Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Release-testing: v8.5.0 tidb repo CI trigger do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#57639 opened Nov 22, 2024 by stevenayu Loading…
13 tasks
statistics: debug the update do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#57638 opened Nov 22, 2024 by Rustin170506 Loading…
13 tasks
statistics: do not record historical stats meta if the table is locked release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#57636 opened Nov 22, 2024 by Rustin170506 Loading…
1 of 13 tasks
planner, runtime_filter: Remove redundant logs whose meaning can be directly displayed by default behavior (#57626) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57634 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner, runtime_filter: Remove redundant logs whose meaning can be directly displayed by default behavior (#57626) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57633 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix the wrong schema.Clone implementation do-not-merge/needs-linked-issue release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#57632 opened Nov 22, 2024 by qw4990 Loading…
1 of 13 tasks
planner: fix that vector index output empty result when pk is non-int type do-not-merge/needs-tests-checked needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#57629 opened Nov 22, 2024 by winoros Loading…
13 tasks
planner/core: fix a wrong privilege check for CTE & UPDATE statement (#57430) cherry-pick-approved Cherry pick PR approved by release team. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57624 opened Nov 22, 2024 by ti-chi-bot Loading…
2 of 8 tasks
partition: set AddRecordOpt.isUpdate = true when update partition records (#57590) do-not-merge/cherry-pick-not-approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57622 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
build(deps): bump github.com/mgechev/revive from 1.5.0 to 1.5.1 dependencies Pull requests that update a dependency file do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. go Pull requests that update Go code needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#57621 opened Nov 22, 2024 by dependabot bot Loading…
build(deps): bump golang.org/x/oauth2 from 0.23.0 to 0.24.0 dependencies Pull requests that update a dependency file do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. go Pull requests that update Go code needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#57620 opened Nov 22, 2024 by dependabot bot Loading…
planner: Fix predicate simplification panic caused by zero-argument expressions like rand() (#56947) do-not-merge/cherry-pick-not-approved ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57618 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
statsitstics: avoid sync load column which is skiped type to analyze (#57144) cherry-pick-approved Cherry pick PR approved by release team. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#57617 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
statsitstics: avoid sync load column which is skiped type to analyze (#57144) cherry-pick-approved Cherry pick PR approved by release team. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57616 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
statsitstics: avoid sync load column which is skiped type to analyze (#57144) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57615 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
statistics: use infoschema api to get table info (#57574) approved cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57614 opened Nov 22, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: refactor test to use wait checkpoint method ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#57612 opened Nov 21, 2024 by Tristan1900 Loading…
1 of 13 tasks
ddl: dynamically adjusting the max write speed of reorganization job lgtm needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#57611 opened Nov 21, 2024 by fzzf678 Loading…
1 of 13 tasks
br: redact secret strings when logging arguments (#57593) approved cherry-pick-approved Cherry pick PR approved by release team. component/br This issue is related to BR of TiDB. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/bugfix This PR fixes a bug. type/cherry-pick-for-release-6.1 This PR is cherry-picked to release-6.1 from a source PR.
#57606 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: redact secret strings when logging arguments (#57593) cherry-pick-approved Cherry pick PR approved by release team. component/br This issue is related to BR of TiDB. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/bugfix This PR fixes a bug. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57604 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: redact secret strings when logging arguments (#57593) cherry-pick-approved Cherry pick PR approved by release team. component/br This issue is related to BR of TiDB. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/bugfix This PR fixes a bug. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#57603 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: redact secret strings when logging arguments (#57593) approved cherry-pick-approved Cherry pick PR approved by release team. component/br This issue is related to BR of TiDB. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/bugfix This PR fixes a bug. type/cherry-pick-for-release-7.1 This PR is cherry-picked to release-7.1 from a source PR.
#57602 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: redact secret strings when logging arguments (#57593) approved cherry-pick-approved Cherry pick PR approved by release team. component/br This issue is related to BR of TiDB. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/bugfix This PR fixes a bug. type/cherry-pick-for-release-6.5 This PR is cherry-picked to release-6.5 from a source PR.
#57601 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 13 tasks
runaway: only check statements with a non-empty plan digest (#57582) cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57599 opened Nov 21, 2024 by ti-chi-bot Loading…
1 of 5 tasks
*: for test do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#57597 opened Nov 21, 2024 by wjhuang2016 Loading…
13 tasks
ProTip! What’s not been updated in a month: updated:<2024-10-22.