Skip to content

Synthetic South Carolina 500-bus power system model

License

Notifications You must be signed in to change notification settings

caseformat/ACTIVSg500

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

2 Commits
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Synthetic South Carolina 500-bus power system model.

This is an entirely synthetic 500 bus case, geographically situated
in the northwestern part of the US state of South Carolina. The case is
designed with a 345 and 138 kV transmission network to serve
a load that roughly mimics the actual population of its geographic
footprint. The synthetic transmission system was designed by
algorithms described in [1] to be statistically similar to actual
transmission system models but without modeling any actual lines.

When publishing results based on this data, please cite:

[1] A.B. Birchfield, T. Xu, K.M. Gegner, K.S. Shetye, T.J. Overbye,
    "Grid Structural Characteristics as Validation Criteria for
    Synthetic Networks," IEEE Transactions on Power Systems,
    vol. 32, no. 4, pp. 3258-3265, July 2017.
    doi: 10.1109/TPWRS.2016.2616385

This is a synthetic power system model that does not represent the
actual grid. It was developed as part of the US ARPA-E GRID DATA
research project and contains no CEII.

One-line diagrams and other data formats available at:
    https://electricgrids.engr.tamu.edu

May 16, 2017

About

Synthetic South Carolina 500-bus power system model

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published