Refactor logger #901
test.yml
on: pull_request
Build
18s
Lint
19s
Test MySQL migrations
35s
Test Postgres migrations
28s
Test Sqlite migrations
19s
Matrix: Test
Annotations
7 errors
Test (20.x)
Process completed with exit code 2.
|
Test (18.x)
The job was canceled because "_20_x" failed.
|
Test (18.x)
Process completed with exit code 2.
|
Test (16.x)
The job was canceled because "_20_x" failed.
|
Test (16.x)
The operation was canceled.
|
Test (22.4.x)
The job was canceled because "_20_x" failed.
|
Test (22.4.x)
The operation was canceled.
|