Skip to content

Fix tests

Fix tests #204

Re-run triggered September 2, 2024 18:52
Status Failure
Total duration 2m 10s
Artifacts

run-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

39 errors
P8.3 - L10.25.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.2 - L10.25.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L10.25.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.25.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.1 - L10.25.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.25.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.1 - L10.25.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.25.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L10.25.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L10.25.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L10.25.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L10.25.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L10.25.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L10.25.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.3 - L10.25.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.25.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L10.25.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.25.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.1 - L10.25.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L10.25.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L10.25.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.1 - L10.25.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10_25__" failed.
P8.1 - L10.25.* - prefer-lowest - ubuntu-latest
The operation was canceled.