Skip to content

windows-2019

windows-2019 #158

Triggered via schedule September 3, 2023 10:15
Status Failure
Total duration 2h 13m 51s
Artifacts 4

windows-2019.yml

on: schedule
validate-dco  /  run
26s
validate-dco / run
Matrix: run / integration-test
run  /  unit-test-report
20s
run / unit-test-report
Matrix: run / integration-test-report
Fit to window
Zoom out
Zoom in

Annotations

4 errors
run / integration-test (builtin, ./...)
Process completed with exit code 1.
run / integration-test (containerd, ./...)
Process completed with exit code 1.
run / integration-test (containerd, DockerAPISuite|DockerBenchmarkSuite|DockerCLIAttachSuite)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 120 minutes.

Artifacts

Produced during runtime
Name Size
build-windows-2019 Expired
152 MB
windows-2019-integration-reports-builtin Expired
6.02 MB
windows-2019-integration-reports-containerd Expired
4.63 MB
windows-2019-unit-reports Expired
5.67 MB