generated from amosproj/amos202Xss0Y-projname
-
Notifications
You must be signed in to change notification settings - Fork 1
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
1 parent
dfd45b9
commit 3f80a16
Showing
2 changed files
with
11 additions
and
0 deletions.
There are no files selected for viewing
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,11 @@ | ||
Title Assignees Status Priority Estimate Size Iteration | ||
meeting with Datev to understand better about the technology Done | ||
everybody have the access to the research material Done | ||
SM to check with the other two absent developers Done | ||
Gaia-X better understanding Done | ||
Consider re-schedule meeting with Datev Done | ||
SDs to split into frontend and backend teams Done | ||
Continue creating managable product backlog In Progress | ||
POs to have meeting with developers before each sprint to prioritize tasks on sprint backlog In Progress | ||
creating list for backlogs both from POs and SDs. In Progress | ||
define pushing convention when merging to main branch Todo |