Skip to content

Remove pyarrow dependency #18

Remove pyarrow dependency

Remove pyarrow dependency #18

Triggered via push November 22, 2023 04:53
Status Failure
Total duration 5m 25s
Artifacts 1
Matrix: linux-cross
Matrix: linux
Matrix: musllinux-cross
Matrix: musllinux
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

12 errors
musllinux (i686-unknown-linux-musl)
The job was canceled because "x86_64-unknown-linux-musl" failed.
musllinux (i686-unknown-linux-musl)
The operation was canceled.
musllinux-cross (aarch64-unknown-linux-musl, aarch64)
The process '/home/runner/work/_actions/uraimo/run-on-arch-action/v2.5.1/src/run-on-arch.sh' failed with exit code 1
musllinux-cross (armv7-unknown-linux-musleabihf, armv7)
The process '/home/runner/work/_actions/uraimo/run-on-arch-action/v2.5.1/src/run-on-arch.sh' failed with exit code 1
linux-cross (s390x)
The process '/home/runner/work/_actions/uraimo/run-on-arch-action/v2.5.1/src/run-on-arch.sh' failed with exit code 127
linux-cross (aarch64)
The job was canceled because "s390x" failed.
linux-cross (aarch64)
The operation was canceled.
linux-cross (armv7)
The job was canceled because "s390x" failed.
linux-cross (armv7)
The operation was canceled.
linux-cross (ppc64le)
The job was canceled because "s390x" failed.
linux-cross (ppc64le)
The operation was canceled.
macos
The process '/Users/runner/work/_temp/d4f156a2-5d5e-40da-b7ff-ce4dfa44ee8e/maturin' failed with exit code 1

Artifacts

Produced during runtime
Name Size
wheels Expired
6.36 MB