Sync with master, initial gguf implementation #203
test.yaml
on: pull_request
Matrix: macOS-latest
Matrix: macOS-metal-latest
Matrix: ubuntu-latest
Annotations
5 errors
macOS-latest (1.21.x)
Process completed with exit code 2.
|
macOS-metal-latest (1.21.x)
Process completed with exit code 2.
|
macOS-metal-latest (stable)
The job was canceled because "_1_21_x" failed.
|
macOS-latest (stable)
The job was canceled because "_1_21_x" failed.
|
macOS-latest (stable)
The operation was canceled.
|