95w6mm5b Wisconsin Week 00:00:09.210 00:00:24.290 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-95w6mmcg.tsv b/january-slates/golds/cpb-aacip-29-95w6mmcg.tsv new file mode 100644 index 00000000..8f248677 --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-95w6mmcg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-95w6mmcg Prime Time Wisconsin 00:00:07.010 00:00:27.250 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-97kps24j.tsv b/january-slates/golds/cpb-aacip-29-97kps24j.tsv new file mode 100644 index 00000000..d9f21f8a --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-97kps24j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-97kps24j Prime Time Wisconsin 00:00:00.000 00:00:06.140 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-29-9995xhq3.tsv b/january-slates/golds/cpb-aacip-29-9995xhq3.tsv new file mode 100644 index 00000000..ff8f325e --- /dev/null +++ b/january-slates/golds/cpb-aacip-29-9995xhq3.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-29-9995xhq3 Wisconsin Week 00:00:05.210 00:00:23.200 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-03qv9sz0.tsv b/january-slates/golds/cpb-aacip-293-03qv9sz0.tsv new file mode 100644 index 00000000..b3089209 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-03qv9sz0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-03qv9sz0 Evening Exchange 00:00:13.100 00:00:32.110 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-0966t2q0.tsv b/january-slates/golds/cpb-aacip-293-0966t2q0.tsv new file mode 100644 index 00000000..85217cab --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-0966t2q0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-0966t2q0 Evening Exchange 00:00:06.180 00:00:13.220 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-10jsxngk.tsv b/january-slates/golds/cpb-aacip-293-10jsxngk.tsv new file mode 100644 index 00000000..e44f1fd4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-10jsxngk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-10jsxngk Evening Exchange 00:00:34.080 00:00:44.070 t True free text no diff --git a/january-slates/golds/cpb-aacip-293-13905s74.tsv b/january-slates/golds/cpb-aacip-293-13905s74.tsv new file mode 100644 index 00000000..693f7eb3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-13905s74.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-13905s74 Evening Exchange 00:00:04.210 00:00:13.070 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-30prr83h.tsv b/january-slates/golds/cpb-aacip-293-30prr83h.tsv new file mode 100644 index 00000000..ca050571 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-30prr83h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-30prr83h Evening Exchange 00:00:06.010 00:00:11.260 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-31cjt22h.tsv b/january-slates/golds/cpb-aacip-293-31cjt22h.tsv new file mode 100644 index 00000000..600adff4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-31cjt22h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-31cjt22h Evening Exchange 00:00:05.230 00:00:17.050 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-3331zh63.tsv b/january-slates/golds/cpb-aacip-293-3331zh63.tsv new file mode 100644 index 00000000..7113a4d1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-3331zh63.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-3331zh63 Evening Exchange 00:00:08.200 00:00:17.020 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-34sj3xzh.tsv b/january-slates/golds/cpb-aacip-293-34sj3xzh.tsv new file mode 100644 index 00000000..56540588 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-34sj3xzh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-34sj3xzh Evening Exchange 00:00:09.260 00:00:19.250 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-38w9gntx.tsv b/january-slates/golds/cpb-aacip-293-38w9gntx.tsv new file mode 100644 index 00000000..a8da51f4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-38w9gntx.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-38w9gntx Evening Exchange 00:00:14.050 00:00:56.130 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-472v72kc.tsv b/january-slates/golds/cpb-aacip-293-472v72kc.tsv new file mode 100644 index 00000000..f0b2cef7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-472v72kc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-472v72kc Evening Exchange 00:00:34.270 00:00:54.260 t True free text no diff --git a/january-slates/golds/cpb-aacip-293-60cvdv8f.tsv b/january-slates/golds/cpb-aacip-293-60cvdv8f.tsv new file mode 100644 index 00000000..c9be1cb7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-60cvdv8f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-60cvdv8f Evening Exchange 00:00:09.110 00:00:21.280 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-68kd582n.tsv b/january-slates/golds/cpb-aacip-293-68kd582n.tsv new file mode 100644 index 00000000..ef558ed0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-68kd582n.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-68kd582n Evening Exchange 00:00:05.170 00:00:12.270 t True key-value pairs background animation diff --git a/january-slates/golds/cpb-aacip-293-741rnhtq.tsv b/january-slates/golds/cpb-aacip-293-741rnhtq.tsv new file mode 100644 index 00000000..6dd5e50b --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-741rnhtq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-741rnhtq Evening Exchange 00:00:32.160 00:00:45.200 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-293-848pk8hf.tsv b/january-slates/golds/cpb-aacip-293-848pk8hf.tsv new file mode 100644 index 00000000..66e1e4ec --- /dev/null +++ b/january-slates/golds/cpb-aacip-293-848pk8hf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-293-848pk8hf Evening Exchange 00:00:34.290 00:00:44.280 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-03cz8wl6.tsv b/january-slates/golds/cpb-aacip-322-03cz8wl6.tsv new file mode 100644 index 00000000..5ffde5bc --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-03cz8wl6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-03cz8wl6 Up Close with Cathy Unruh 00:00:05.240 00:00:13.120 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-04rjdg2h.tsv b/january-slates/golds/cpb-aacip-322-04rjdg2h.tsv new file mode 100644 index 00000000..1d0b9161 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-04rjdg2h.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-04rjdg2h Sun Coast Business Forum 00:00:05.110 00:00:08.100 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-074tmqt8.tsv b/january-slates/golds/cpb-aacip-322-074tmqt8.tsv new file mode 100644 index 00000000..5beb3cf3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-074tmqt8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-074tmqt8 Up Close with Cathy Unruh 00:00:05.010 00:00:12.290 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-11xd26h5.tsv b/january-slates/golds/cpb-aacip-322-11xd26h5.tsv new file mode 100644 index 00000000..ce4a154d --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-11xd26h5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-11xd26h5 Up Close with Cathy Unruh 00:00:15.150 00:00:25.140 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-13lw6ngj.tsv b/january-slates/golds/cpb-aacip-322-13lw6ngj.tsv new file mode 100644 index 00000000..ff218263 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-13lw6ngj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-13lw6ngj Up Close with Cathy Unruh 00:00:05.160 00:00:13.150 t True free text countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-24jm66h7.tsv b/january-slates/golds/cpb-aacip-322-24jm66h7.tsv new file mode 100644 index 00000000..908412f4 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-24jm66h7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-24jm66h7 Up Close with Cathy Unruh 00:00:05.030 00:00:13.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-28ncjx9j.tsv b/january-slates/golds/cpb-aacip-322-28ncjx9j.tsv new file mode 100644 index 00000000..ecc5bbfd --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-28ncjx9j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-28ncjx9j Up Close with Cathy Unruh 00:00:12.170 00:00:17.210 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-29b5mp4z.tsv b/january-slates/golds/cpb-aacip-322-29b5mp4z.tsv new file mode 100644 index 00000000..4d3b8255 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-29b5mp4z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-29b5mp4z Sun Coast Business Forum 00:00:05.170 00:00:13.160 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-29b5mp5p.tsv b/january-slates/golds/cpb-aacip-322-29b5mp5p.tsv new file mode 100644 index 00000000..5a5db1a2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-29b5mp5p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-29b5mp5p Sun Coast Business Forum 00:00:04.260 00:00:12.240 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-29b5mpzb.tsv b/january-slates/golds/cpb-aacip-322-29b5mpzb.tsv new file mode 100644 index 00000000..71b885b5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-29b5mpzb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-29b5mpzb Up Close with Cathy Unruh 00:00:25.000 00:00:32.280 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-300zpfvm.tsv b/january-slates/golds/cpb-aacip-322-300zpfvm.tsv new file mode 100644 index 00000000..a09d0d3e --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-300zpfvm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-300zpfvm Sun Coast Business Forum 00:00:10.240 00:00:18.220 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-31qftx5z.tsv b/january-slates/golds/cpb-aacip-322-31qftx5z.tsv new file mode 100644 index 00000000..97ae7642 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-31qftx5z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-31qftx5z Sun Coast Business Forum 00:00:05.090 00:00:13.170 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-31qftx7d.tsv b/january-slates/golds/cpb-aacip-322-31qftx7d.tsv new file mode 100644 index 00000000..ebe39f50 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-31qftx7d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-31qftx7d Sun Coast Business Forum 00:00:06.040 00:00:14.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-3331zgm4.tsv b/january-slates/golds/cpb-aacip-322-3331zgm4.tsv new file mode 100644 index 00000000..333aa811 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-3331zgm4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-3331zgm4 Sun Coast Business Forum 00:00:05.150 00:00:13.140 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-3331zh3z.tsv b/january-slates/golds/cpb-aacip-322-3331zh3z.tsv new file mode 100644 index 00000000..d37d0d48 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-3331zh3z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-3331zh3z Up Close with Cathy Unruh 00:00:09.070 00:00:14.060 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-343r25h9.tsv b/january-slates/golds/cpb-aacip-322-343r25h9.tsv new file mode 100644 index 00000000..245bd326 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-343r25h9.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-343r25h9 Up Close with Cathy Unruh 00:00:10.140 00:00:15.130 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-36tx99km.tsv b/january-slates/golds/cpb-aacip-322-36tx99km.tsv new file mode 100644 index 00000000..233f0b84 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-36tx99km.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-36tx99km Up Close with Cathy Unruh 00:00:05.030 00:00:13.020 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-3976hjwj.tsv b/january-slates/golds/cpb-aacip-322-3976hjwj.tsv new file mode 100644 index 00000000..e57cd7c9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-3976hjwj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-3976hjwj Up Close with Cathy Unruh 00:00:06.230 00:00:14.220 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-3976hjz0.tsv b/january-slates/golds/cpb-aacip-322-3976hjz0.tsv new file mode 100644 index 00000000..d292326c --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-3976hjz0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-3976hjz0 Up Close with Cathy Unruh 00:00:15.090 00:00:25.080 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-43nvx4bk.tsv b/january-slates/golds/cpb-aacip-322-43nvx4bk.tsv new file mode 100644 index 00000000..e49529f5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-43nvx4bk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-43nvx4bk Sun Coast Business Forum 00:00:25.050 00:00:33.030 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-48ffbldb.tsv b/january-slates/golds/cpb-aacip-322-48ffbldb.tsv new file mode 100644 index 00000000..1fe40561 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-48ffbldb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-48ffbldb Up Close with Cathy Unruh 00:00:05.040 00:00:13.030 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-52w3r6lw.tsv b/january-slates/golds/cpb-aacip-322-52w3r6lw.tsv new file mode 100644 index 00000000..8ebb51d0 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-52w3r6lw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-52w3r6lw Up Close with Cathy Unruh 00:00:09.150 00:00:14.140 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-55l90bhr.tsv b/january-slates/golds/cpb-aacip-322-55l90bhr.tsv new file mode 100644 index 00000000..63bdd9df --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-55l90bhr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-55l90bhr Up Close with Cathy Unruh 00:00:19.170 00:00:29.160 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-55m90c8c.tsv b/january-slates/golds/cpb-aacip-322-55m90c8c.tsv new file mode 100644 index 00000000..1357854d --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-55m90c8c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-55m90c8c Up Close with Cathy Unruh 00:00:04.170 00:00:12.150 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-569324rj.tsv b/january-slates/golds/cpb-aacip-322-569324rj.tsv new file mode 100644 index 00000000..033e2837 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-569324rj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-569324rj Up Close with Cathy Unruh 00:00:05.030 00:00:13.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-61rfjd1l.tsv b/january-slates/golds/cpb-aacip-322-61rfjd1l.tsv new file mode 100644 index 00000000..9ca0bdf3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-61rfjd1l.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-61rfjd1l Up Close with Cathy Unruh 00:00:05.120 00:00:13.110 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-61rfjd9d.tsv b/january-slates/golds/cpb-aacip-322-61rfjd9d.tsv new file mode 100644 index 00000000..853bf7e1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-61rfjd9d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-61rfjd9d Up Close with Cathy Unruh 00:00:15.040 00:00:25.030 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-62s4n2mj.tsv b/january-slates/golds/cpb-aacip-322-62s4n2mj.tsv new file mode 100644 index 00000000..e4655852 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-62s4n2mj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-62s4n2mj Sun Coast Business Forum 00:00:05.030 00:00:13.020 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-322-62s4n3bf.tsv b/january-slates/golds/cpb-aacip-322-62s4n3bf.tsv new file mode 100644 index 00000000..b5db2fb5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-62s4n3bf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-62s4n3bf Up Close with Cathy Unruh 00:00:09.270 00:00:19.260 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-65h9w7mn.tsv b/january-slates/golds/cpb-aacip-322-65h9w7mn.tsv new file mode 100644 index 00000000..24e1b4bd --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-65h9w7mn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-65h9w7mn Up Close with Cathy Unruh 00:00:15.030 00:00:25.020 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-720cg4wt.tsv b/january-slates/golds/cpb-aacip-322-720cg4wt.tsv new file mode 100644 index 00000000..6ace5892 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-720cg4wt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-720cg4wt Sun Coast Business Forum 00:00:05.080 00:00:15.090 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-72b8h1rh.tsv b/january-slates/golds/cpb-aacip-322-72b8h1rh.tsv new file mode 100644 index 00000000..3dee8aeb --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-72b8h1rh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-72b8h1rh Sun Coast Business Forum 00:00:30.130 00:00:33.140 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-73bzkqbw.tsv b/january-slates/golds/cpb-aacip-322-73bzkqbw.tsv new file mode 100644 index 00000000..60ee7c11 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-73bzkqbw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-73bzkqbw Sun Coast Business Forum 00:00:05.230 00:00:08.200 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-7634tvj7.tsv b/january-slates/golds/cpb-aacip-322-7634tvj7.tsv new file mode 100644 index 00000000..22f9782b --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-7634tvj7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-7634tvj7 Sun Coast Business Forum 00:00:25.020 00:00:33.010 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-76f1vrn0.tsv b/january-slates/golds/cpb-aacip-322-76f1vrn0.tsv new file mode 100644 index 00000000..7a846a4a --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-76f1vrn0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-76f1vrn0 Up Close with Cathy Unruh 00:00:15.100 00:00:25.090 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-784j1746.tsv b/january-slates/golds/cpb-aacip-322-784j1746.tsv new file mode 100644 index 00000000..161b704e --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-784j1746.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-784j1746 Up Close with Cathy Unruh 00:00:04.160 00:00:19.150 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-78gf23pp.tsv b/january-slates/golds/cpb-aacip-322-78gf23pp.tsv new file mode 100644 index 00000000..bc776afb --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-78gf23pp.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-78gf23pp Up Close with Cathy Unruh 00:00:15.170 00:00:25.160 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-83kwhg7z.tsv b/january-slates/golds/cpb-aacip-322-83kwhg7z.tsv new file mode 100644 index 00000000..2e3f848d --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-83kwhg7z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-83kwhg7z Sun Coast Business Forum 00:00:04.130 00:00:12.120 t True key-value pairs no diff --git a/january-slates/golds/cpb-aacip-322-83kwhg8p.tsv b/january-slates/golds/cpb-aacip-322-83kwhg8p.tsv new file mode 100644 index 00000000..8ea596be --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-83kwhg8p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-83kwhg8p Sun Coast Business Forum 00:00:04.180 00:00:12.170 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-83xsjcn7.tsv b/january-slates/golds/cpb-aacip-322-83xsjcn7.tsv new file mode 100644 index 00000000..3ac13bb6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-83xsjcn7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-83xsjcn7 Up Close with Cathy Unruh 00:00:15.040 00:00:25.030 t True free text no diff --git a/january-slates/golds/cpb-aacip-322-89d51ncg.tsv b/january-slates/golds/cpb-aacip-322-89d51ncg.tsv new file mode 100644 index 00000000..4e721d8d --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-89d51ncg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-89d51ncg Up Close with Cathy Unruh 00:00:05.060 00:00:13.050 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-924b8scw.tsv b/january-slates/golds/cpb-aacip-322-924b8scw.tsv new file mode 100644 index 00000000..35633192 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-924b8scw.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-924b8scw Sun Coast Business Forum 00:00:05.060 00:00:13.050 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-92t4bjgj.tsv b/january-slates/golds/cpb-aacip-322-92t4bjgj.tsv new file mode 100644 index 00000000..6c1a7586 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-92t4bjgj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-92t4bjgj Sun Coast Business Forum 00:00:24.280 00:00:32.270 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-93ttf72k.tsv b/january-slates/golds/cpb-aacip-322-93ttf72k.tsv new file mode 100644 index 00000000..458f70bd --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-93ttf72k.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-93ttf72k Sun Coast Business Forum 00:00:06.030 00:00:14.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-322-95w6mkvh.tsv b/january-slates/golds/cpb-aacip-322-95w6mkvh.tsv new file mode 100644 index 00000000..ef7f7500 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-95w6mkvh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-95w6mkvh Up Close with Cathy Unruh 00:00:06.280 00:00:14.280 t True key-value pairs background animation diff --git a/january-slates/golds/cpb-aacip-322-9673ng3q.tsv b/january-slates/golds/cpb-aacip-322-9673ng3q.tsv new file mode 100644 index 00000000..d42c29bf --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-9673ng3q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-9673ng3q Sun Coast Business Forum 00:00:05.140 00:00:13.170 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-322-98mcvqxc.tsv b/january-slates/golds/cpb-aacip-322-98mcvqxc.tsv new file mode 100644 index 00000000..e5a33547 --- /dev/null +++ b/january-slates/golds/cpb-aacip-322-98mcvqxc.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-322-98mcvqxc Sun Coast Business Forum 00:00:05.180 00:00:13.170 t True key-value pairs countdown; animation diff --git a/january-slates/golds/cpb-aacip-394-0322868j.tsv b/january-slates/golds/cpb-aacip-394-0322868j.tsv new file mode 100644 index 00000000..5ef1f84a --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-0322868j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-0322868j Wall Street Week 00:00:37.000 00:00:51.020 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-150gbd75.tsv b/january-slates/golds/cpb-aacip-394-150gbd75.tsv new file mode 100644 index 00000000..f7e5222b --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-150gbd75.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-150gbd75 Wall Street Week 00:00:11.000 00:00:29.090 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-16pzgvnd.tsv b/january-slates/golds/cpb-aacip-394-16pzgvnd.tsv new file mode 100644 index 00000000..e3249081 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-16pzgvnd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-16pzgvnd Wall Street Week 00:00:20.200 00:00:32.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-20sqvk0z.tsv b/january-slates/golds/cpb-aacip-394-20sqvk0z.tsv new file mode 100644 index 00000000..d9a93d8b --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-20sqvk0z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-20sqvk0z Wall Street Week 00:00:25.010 00:00:42.100 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-394-25k99270.tsv b/january-slates/golds/cpb-aacip-394-25k99270.tsv new file mode 100644 index 00000000..159763a9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-25k99270.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-25k99270 Wall Street Week 00:00:16.080 00:00:33.090 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-28nck2pq.tsv b/january-slates/golds/cpb-aacip-394-28nck2pq.tsv new file mode 100644 index 00000000..7d0a53b1 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-28nck2pq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-28nck2pq Wall Street Week 00:00:20.160 00:00:32.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-30prrfj6.tsv b/january-slates/golds/cpb-aacip-394-30prrfj6.tsv new file mode 100644 index 00000000..63d3b7ed --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-30prrfj6.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-30prrfj6 Wall Street Week 00:00:20.080 00:00:30.290 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-34sj440v.tsv b/january-slates/golds/cpb-aacip-394-34sj440v.tsv new file mode 100644 index 00000000..1ebdb74c --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-34sj440v.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-34sj440v Wall Street Week 00:00:20.180 00:00:32.260 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-35t76v43.tsv b/january-slates/golds/cpb-aacip-394-35t76v43.tsv new file mode 100644 index 00000000..44fa6995 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-35t76v43.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-35t76v43 Wall Street Week 00:00:20.020 00:00:32.220 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-37hqc8bh.tsv b/january-slates/golds/cpb-aacip-394-37hqc8bh.tsv new file mode 100644 index 00000000..05bc242a --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-37hqc8bh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-37hqc8bh Wall Street Week 00:00:20.260 00:00:33.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-44pk10gn.tsv b/january-slates/golds/cpb-aacip-394-44pk10gn.tsv new file mode 100644 index 00000000..1a442c98 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-44pk10gn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-44pk10gn Wall Street Week 00:00:20.220 00:00:33.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-57np5x9q.tsv b/january-slates/golds/cpb-aacip-394-57np5x9q.tsv new file mode 100644 index 00000000..6ef876f9 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-57np5x9q.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-57np5x9q Wall Street Week 00:00:20.030 00:00:32.100 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-59189f7b.tsv b/january-slates/golds/cpb-aacip-394-59189f7b.tsv new file mode 100644 index 00000000..1a78667e --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-59189f7b.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-59189f7b Wall Street Week 00:00:21.070 00:00:33.070 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-601zd3mb.tsv b/january-slates/golds/cpb-aacip-394-601zd3mb.tsv new file mode 100644 index 00000000..88191e27 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-601zd3mb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-601zd3mb Wall Street Week 00:00:17.100 00:00:33.040 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-63fxq1nn.tsv b/january-slates/golds/cpb-aacip-394-63fxq1nn.tsv new file mode 100644 index 00000000..51f1883a --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-63fxq1nn.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-63fxq1nn Wall Street Week 00:00:20.200 00:00:32.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-8605qwd7.tsv b/january-slates/golds/cpb-aacip-394-8605qwd7.tsv new file mode 100644 index 00000000..77b56d94 --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-8605qwd7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-8605qwd7 Wall Street Week 00:00:20.200 00:00:32.210 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-881jx8bt.tsv b/january-slates/golds/cpb-aacip-394-881jx8bt.tsv new file mode 100644 index 00000000..1a4daf2f --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-881jx8bt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-881jx8bt Wall Street Week 00:00:20.290 00:00:33.010 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-94hmh6pk.tsv b/january-slates/golds/cpb-aacip-394-94hmh6pk.tsv new file mode 100644 index 00000000..0d3dd10e --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-94hmh6pk.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-94hmh6pk Wall Street Week 00:00:15.100 00:00:27.230 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-394-9995xntg.tsv b/january-slates/golds/cpb-aacip-394-9995xntg.tsv new file mode 100644 index 00000000..668dcb9e --- /dev/null +++ b/january-slates/golds/cpb-aacip-394-9995xntg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-394-9995xntg Wall Street Week 00:00:02.140 00:00:14.190 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-009w13fb.tsv b/january-slates/golds/cpb-aacip-41-009w13fb.tsv new file mode 100644 index 00000000..2ce354d6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-009w13fb.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-009w13fb Art's the Thing 00:00:06.110 00:00:24.040 t True free text no diff --git a/january-slates/golds/cpb-aacip-41-074tmwc8.tsv b/january-slates/golds/cpb-aacip-41-074tmwc8.tsv new file mode 100644 index 00000000..977bc679 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-074tmwc8.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-074tmwc8 Art's the Thing 00:00:41.030 00:01:05.150 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-10wpzpt5.tsv b/january-slates/golds/cpb-aacip-41-10wpzpt5.tsv new file mode 100644 index 00000000..6a0275d6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-10wpzpt5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-10wpzpt5 Art's the Thing 00:00:40.140 00:01:07.030 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-13zs7qh0.tsv b/january-slates/golds/cpb-aacip-41-13zs7qh0.tsv new file mode 100644 index 00000000..fd92f64c --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-13zs7qh0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-13zs7qh0 Art's the Thing 00:00:40.270 00:01:17.180 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-14nk9bkf.tsv b/january-slates/golds/cpb-aacip-41-14nk9bkf.tsv new file mode 100644 index 00000000..3331e516 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-14nk9bkf.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-14nk9bkf Carolina Journal 00:00:04.220 00:00:47.230 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-16pzgq2f.tsv b/january-slates/golds/cpb-aacip-41-16pzgq2f.tsv new file mode 100644 index 00000000..7823020a --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-16pzgq2f.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-16pzgq2f Carolina Journal 00:00:05.020 00:00:28.250 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-171vhkmr.tsv b/january-slates/golds/cpb-aacip-41-171vhkmr.tsv new file mode 100644 index 00000000..93e2a3f6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-171vhkmr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-171vhkmr Carolina Journal 00:00:05.010 00:00:29.000 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-17qnkc9c.tsv b/january-slates/golds/cpb-aacip-41-17qnkc9c.tsv new file mode 100644 index 00000000..347c24cf --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-17qnkc9c.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-17qnkc9c Carolina Journal 00:00:05.070 00:00:32.240 t True free text no diff --git a/january-slates/golds/cpb-aacip-41-214mwjjg.tsv b/january-slates/golds/cpb-aacip-41-214mwjjg.tsv new file mode 100644 index 00000000..68fd5c67 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-214mwjjg.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-214mwjjg Art's the Thing 00:00:04.250 00:00:30.180 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-21ghx61z.tsv b/january-slates/golds/cpb-aacip-41-21ghx61z.tsv new file mode 100644 index 00000000..a1152587 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-21ghx61z.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-21ghx61z Carolina Journal 00:00:05.250 00:00:35.230 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-21tdz99t.tsv b/january-slates/golds/cpb-aacip-41-21tdz99t.tsv new file mode 100644 index 00000000..5975eae3 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-21tdz99t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-21tdz99t Art's the Thing 00:00:06.040 00:00:40.170 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-33dz0cwr.tsv b/january-slates/golds/cpb-aacip-41-33dz0cwr.tsv new file mode 100644 index 00000000..5e00125d --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-33dz0cwr.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-33dz0cwr Carolina Journal 00:00:04.290 00:00:32.220 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-34fn32g7.tsv b/january-slates/golds/cpb-aacip-41-34fn32g7.tsv new file mode 100644 index 00000000..6a9953d8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-34fn32g7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-34fn32g7 Carolina Journal 00:00:00.000 00:00:14.280 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-35gb5r1d.tsv b/january-slates/golds/cpb-aacip-41-35gb5r1d.tsv new file mode 100644 index 00000000..30f746a5 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-35gb5r1d.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-35gb5r1d Carolina Journal 00:00:05.030 00:00:29.040 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-39k3jfhm.tsv b/january-slates/golds/cpb-aacip-41-39k3jfhm.tsv new file mode 100644 index 00000000..346527e8 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-39k3jfhm.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-39k3jfhm Carolina Journal 00:00:06.010 00:00:33.130 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-48sbchtd.tsv b/january-slates/golds/cpb-aacip-41-48sbchtd.tsv new file mode 100644 index 00000000..0740ad56 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-48sbchtd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-48sbchtd Carolina Journal 00:00:06.190 00:00:37.220 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-569324rv.tsv b/january-slates/golds/cpb-aacip-41-569324rv.tsv new file mode 100644 index 00000000..b4a93949 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-569324rv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-569324rv Carolina Journal 00:00:06.170 00:00:29.150 t True key-value pairs countdown diff --git a/january-slates/golds/cpb-aacip-41-579s4tcv.tsv b/january-slates/golds/cpb-aacip-41-579s4tcv.tsv new file mode 100644 index 00000000..25019a4d --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-579s4tcv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-579s4tcv Carolina Journal 00:00:05.010 00:00:35.210 t True free text no diff --git a/january-slates/golds/cpb-aacip-41-644qrngt.tsv b/january-slates/golds/cpb-aacip-41-644qrngt.tsv new file mode 100644 index 00000000..f4d742a2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-644qrngt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-644qrngt Carolina Journal 00:00:04.280 00:00:24.080 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-644qrnhh.tsv b/january-slates/golds/cpb-aacip-41-644qrnhh.tsv new file mode 100644 index 00000000..c74df9ed --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-644qrnhh.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-644qrnhh Carolina Journal 00:00:04.280 00:00:27.080 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-655dvb4p.tsv b/january-slates/golds/cpb-aacip-41-655dvb4p.tsv new file mode 100644 index 00000000..4d4cd5eb --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-655dvb4p.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-655dvb4p Carolina Journal 00:00:05.060 00:00:28.130 t True free text no diff --git a/january-slates/golds/cpb-aacip-41-708w9q63.tsv b/january-slates/golds/cpb-aacip-41-708w9q63.tsv new file mode 100644 index 00000000..76833c13 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-708w9q63.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-708w9q63 Carolina Journal 00:00:05.250 00:00:29.160 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-7634tvxz.tsv b/january-slates/golds/cpb-aacip-41-7634tvxz.tsv new file mode 100644 index 00000000..917fc7ff --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-7634tvxz.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-7634tvxz Carolina Journal 00:00:05.070 00:00:33.240 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-78tb30hd.tsv b/january-slates/golds/cpb-aacip-41-78tb30hd.tsv new file mode 100644 index 00000000..ef65344a --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-78tb30hd.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-78tb30hd Carolina Journal 00:00:05.250 00:00:34.010 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-816m97tj.tsv b/january-slates/golds/cpb-aacip-41-816m97tj.tsv new file mode 100644 index 00000000..a56fad80 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-816m97tj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-816m97tj Carolina Journal 00:00:05.150 00:00:32.200 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-41-84mkm5br.tsv b/january-slates/golds/cpb-aacip-41-84mkm5br.tsv new file mode 100644 index 00000000..c0c0c653 --- /dev/null +++ b/january-slates/golds/cpb-aacip-41-84mkm5br.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-41-84mkm5br Carolina Journal 00:00:05.070 00:00:32.280 t True free text countdown diff --git a/january-slates/golds/cpb-aacip-81-032281c4.tsv b/january-slates/golds/cpb-aacip-81-032281c4.tsv new file mode 100644 index 00000000..d382c910 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-032281c4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-032281c4 Woman 00:00:05.080 00:00:19.080 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-11xd26xt.tsv b/january-slates/golds/cpb-aacip-81-11xd26xt.tsv new file mode 100644 index 00000000..2cf63624 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-11xd26xt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-11xd26xt Woman 00:00:05.100 00:00:11.270 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-19f4qtzt.tsv b/january-slates/golds/cpb-aacip-81-19f4qtzt.tsv new file mode 100644 index 00000000..b2baa5e6 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-19f4qtzt.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-19f4qtzt Woman 00:00:04.250 00:00:20.000 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-23hx3j34.tsv b/january-slates/golds/cpb-aacip-81-23hx3j34.tsv new file mode 100644 index 00000000..275d3f6b --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-23hx3j34.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-23hx3j34 Woman 00:00:06.040 00:00:23.200 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-2683bnv7.tsv b/january-slates/golds/cpb-aacip-81-2683bnv7.tsv new file mode 100644 index 00000000..ad9f2191 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-2683bnv7.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-2683bnv7 Woman 00:00:05.250 00:00:15.000 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-30bvqccj.tsv b/january-slates/golds/cpb-aacip-81-30bvqccj.tsv new file mode 100644 index 00000000..e2028d0b --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-30bvqccj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-30bvqccj Woman 00:00:05.150 00:00:14.090 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-34fn32xq.tsv b/january-slates/golds/cpb-aacip-81-34fn32xq.tsv new file mode 100644 index 00000000..8821a423 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-34fn32xq.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-34fn32xq Woman 00:00:05.090 00:00:15.120 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-37vmd08g.tsv b/january-slates/golds/cpb-aacip-81-37vmd08g.tsv new file mode 100644 index 00000000..620a1c16 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-37vmd08g.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-37vmd08g Woman 00:00:05.020 00:00:21.010 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-48sbchx0.tsv b/january-slates/golds/cpb-aacip-81-48sbchx0.tsv new file mode 100644 index 00000000..c1044d90 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-48sbchx0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-48sbchx0 Woman 00:00:05.120 00:00:16.030 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-49g4f9z1.tsv b/january-slates/golds/cpb-aacip-81-49g4f9z1.tsv new file mode 100644 index 00000000..c63f6794 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-49g4f9z1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-49g4f9z1 Woman 00:00:06.110 00:00:15.180 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-49t1g6kv.tsv b/january-slates/golds/cpb-aacip-81-49t1g6kv.tsv new file mode 100644 index 00000000..20874756 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-49t1g6kv.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-49t1g6kv Woman 00:00:05.080 00:00:15.090 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-558czgg5.tsv b/january-slates/golds/cpb-aacip-81-558czgg5.tsv new file mode 100644 index 00000000..c595d463 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-558czgg5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-558czgg5 Woman 00:00:04.290 00:00:20.160 h False boxes to fill in background movement diff --git a/january-slates/golds/cpb-aacip-81-65v6x4b5.tsv b/january-slates/golds/cpb-aacip-81-65v6x4b5.tsv new file mode 100644 index 00000000..b6b85ec2 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-65v6x4b5.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-65v6x4b5 Woman 00:00:05.160 00:00:14.260 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-708w9q47.tsv b/january-slates/golds/cpb-aacip-81-708w9q47.tsv new file mode 100644 index 00000000..596e238a --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-708w9q47.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-708w9q47 Woman 00:00:05.110 00:00:14.270 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-74cnpdn4.tsv b/january-slates/golds/cpb-aacip-81-74cnpdn4.tsv new file mode 100644 index 00000000..f8c1f098 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-74cnpdn4.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-74cnpdn4 Woman 00:00:05.150 00:00:19.180 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-74qjq9nj.tsv b/january-slates/golds/cpb-aacip-81-74qjq9nj.tsv new file mode 100644 index 00000000..a4ba1f84 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-74qjq9nj.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-74qjq9nj Woman 00:00:05.130 00:00:13.210 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-881jx33t.tsv b/january-slates/golds/cpb-aacip-81-881jx33t.tsv new file mode 100644 index 00000000..a55eef28 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-881jx33t.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-881jx33t Woman 00:00:00.000 00:00:05.040 h False boxes to fill in no diff --git a/january-slates/golds/cpb-aacip-81-902z3f9j.tsv b/january-slates/golds/cpb-aacip-81-902z3f9j.tsv new file mode 100644 index 00000000..51764e0e --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-902z3f9j.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-902z3f9j Woman 00:00:05.250 00:00:16.130 h False key-value pairs no diff --git a/january-slates/golds/cpb-aacip-81-90dv4bd1.tsv b/january-slates/golds/cpb-aacip-81-90dv4bd1.tsv new file mode 100644 index 00000000..f2fe48a7 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-90dv4bd1.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-90dv4bd1 Woman 00:00:05.120 00:00:15.270 h False key-value pairs no diff --git a/january-slates/golds/cpb-aacip-81-988gttr0.tsv b/january-slates/golds/cpb-aacip-81-988gttr0.tsv new file mode 100644 index 00000000..abb0d733 --- /dev/null +++ b/january-slates/golds/cpb-aacip-81-988gttr0.tsv @@ -0,0 +1,2 @@ +GUID collection start end type digital format-summary moving-elements +cpb-aacip-81-988gttr0 Woman 00:00:05.100 00:00:15.140 h False boxes to fill in no diff --git a/january-slates/guidelines.md b/january-slates/guidelines.md deleted file mode 100644 index b48b7197..00000000 --- a/january-slates/guidelines.md +++ /dev/null @@ -1 +0,0 @@ -***Needs to be updated*** diff --git a/january-slates/process.py b/january-slates/process.py index da6e8b57..34d22885 100644 --- a/january-slates/process.py +++ b/january-slates/process.py @@ -7,16 +7,12 @@ import argparse import pandas as pd +import numpy as np import os def process_csv(input_directory, output_directory): - desired_columns = [ - "GUID", "Series/Group", "Slate Start", "Slate End", - "Writing Types", "Recorded/Digital", "format of most of the information", - "Anything moving on screen during slate?" - ] - batchname = os.path.basename(input_directory)[7:] # chopping date prefix + desired_columns = ["GUID", "collection", "start", "end", "type", "digital", "format-summary", "moving-elements"] for filename in os.listdir(input_directory): if filename.endswith(".csv"): filepath = os.path.join(input_directory, filename) @@ -26,11 +22,13 @@ def process_csv(input_directory, output_directory): df.columns = [col.replace('"', '') for col in df.columns] df.columns = [col.replace(' ', '') for col in df.columns] df.rename(columns={ - 'SlateStart': 'Slate Start', - 'SlateEnd': 'Slate End', - 'WritingTypes': 'Writing Types', - 'formatofmostoftheinformation': 'format of most of the information', - 'Anythingmovingonscreenduringslate?': 'Anything moving on screen during slate?' + 'Series/Group': 'collection', + 'SlateStart': 'start', + 'SlateEnd': 'end', + 'WritingTypes': 'type', + 'Recorded/Digital': 'digital', + 'formatofmostoftheinformation': 'format-summary', + 'Anythingmovingonscreenduringslate?': 'moving-elements' }, inplace=True) for col in df.columns: if df[col].dtype == 'object': @@ -38,11 +36,42 @@ def process_csv(input_directory, output_directory): for _, row in df.iterrows(): guid = row['GUID'] tsv_filename = f"{guid}.tsv" - tsv_filepath = os.path.join(output_directory, batchname, tsv_filename) + tsv_filepath = os.path.join(output_directory, tsv_filename) os.makedirs(os.path.dirname(tsv_filepath), exist_ok=True) row_df = pd.DataFrame([row[desired_columns]]) - if row_df['Slate Start'].values[0]: - row_df.to_csv(tsv_filepath, index=False) + for time_col in ['start', 'end']: + v = row_df[time_col].values[0] + if v.startswith('no'): + row_df[time_col] = 'NO' + elif ';' in v: + # standard format is 00:00:00.000, which is 12 characters + row_df[time_col] = '.'.join(v.split(';')) + '0' * (12 - len(v)) + elif ':' in v: + row_df[time_col] = f'{v}.000' + v = row_df['type'].values[0] + if pd.isnull(v): + continue + elif v.lower().startswith('hand') or v.lower().startswith('fixed'): + row_df['type'] = 'h' + elif v.lower().startswith('type'): + row_df['type'] = 't' + elif len(v) == 0: + continue + else: + raise ValueError(f"Unknown type: {v}") + v = row_df['digital'].values[0] + if pd.isnull(v): + continue + elif v.lower().startswith('digit'): + row_df['digital'] = True + elif v.lower().startswith('record'): + row_df['digital'] = False + # elif len(v) == 0: + # continue + else: + raise ValueError(f"Unknown type: {v}") + if row_df['start'].values[0]: + row_df.to_csv(tsv_filepath, index=False, sep='\t') if __name__ == '__main__': diff --git a/january-slates/readme.md b/january-slates/readme.md index c452c4c7..aad6aeaa 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -36,18 +36,19 @@ Videos were opened in the AAPB viewer or in some unknown tool that had time info ## Annotation Guidelines: Transcribing/Closed Captioning For a quick overview of [slate types](https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit) please see this. The verbal guidelines for this project were to annotate as a superinterval/superset times the slate appeared, and details about its appearance. + ### Preparation A google sheet must be prepared to annotate the below columns. -Multiple videos must be prepared to be opened for annotation. -### Process of Annotating +A set of video videos must be prepared to be opened for annotation, preferably openable in mass in a video viewer that has some fraction of a second denomination. +### Process of Annotating Per column: * `GUID` - the AAPB id for that video e.g. "cpb-aacip-81-881jx33t". -> [!note] -> CPB is the [Corporation for Public Broadcasting](https://cpb.org/faq#1-1:~:text=Public%20Broadcasting%20(CPB)%3F-,CPB,-is%20a%20private). -> "aacip" is likely a collection name (unverified). -> The first number seems to be series number. Eg. 81 is "Woman", and "29" is both Prime Time Wisconsin" and "Wisconsin Week". -> The final number which includes letters is the unique guid number. + > [!Note] + > CPB is the [Corporation for Public Broadcasting](https://cpb.org/faq#1-1:~:text=Public%20Broadcasting%20(CPB)%3F-,CPB,-is%20a%20private). + > "aacip" is likely a collection name (unverified). + > The first number seems to be series number. Eg. 81 is "Woman", and "29" is both Prime Time Wisconsin" and "Wisconsin Week". + > The final number which includes letters is the unique guid number. * `Series/Group` - what tv series or group this video belongs to. * `Slate Start` - When the slate starts appearing. (See Decisions). Format likely "hr:mn:se:fr" out of 30 fps. * `Slate End` - When the slate stops being shown on screen. (See Decisions) @@ -61,8 +62,8 @@ Per column: This means the annotation will begin on a time/frame without the slate where possible (or 00:00:00.000) and is annotated as ending after the slate has disappeared. (This is currently unvalidated.) -> [!Note] -> This is opposite to the decision made in the Chyrons project. + > [!Warning] + > This is opposite to the decision made in the Chyrons project. * **Errors in the raw** - There are errors in the raw format, notably, in `CLAMS_slate_annotation_metadata.csv` [line 203](https://github.com/clamsproject/aapb-annotations/blob/f884e10d0b9d4b1d68e294d83c6e838528d2c249/january-slates/230101-aapb-collaboration-7/CLAMS_slate_annotation_metadata.csv?plain=1#L203) "cpb-aacip-394-150gbd75", column(Writing Types F) is a typo "typeed" instead of "typed". Further work should be done to check for other errors of this type. The `process.py` script should also be aware of these obvious errors, and fix and/or clean them up in the gold files. @@ -84,6 +85,65 @@ Annotation by the 2nd annotator paused/ended with line 1672 being the last annot * **Time Precision** - Because of the time format change, it should be assumed that the numbers without frames is only precise down to the second. The precision of the other annotations with frame precision is unverified. +## Data format and `process.py` + +### `raw` data +`.csv` file where each line is the time of when the slate frames appear in that video. +* Fields + * `GUID` + * `,` + * `Series/Group ,` + * `Slate Start ,` + * `Slate End ,` + * `Writing Types,` + * `Recorded/Digital` + * + * + * `,` + * `format of most of the information` + * `,` + * `Anything moving on screen during slate?` +> [!Important] +> There are extra commas added in and extra blank columns and extra space within the column names. +> Also, in some columns, there is a _comma suffixed_ to the raw value of the column. +* Example: + ``` + cpb-aacip-81-881jx33t,",","Woman ,","00:00:00;00 ,","00:00:05;04 ,","handwriting ,",recorded,,,",",boxes to fill in,",",no, + cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, + ``` + +### `process.py` +This script takes the raw data and converts it into a more usable format, by +1. removing the extra commas and spaces in the raw data, +2. taking out the extra comma suffixes in the raw data, +3. normalizing column names based on repository conventions, +4. normalizing some values, possibly fixing typos, (see below) + +### `gold` data +`.tsv` tabular format separated with tab (`U+0009`) characters. The gold files conform to the repository readme guideline that each gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. +* Fields: + * `GUID` - the same as the raw data + * `collection` - renamed from `Series/Group` + * `start` - renamed from `Slate Start` + * `end` - renamed from `Slate End` + * `type` - renamed from `Writing Types`, values are normalized to `h`, `t`, `o` for `handwritten`, `typed`, `other` respectively. + * `digital` - renamed from `Recorded/Digital`, values are normalized to boolean `True` or `False` values, where `True` means the slate is digitally encoded. + * `format-summary` - renamed from `format of most of the information` + * `moving-elements` - renamed from `Anything moving on screen during slate?` + * all other columns from the raw data are removed +* Example: + ``` + $ cat golds/cpb-aacip-81-881jx33t.tsv + GUID collection start end type digital format-summary moving-elements + cpb-aacip-81-881jx33t Woman 00:00:00.000 00:00:05.040 h False boxes to fill in no + + $ cat golds/cpb-aacip-41-34fn32g7.tsv + GUID collection start end type digital format-summary moving-elements + cpb-aacip-41-34fn32g7 Carolina Journal 00:00:00.000 00:00:14.280 t True key-value pairs countdown + ``` + > [!Note] + > Each file has the column header in it. + ## See also ### 2020 Evaluation Dataset From 1220ebdd62f4b7d37e4ba45c2c123b0474c91338 Mon Sep 17 00:00:00 2001 From: Keigh Rim Date: Fri, 22 Sep 2023 20:57:40 -0400 Subject: [PATCH 09/10] minor typo --- january-slates/readme.md | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/january-slates/readme.md b/january-slates/readme.md index aad6aeaa..2ee5d886 100644 --- a/january-slates/readme.md +++ b/january-slates/readme.md @@ -112,14 +112,14 @@ The precision of the other annotations with frame precision is unverified. cpb-aacip-41-34fn32g7,",","Carolina Journal ,","00:00:00;00 ,","00:00:14;28 ,","typed ,",digital?,,,",",key-value pairs,",",countdown, ``` -### `process.py` +### [`process.py`](process.py) This script takes the raw data and converts it into a more usable format, by 1. removing the extra commas and spaces in the raw data, 2. taking out the extra comma suffixes in the raw data, 3. normalizing column names based on repository conventions, 4. normalizing some values, possibly fixing typos, (see below) -### `gold` data +### `golds` data `.tsv` tabular format separated with tab (`U+0009`) characters. The gold files conform to the repository readme guideline that each gold must relate to only one GUID. Therefore, each of these gold files is only 1 video/GUID each. * Fields: * `GUID` - the same as the raw data From 9904589039b142cfb0028ee32c03601faf1bc495 Mon Sep 17 00:00:00 2001 From: jarumihooi Date: Thu, 28 Sep 2023 23:46:32 -0400 Subject: [PATCH 10/10] created template --- template-for-readme.md | 76 ++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 76 insertions(+) create mode 100644 template-for-readme.md diff --git a/template-for-readme.md b/template-for-readme.md new file mode 100644 index 00000000..eaef022e --- /dev/null +++ b/template-for-readme.md @@ -0,0 +1,76 @@ +# Official Project Name (Caps no dashes) + +## Project Overview + +### (Domain Knowledge Term Explanation optional?) +About the project goals. + +### Specs +* Annotation project name - proj name exactly same typing as the directory name, lowercase with dashes +* Annotator Demographics + * Number of annotators - enter + * Occupational description - enter + * Age range - enter + * Education - enter +* Annotation Environment information + * Name - Annotation tool name (no specifics) + * Version - enter + * Link/Tool Used/User Manual - (See below Tool Installation) +* Project changes + * Number of Batches - enter + * Other Version Control Information - None + +## Tool Installation: Name of Tool +Tool Link Here +Any intro needed for tool. + +## Annotation Guidelines +guidelines.{md/ppt/pdf/etc} Link Here. +Generally, prefer also to have a file copy of the current guidelines. +More editable links to ppt/videos may be acceptable where pictures,etc are needed. +Sometimes projects may not have a second file needed for guidelines. + +### Preparation +Things needed to be done before annotating begins. + +### What to Annotate +Per column: +* `col-header` - explanation + +### How to Annotate It +Explanation of phsyical how to do the annotation, what to press etc. Where needed. + +### Decisions, Differentiations, and Precision during Annotation +**Problem Name** - Information about Decisions that must be made during Annotation, for instance, Differentiation between two slate types. +**Problem Name** - Information on accuracy, precision, error that may be present in the dataset. + +## Data format and `process.py` +### `raw` data +`.format` file where - explanation. +* Fields + * `field-text1` + * `field-text2` +* Example: + ``` + example of raw data file here. + ``` + +### [`process.py`](process.py) +Describe what the script does in changing the raw to the gold. This may include data formatting conversions. + +### `golds` data +`.format` file - explanation. +* Fields: + * `field-text1` - blah + * `field-text2` - blah + * all other columns from the raw data are removed +* Example: + ``` + $ cat file name + example here. + ``` + +## (See also , optional?) + +### (Optional Fields?) +Validation sets, evaluations sets.