bug fix 4509. Configuration parameters CA and address in peer.deliver… #2271
verify-build.yml
on: pull_request
Basic Checks
5m 15s
Unit Tests
12m 34s
Matrix: Integration Tests
Annotations
15 errors
Integration Tests (lifecycle)
Process completed with exit code 2.
|
Integration Tests (e2e)
The job was canceled because "lifecycle" failed.
|
Integration Tests (e2e)
The operation was canceled.
|
Integration Tests (raft)
The job was canceled because "lifecycle" failed.
|
Integration Tests (raft)
The operation was canceled.
|
Integration Tests (pvtdata)
The job was canceled because "lifecycle" failed.
|
Integration Tests (pvtdata)
The operation was canceled.
|
Integration Tests (sbe nwo msp)
The job was canceled because "lifecycle" failed.
|
Integration Tests (sbe nwo msp)
The operation was canceled.
|
Integration Tests (discovery gossip devmode pluggable)
The job was canceled because "lifecycle" failed.
|
Integration Tests (discovery gossip devmode pluggable)
The operation was canceled.
|
Integration Tests (gateway idemix pkcs11 configtx configtxlator)
The job was canceled because "lifecycle" failed.
|
Integration Tests (gateway idemix pkcs11 configtx configtxlator)
The operation was canceled.
|
Integration Tests (ledger)
The job was canceled because "lifecycle" failed.
|
Integration Tests (ledger)
The operation was canceled.
|